This document is a Questions and Answers (Q&A) file for a federal contract (FA301625Q0188) involving boilers removal and installation at Building 1377, JBSA – Fort Sam Houston. The Q&A covers technical specifics including a TACO 80-gallon steel expansion tank replacement, vent piping through the roof (with contractor responsible for patching), and heating hot water system details. Key requirements include using Fiber Glass with PVC lining for insulation, performing Lockout/Tagout (LOTO) on necessary equipment, and following a brand-name requirement for boilers. The incumbent controls contractor is Johnson Controls, and the project does not require temporary heating or power, nor will Procore be used for submittal exchanges. The Q&A also clarifies that chemical treatment is only required for the water side of the system, and no hazardous materials are present on mechanical piping or hangers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Included FA301625Q0188
Remove and Install Boilers – Building 1377, JBSA – Fort Sam Houston
Questions and Answers
3 Sep 2025
1. What is the size and material of construction of the expansion tank we are replacing?
Answer: TACO expansion tank 80 gallons steel
2. Is this project tax exempt? If so, will a tax-exemption certificate be provided?
Answer: Please see FAR 52.212-4(k) and FAR 29.302
3. Will the government furnish any as-built drawings?
Answer: See attached Mechanical Floor Plan – West, Bldg. 1377
4. Are there hazardous materials on the mechanical piping or hangers?
Answer: No
5. Will the contractor be allowed to provide boilers that have the same salient characteristics that are specified in the scope of work?
Answer: No, this is a brand name requirement. See Solicitation and Technical Factor 1.
6. What are the insulation specifications for the heating hot water system?
Answer: Fiber Glass with PVC lining
7. Will the contractor be required to perform the LOTO of utilities?
Answer: Yes, only to the necessary equipment that needs to be secure.
8. Who is the incumbent controls contractor?
Answer: Johnson Controls
9. Does the vent piping run through the roof? If so, is the contractor responsible for roof patching?
Answer: Yes, the vent piping runs through the roof. The contractor will be responsible for any patching.
10. Is the contractor required to provide chemical treatment to the hot water heating system?
Answer: No, just to the water side.
11. Will the contractor be required to provide temporary heating?
12. Will the contractor be required to provide temporary power?
13. Will C/E utilize Procore for submittal exchanges?