This document provides details for a federal design-build contract opportunity to reconstruct a section of roadway on Joint Base San Antonio Randolph in Texas. The Woman Owned Small Business set-aside opportunity involves designing and completing full depth replacement of approximately 1,380 linear feet of C Street East, including roadway, curb, gutter, pavement markings, and other repairs. Interested offerors must submit technical proposals by August 20th, 2021 addressing their work breakdown structure and schedule, as well as a narrative of the major work elements. The Department of the Air Force Air Education and Training Command is the contracting agency. Questions regarding the solicitation must be submitted in writing by the deadline for responses to be addressed.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBSA Vision: The Premier Installation in the Department of Defense!
One Team, One Mission
JBSA-Randolph
FA301621R0056
Pre-Bid Conference Site Visit
Marcus J. Reedom Section Chief Construction Contracting
Project Description
This is design build project. This effort is being set aside for Woman Owned Small Business concerns. The Contractor shall provide design and complete reconstruction for full depth road replacement of C Street East on JBSA Randolph. The work shall include all necessary labor, materials, equipment, and supervision to perform roadway, curb and gutter, pavement marking, and associated roadway repairs for approximately 1,380 LF x 34-ft wide section of C St East from Northeast Dr to 5th St East.
Notice to Offeror(s)
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort.
No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
WOSB Certification
• The certification process for WOSBs and EDWOSBs has changed. SBA has implemented Congress’ changes to the WOSB Federal Contracting Program, as put forth in the 2015 National Defense Authorization Act (NDAA).
• The updated WOSB Federal Contracting Program regulations were published in the Federal Register in May 2020.
• Program participation will be displayed on the firm’s Dynamic Small Business Search profile.
• SBA’s new free, online certification process for WOSBs and EDWOSBs is live on SBA’s new online portal: beta.certify.sba.gov.
Questions
All questions regarding this solicitation must be submitted in writing. All correspondence should reference the solicitation number. All questions and subsequent answers will be posted to the beta.sam.gov website. It is the responsibility of the offeror to continuously monitor the site for updates. All questions must be submitted electronically to the individual(s) listed in paragraph J below no later than 1400 hrs (2:00PM) CST on the 20th of August, 2021. Any questions submitted after this period may not be answered. The Government will assume no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for proposals or related documents.
Part II -TECHNICAL PROPOSAL
• Part II -TECHNICAL PROPOSAL
• Offerors shall meet a standard in the Technical Factor in order for their technical proposal to be determined "technically acceptable." The standards are defined in Section M for the factor.
• 1. Technical:
• Sub-factor # 1, Work Breakdown Structure (WBS) with corresponding detailed estimated project schedule (e.g., MS Project Gantt Chart or similar format). The project schedule should include major tasks, activities, and a clearly identified critical path. The WBS can be incorporated in the project schedule if the tasks are clearly identified.
• Sub-factor # 2, Technical Narrative which addresses the major elements of work in the WBS, sequenced substantially similar to the WBS. The technical narrative should not exceed five (5) 8 1/2 x 11 in., single-sided, single-spaced, Times New Roman, 12pt font pages.
Project Location
| Slide Number 1 |
| Project Description |
| Notice to Offeror(s) |
| WOSB Certification |
| Questions |
| Part II -TECHNICAL PROPOSAL � |
| Project Location |
| Slide Number 8 |
File details come from the government source that posted it. Updated .