Atch 9-Financial Information Questionnaire.docx

DOCX document 23 KB Posted

Attached to
100% WOSB-Design Build Construction, Repave C St East Full Depth Repair-JBSA Randolph
Solicitation number
FA301621R0056
Issued by

About this file

This document contains a financial information questionnaire for a contractor bidding on solicitation number FA301621R0056 from the Department of the Air Force Air Education and Training Command. The solicitation is for a 100% Woman Owned Small Business set-aside design-build construction project to repave approximately 1,380 linear feet of C Street East at Joint Base San Antonio Randolph. The contractor shall provide design and complete reconstruction for full depth road replacement, including curb and gutter, pavement marking, and associated roadway repairs. The financial information questionnaire requires the contractor's financial institution to provide details such as the length of the contractor's account, current status, accounting practices, types of accounts held, operational balances, and any existing lines of credit.

View the file

Other files

File Type Posted
Amendment 06.pdf PDF
Amendment 5.pdf PDF
Amendment 4.pdf PDF
SOW-08272021-Revised.pdf PDF
Amendment 3.pdf PDF
Atch 1 - SOW-07142021.pdf PDF
Amendment 02-Attachment C St Pre-Pre-Proposal.pdf PDF
Amendment 02-Attachment CStreetSiteVisit.pdf PDF
Solicitation Amendment 02 FA301621R00560002 SF 30-.pdf PDF
Solicitation Amendment-01 FA301621R00560001 SF 30.pdf PDF
C - Demo Locations.pdf PDF
J - LBP-B Street East - H and I East.pdf PDF
Atch 6-Base Access_Request Form.pdf PDF
F - Utilities Maps.pdf PDF
B - Project Boundary.pdf PDF
Atch 5-RFI Template.xlsx XLSX spreadsheet
Atch 3-Ozone Depletion Control Compliance.pdf PDF
H - DD1354 - Project Closeout.pdf PDF
APPENDIX COVER.pdf PDF
A - LOCATION MAP.pdf PDF
I- AW TRENCH PICTURE.pdf PDF
L- C St WEST Trench Photos June 2021.pdf PDF
E- American Water Design Plans - C St East.pdf PDF
K- AW ROAD CLOSURES.pdf PDF
Solicitation - FA301621R0056.pdf PDF
Atch 2-AETC Form 47.pdf PDF
G - Dig Perm (AF 103).pdf PDF
Atch 10-Contractor Responsibility Questionnaire.docx DOCX document
Atch 1 - SOW-07142021.pdf PDF
Atch 8-Sample Progress Schedule.xlsx XLSX spreadsheet
Atch 4-HAZMAT Letter.pdf PDF
Atch 7-Sample - Cost Estimate Breakdown.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301621R0013

Contractor’s Name:

Contractor's Point of Contact:

Contractor's Financial Institution:

Financial Institution's Phone:

(To Be Completed by Financial Institution)

1. How long has the contractor had an account with your financial institution? ____________________

2. What is the contractor's current status with the financial institution? (e.g., poor, good, excellent) ___________________

Any additional comments? ______________________________________________________________

3. Has the company's accounting practices been satisfactory? ______________

If not, why? __________________________________________________________________________ ___________________________________________________________________________________

4. Indicate number and type of accounts the company have with the institution?

5. What is the company's current operational balance? (e.g., low, moderate, or high--five, six figure, etc.) __________________________

6. Does the contractor have a line of credit?____________________

If so, what is the limit (e.g., low, moderate, or high--five, six figure, etc.)? _______________________

Signature

Financial Institution Representative’s Title

Date

File details come from the government source that posted it. Updated .