Amendment 06.pdf

PDF 109 KB Posted

Attached to
100% WOSB-Design Build Construction, Repave C St East Full Depth Repair-JBSA Randolph
Solicitation number
FA301621R0056
Issued by

About this file

This document is an amendment to a federal solicitation for design-build construction services. The amendment adds the Heavy and Highway wage determination for Texas for 2021 and confirms that all other terms and conditions of the original solicitation remain unchanged. The solicitation is for reconstruction and full depth repair of approximately 1,380 linear feet of C Street East on Joint Base San Antonio Randolph involving roadway, curb and gutter, pavement marking, and associated roadway work. This opportunity is set aside for woman-owned small businesses and involves design and construction services for the repaving project.

View the file

Other files

File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
SOW-08272021-Revised.pdf PDF
Amendment 3.pdf PDF
Atch 1 - SOW-07142021.pdf PDF
Amendment 02-Attachment C St Pre-Pre-Proposal.pdf PDF
Amendment 02-Attachment CStreetSiteVisit.pdf PDF
Solicitation Amendment 02 FA301621R00560002 SF 30-.pdf PDF
Solicitation Amendment-01 FA301621R00560001 SF 30.pdf PDF
Atch 9-Financial Information Questionnaire.docx DOCX document
C - Demo Locations.pdf PDF
J - LBP-B Street East - H and I East.pdf PDF
Atch 6-Base Access_Request Form.pdf PDF
F - Utilities Maps.pdf PDF
B - Project Boundary.pdf PDF
Atch 5-RFI Template.xlsx XLSX spreadsheet
Atch 3-Ozone Depletion Control Compliance.pdf PDF
H - DD1354 - Project Closeout.pdf PDF
APPENDIX COVER.pdf PDF
A - LOCATION MAP.pdf PDF
I- AW TRENCH PICTURE.pdf PDF
L- C St WEST Trench Photos June 2021.pdf PDF
E- American Water Design Plans - C St East.pdf PDF
K- AW ROAD CLOSURES.pdf PDF
Solicitation - FA301621R0056.pdf PDF
Atch 2-AETC Form 47.pdf PDF
G - Dig Perm (AF 103).pdf PDF
Atch 10-Contractor Responsibility Questionnaire.docx DOCX document
Atch 1 - SOW-07142021.pdf PDF
Atch 8-Sample Progress Schedule.xlsx XLSX spreadsheet
Atch 4-HAZMAT Letter.pdf PDF
Atch 7-Sample - Cost Estimate Breakdown.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

FA301621R00560006

"General Decision Number: TX20210007 01/01/2021

Superseded General Decision Number: TX20200007

State: Texas

Construction Types: Heavy and Highway

Counties: Atascosa, Bandera, Bastrop, Bell, Bexar, Brazos, Burleson, Caldwell, Comal, Coryell, Guadalupe, Hays, Kendall, Lampasas, McLennan, Medina, Robertson, Travis, Williamson and

Wilson Counties in Texas.

HEAVY (excluding tunnels and dams, not to be used for work on

Sewage or Water Treatment Plants or Lift / Pump Stations in

Bell, Coryell, McClennon and Williamson Counties) and HIGHWAY

Construction Projects

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/01/2021

* SUTX2011-006 08/03/2011

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Paving and

Structures)......................$ 12.56

ELECTRICIAN......................$ 26.35

FORM BUILDER/FORM SETTER

Paving & Curb...............$ 12.94

Structures..................$ 12.87

LABORER

Asphalt Raker...............$ 12.12

Flagger.....................$ 9.45

Laborer, Common.............$ 10.50

Laborer, Utility............$ 12.27

Pipelayer...................$ 12.79

Work Zone Barricade

Servicer....................$ 11.85

PAINTER (Structures).............$ 18.34

POWER EQUIPMENT OPERATOR:

Agricultural Tractor........$ 12.69

Asphalt Distributor.........$ 15.55

Asphalt Paving Machine......$ 14.36

Boom Truck..................$ 18.36

Broom or Sweeper............$ 11.04

Concrete Pavement

Finishing Machine...........$ 15.48

Crane, Hydraulic 80 tons or less.....................$ 18.36

Crane, Lattice Boom 80 tons or less................$ 15.87

Crane, Lattice Boom over

80 tons.....................$ 19.38

Crawler Tractor.............$ 15.67

Directional Drilling

Locator.....................$ 11.67

Directional Drilling

Operator....................$ 17.24

Excavator 50,000 lbs or

Less........................$ 12.88

Excavator over 50,000 lbs...$ 17.71

Foundation Drill, Truck

Mounted.....................$ 16.93

Front End Loader, 3 CY or

Less........................$ 13.04

Front End Loader, Over 3 CY.$ 13.21

Loader/Backhoe..............$ 14.12

Mechanic....................$ 17.10

Milling Machine.............$ 14.18

Motor Grader, Fine Grade....$ 18.51

Motor Grader, Rough.........$ 14.63

Pavement Marking Machine....$ 19.17

Reclaimer/Pulverizer........$ 12.88

Roller, Asphalt.............$ 12.78

Roller, Other...............$ 10.50

Scraper.....................$ 12.27

Spreader Box................$ 14.04

Trenching Machine, Heavy....$ 18.48

Servicer.........................$ 14.51

Steel Worker

Reinforcing.................$ 14.00

Structural..................$ 19.29

TRAFFIC SIGNAL INSTALLER

Traffic Signal/Light Pole

Worker......................$ 16.00

TRUCK DRIVER

Lowboy-Float................$ 15.66

Off Road Hauler.............$ 11.88

Single Axle.................$ 11.79

Single or Tandem Axle Dump

Truck.......................$ 11.68

Tandem Axle Tractor w/Semi

Trailer.....................$ 12.81

WELDER...........................$ 15.97

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Heavy and Highway TX20210007 01.01.2021

IDCode:
Page: 1
Pages: 2
AmendNo: 0006
EffDate: 09 Sep 2021
ReqNo:
ProjNo: TYMX216966
IssCode: FA3016
AdmCode:
IssuedBy: FA3016 502 CONS CL

1655 SELFRIDGE AVE BLDG 5450

CP 210-671-3617

JBSA LACKLAND, TX 78236-5286

UNITED STATES

Kathryn Morkin, Email: kathryn.morkin.1@us.af.mil Telephone: 487-8874

AdminBy:
ContractorNameAdd:
SolNo: FA301621R0056
SolChg: 1
SolDate: 06 Aug 2021
AwardChg: Off
AwardNo:
Code:
FacCode:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

The purpose of this amendment is to:

1) Add Wage Determination Heavy and Highway TX20210007 dated 01/01/2021

All other Terms and Conditions remain the same

ContNameTitle:
CoNameTitle: MARCUS J. REEDOM

Email: marcus.reedom.2@us.af.mil Telephone: 210-652-8427

ContDate:
CODate:

File details come from the government source that posted it. Updated .