M-101 AERCO Boiler Drawing.pdf

PDF 398 KB Posted

Attached to
Remove and Install Boilers- Building 1377, JBSA - Fort Sam Houston
Solicitation number
FA301625Q0188
Issued by

About this file

This document is a Mechanical Floor Plan for West Building 1377, providing a detailed schematic of the building's mechanical systems and infrastructure. The floor plan depicts a complex layout with multiple interconnected systems, including a Motor Control Center, Chemical Tanks, HVAC Control Panel, and various mechanical components. Key elements include multiple labeled equipment zones, piping and connection networks, and a structured grid system for precise spatial positioning. The drawing is technical in nature, with detailed annotations and references to specific building systems, suggesting this is a comprehensive engineering design document for facility mechanical infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1456810396C Rectangle This will be the AERCO boiler that will remove and replace.

File details come from the government source that posted it. Updated .