FA301621R0022
Photonic Laser Install
30 Apr 2021 Site Visit Questions Rev3 18 May 2021
1. Will a point of contact be provided for the local utility power company having jurisdiction for the facility?
Answer: Brook W. Bedell
Military Strategic Relations Manager
CPS Energy | 145 Navarro, San Antonio, TX 78205 |MD: 111007
Office: 210.353.3247 | Mobile: 210.632.6983 bwbedell@cpsenergy.com
Andrew Robertucci, EIT
Military Technical Solutions Manager
CPS Energy |500 McCullough, San Antonio, Texas 78215 | MD: RT0401
Office: (210) 353-4816 | Mobile: (210) 238-9639
ARobertucci@cpsenergy.com
Marco A. Garcia, P.E.
Technical Solutions Mgr. | Military and Managed Accounts
CPS Energy | 500 McCullough San Antonio, Texas 78215 | MD: RT0401
Office: 210.353.3355 | Mobile: 210.912.1627
MAGarcia@cpsenergy.com
2. The installation of Government Furnished Equipment identified in the RFP Specifications Section 01 73 19, paragraph 2.1.b. stipulates 4 chillers to be installed. This seems to conflict with the RFP Specification Section 01 11 00.10 which states: “The Contractor shall connect chilled water supply/return lines between (3) chillers to laser and collimator.” Also, the Concept Site Plan (sheet C-102) seems to indicate 3 chillers. Please verify the quantity of chillers.
Explanation to the answer given: There are a total of four (4) AHU units three (3) on the outside of the facility will be connected directly to the laser and it components, and one on the inside of the facility next to the anechoic chamber that shall be a remove and replace with a larger AHU to fill the requirement of sufficient air exchange that the anechoic chamber requires when the laser is operating.
mailto:bwbedell@cpsenergy.com mailto:ARobertucci@cpsenergy.com mailto:MAGarcia@cpsenergy.com
30 Apr 2021 Site Visit Questions Rev3 18 May 2021
NOTE: The question is about (Government Furnished Equipment) the fourth is not Government supplied.
3. Appendix E, Air Water Chiller Specifications show the electrical characteristics of the equipment require 50 Hz frequency, 400V, 3 Phase. However, the Operating Manual shown on Appendix B for the Laser Chiller shows 60Hz frequency at 460V, 3 Phase. Please verify there are no 50 Hz frequency requirements.
Answer: 60hz.
Explanation to the answer given: (From the Manufacture Operating Manual) The hydraulic module and the refrigerant module can use either or as needed for 50 or 60 Hz operation. What we have is 60hz.
a) Setting of the bypass valve for 60 Hz operation:
The valve is set at the factory for 5.0 bar, which is the appropriate setting for 60 Hz operation
b) Setting of the bypass valve for 50 Hz operation:
It is recommended for 50 Hz operation that the valve be adjusted to 3.5 bar.
4. Will a hard copy bid bond need to be provided even though we are sending the proposal with the bond electrically through DOD Safe?
Answer: Attachment 5 - Section L, Para 3.1.6 Tab 6 - An electronic copy of the bond shall be provided with the electronic version of the Volume I proposal. The original bond must still be provided within 3 business days from the notification to the successful Offeror.
5. Are restrooms are available onsite for contractor use?
Answer: No, access to the building is tightly controlled. Please provide a portable toilet.
6. Is office space available for contractor use?
Answer: No.
30 Apr 2021 Site Visit Questions Rev3 18 May 2021
7. What is the overall air exchange goal in the anechoic chamber?
Answer: For animal research, the standard is 10-15 air changes per hour while maintaining a negative room pressure. For proper laser function, the rooms should be maintained between 69°F +/- 2 degrees. Snorkel shall have appropriate aperture size, exhaust velocity, and filtration required to capture all chemicals/off gases. Please use this guidance to design an air exchange that can maintain these requirements.
8. Is the existing AHU located just outside the anechoic chamber staying or is it to be demolished?
Answer: AHU outside the will be salvaged and turned over to the 502d CE operations flight in working order. Please see question #21.
9. What is the length of the conduit run from the anechoic chamber to the electrical room?
a. Please confirm this conduit may be run on the outside of the building as discussed at the site walk.
b. Please confirm we can make a penetration to the exterior of the electrical room, and from the outside of the hall way going into the chamber.
Answer: a. SCALE OF AS-BUILT DRAWINGS PROVIDED 1/8” = 1’ the contractor shall confirm all measurements.
b. Penetration to the exterior of the electrical room, and from the outside of the hallway going into the chamber will be determined by the designer of record and approved by the 802 CES
10. What amperage is available to pull from the electrical room to the anechoic chamber?
Answer: There are 2 each 500Amp spares in the electrical room.
11. Please provide specifications for the cement backer board.
Answer: https://www.homedepot.com/p/James-Hardie-HardiePanel-HZ10-5-16-in-x-48-in-x-96-in- Fiber-Cement-Sierra-8-Panel-Siding-9003080/305684630 or compatible material.
12. Please provide dimensions for the interior of the anechoic chamber.
Answer: 21’ X 25’.
https://www.homedepot.com/p/James-Hardie-HardiePanel-HZ10-5-16-in-x-48-in-x-96-in-Fiber-Cement-Sierra-8-Panel-Siding-9003080/305684630 https://www.homedepot.com/p/James-Hardie-HardiePanel-HZ10-5-16-in-x-48-in-x-96-in-Fiber-Cement-Sierra-8-Panel-Siding-9003080/305684630
13. Is commissioning required? Multiple sections of the specifications mention commissioning as follows, but there is no spec section 01 91 00.15. Please confirm to what extend commissioning is required.
1.6.1 Commissioning
Submit approved Final Commissioning Report required by Section 01 91 00.15 TOTAL BUILDING
COMMISSIONING as proof of this tracking requirement.
Answer: Yes the commissioning of the new AHU’s are required.
14. What type of pipe will be required between the chiller and the equipment?
Answer: A pipe that run from the outside Chillers thru the wall into the interior of the Lab that will fit the recommend 3 hose sizes IAW Laser Chiller LC 340.01-A.3.5/6 and control cables.
Copper pipe most likely will be used.
15. Please clarify what new and existing equipment we will tie into on the electrical side.
Answer: Lasers will require the new electrical service, (500Amp) New Chillers will require needed electrical service, Air Handler Supply and exhaust VSD’s for Chamber area will require electrical service. There is an existing electrical service for the chamber Air Handler but changing the size will require an assessment that may need more electrical support.
16. Please clarify what new and existing equipment we will tie into on the mechanical side.
Answer: Unsure on question- Mechanical side has a new Chamber AHU being installed with VSD’s supporting supply and exhaust compliance requirements (Air Changes) as well as temperature control.
We were informed the current chamber AHU will not meet these requirements therefore must be replaced with this new mission application.
There also is an existing tertiary loop mechanical chilled water loop in the room. This will not be used for this new room requirement
The exhaust for the snorkels as well as the Air Handler room exhaust being used for air changes currently ties into a collective chamber exhaust header. This new install will need to cap the
30 Apr 2021 Site Visit Questions Rev3 18 May 2021 exhaust into the header and ensure this rooms snorkel and chamber exhaust is independent to itself which will require new ductwork and an exterior wall penetration
17. How far will the chillers be from the equipment?
Answer: Approx 44’.
18. Is Test and Balance required on this project?
Answer: Yes, Test and Balance should be part of the commissioning report.
19. Is there a designated controls contractor for the base? If so, please provide contact information.
Answer: Question should be directed to CES contracting office, as they hold the contract with the controls contractor. Base currently uses JCI filed controls/ Tridium supervisory controls systems. Base has a JCI service contract for Controls so recommendation would be JCI, if possible
20. Please describe the overall air exchange goal.
Answer: Both the exterior and interior of the anechoic chamber should function independently of each other, yet both be balanced with each other. Maintaining adequate air flow, negative pressurization, temperature and exhaust, please also see question # 7.
21. Is the existing AHU adjacent to the anechoic chamber to remain, or will it be replaced?
Answer: The existing AHU is to be replaced, to match the exchange rate given in answer #7 to meet desired air changes for compliance with this new mission requirement
22. Please confirm that all line items in the submittal register document are applicable to this project.
Answer: Would this be adequate for air flow needs? Otherwise Replaced also, please see question #21
23. Specifications section 01 11 00.10 1.2.1 Project description states “Manufacture a frame to hold the panels that allows the ability to slide graphite plates right/left for future removal and replacement as necessary.” Please provide dimensions/drawings for the frame on each side of the corner. We need to know the width, are there to be multiple rows for these plates, etc.
Answer: Graphite plates for use in the chamber - 1 X 12 X 72 inches covering 12 lineal feet. 6’ of which was moveable along the 21’ wall and 4’ on adjoining walls.
http://graphitestore.com/medium-extruded-graphite-plate- 1h?custcol_width=2&custcol_length=10
Aluminum or metal U-Channel that fits graphite plates at top and bottom with a design to remove and replace graphite plates as required.
No multiple rows.
24. Specifications section 01 11 00.10 1.2.1 Project description states “Install Government provided IPG Photonics remote Air/Water model LC 340.01-A.3.6, 460V, 60Hz along exterior of facility.”
Please confirm if this means on the exterior of the chamber, the room, or the building. Is this going in the chiller yard?
Answer: The chillers will be installed in the chiller yard with piping run thru the exterior wall into interior to connect to Laser.
Note: Hose sizes should be IAW Chiller Operating Manual LC 340.01-A.3.5/6.
25. Please confirm that the IPG Collimator is provided by the government.
Answer: Government supplies IPG Collimator.
26. How is the cement backer board to be attached to the interior of the anechoic chamber without compromising the chamber? Are there studs we are able to mount to?
Answer: Contractor will be able to mount to interior wall of chamber, which is metal.
http://graphitestore.com/medium-extruded-graphite-plate-1h?custcol_width=2&custcol_length=10 http://graphitestore.com/medium-extruded-graphite-plate-1h?custcol_width=2&custcol_length=10
27. Is any asbestos testing or abatement required on this project? The only verbiage found was on the submittal register sheet.
Answer: No, this facility was built in 2010, there no use of asbestos products. The contractor may conduct a survey.
28. Is import material required for the new chiller yard?
Answer: No
29. Is a fire protection engineer required for the project as specified? Specifications section 01 11 00.10 1.2.1 Project description states “There are no modifications to the fire protection system.”
Answer: A Fire protection Engineer has evaluated this project.