SUBMITTAL REGISTER
TITLE: Install Laser B-3260
JOB NAME: JBSF208542
LOCATION: JBSA Fort Sam Houston
CONTRACT NO:
CONTRACTOR:
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line Activity
Transmittal
Specification
Section
SD
Submittal Description Item Submitted
Paragraph
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of
Action
Date FWD to
APPR /
Auth Date
RCD
From
CONTR
Date
FWD
To
Other Revwr
Date
RCD
From Other
Reviewer Action Code
Date Of
Action
Mailed To
CONTR/
Date
RCD
From
APPR
Authority Remarks
1 01 11 00.10 01 Preconstruction Submittals Salvage Plan
2 01 14 00 01 Preconstruction Submittals list of Contract Personnel 1.4.1.1 G
3 01 14 00 01 Preconstruction Submittals Installation Access 1.4.1.2
4 01 30 00 01 Preconstruction Submittals View Location Map 1.3 G
5 01 30 00 01 Preconstruction Submittals
Progress and Completion Pictures
1.4 G
6 01 32 16.00 20 01 Preconstruction
Submittals
Baseline Construction Schedule
1.2 G
7 01 32 16.00 20 01 Preconstruction
Submittals Baseline Design Schedule 1.2 G
8 01 32 16.00 20 07 Certificates Monthly Updates 1.4
9 01 33 00 01 Preconstruction Submittals Submittal Register 1.7 G
10 01 33 16.00 10 01 Preconstruction
Submittals
Advanced Modeling Project Execution Plan (PxP)
1.7.2 C
11 01 33 16.00 10 01 Preconstruction
Submittals Design Quality Control Plan 1.5.1 G
12 01 33 16.00 10 01 Preconstruction
Submittals Initial Design Conference 1.5.2.2
13 01 33 16.00 10 01 Preconstruction
Submittals Preconstruction Conference 1.5.2.5
14 01 33 16.00 10 01 Preconstruction
Submittals DCM Procedures 3.5.1 G
15 01 Submittal Register 3.8.4 G
Page 1 of 5SpecsIntact Submittal Register Data
1/13/2021file:///G:/502_CES/CENMPF_PROJECTS/SpecsIntactWD1/Jobs/JBSF1098542/Exports/UFGS4288.htm
Attachment 2 - Submittal Register
01 33 16.00
Preconstruction Submittals
16 01 33 16.00 10 05 Design Data Design and Code
Checklists 1.7.1 C
17 01 33 16.00 10 05 Design Data Sustainable
Design 2.5 C
18 01 33 16.00 10 05 Design Data Interim Design
Submittals 3.2.1 R
19 01 33 16.00 10 05 Design Data Building Rendering
20 01 33 16.00 10 05 Design Data
Interior And Exterior Building Finishes Scheme
3.6.5.1.1 G
21 01 33 16.00 10 05 Design Data Furniture, Fixtures
& Equipment 3.6.5.2.3 G
22 01 33 16.00 10 05 Design Data Conference
Documentation 3.7.3
23 01 33 16.00 10 05 Design Data Final Design
Submittals 3.8 R
24 01 33 16.00 10 05 Design Data Design Complete
Documents 3.9 C
25 01 33 16.00 10 11 Closeout
Submittals DD Form 1354 3.8.5 A
26 01 33 29 01 Preconstruction Submittals
Preliminary High Performance and Sustainable Building Checklist
1.5.3.1 G
27 01 33 29 01 Preconstruction Submittals
Sustainability Action Plan 1.4.1 G
28 01 33 29 01 Preconstruction Submittals
Preliminary Sustainability eNotebook
1.5.3.1 G
29 01 33 29 11 Closeout Submittals
Final High Performance and Sustainable Building Checklist
1.5.3.1 G
30 01 33 29 11 Closeout Submittals
Final Sustainability eNotebook 1.5.3.1 G
31 01 33 29 11 Closeout Submittals
Amended Final Sustainability eNotebook
1.5.3.1 G
32 01 33 29 11 Closeout Submittals
Amended Final High Performance and Sustainable Building Checklist
1.5.3.1 G
33 01 35 26 01 Preconstruction Submittals
Accident Prevention Plan
(APP)
1.6 G
34 01 35 26 06 Test Reports Notifications and Reports 1.11
35 01 35 26 06 Test Reports Accident Reports 1.11.2 G
36 01 35 26 07 Certificates Activity Hazard Analysis (AHA) 1.7
Page 2 of 5SpecsIntact Submittal Register Data
N/A
37 01 35 26 07 Certificates Confined Space Entry Permit
1.8.1
38 01 35 26 07 Certificates Hot Work Permit 1.8.1
39 01 35 26 07 Certificates Certificate of Compliance
40 01 45 00.10 20 01 Preconstruction
Submittals QC Plan 1.6 G
41 01 50 00 01 Preconstruction Submittals
Construction Site Plan 1.3 G
42 01 50 00 01 Preconstruction Submittals Traffic Control Plan 3.4.1 G
43 01 50 00 01 Preconstruction Submittals Haul Road Plan 2.2.1 G
44 01 50 00 06 Test Reports Backflow Preventer Tests 2.4
45 01 50 00 07 Certificates Backflow Tester 1.4.1
46 01 50 00 07 Certificates Backflow Preventers 1.4
47 01 57 20 01 Preconstruction Submittals
ENVIRONMENTAL
PROTECTION
PLAN
1.6 G
48 01 57 20 01 Preconstruction Submittals
ENVIRONMENTAL
PROTECTION
PLAN
3.16 G
49 01 57 20 01 Preconstruction Submittals
Fish and Wildlife Protection Measures as applicable
G
50 01 57 20 01 Preconstruction Submittals
Environmental Permits as applicable
G
51 01 57 20 01 Preconstruction Submittals
Equipment Inventory 3.7.2
52 01 57 20 02 Shop Drawings Asbestos Work Plans G
53 01 57 20 02 Shop Drawings Asbestos Certifications G
54 01 57 20 02 Shop Drawings Asbestos Transporter License
G
55 01 57 20 02 Shop Drawings Asbestos Medical clearances G
56 01 57 20 02 Shop Drawings Asbestos Training Certificates G
57 01 57 20 02 Shop Drawings Asbestos TDSHS License G
58 01 57 20 02 Shop Drawings Asbestos Inspection Reports G
59 01 57 20 02 Shop Drawings Unsigned copy of State Renovation G
60 01 57 20 02 Shop Drawings Demolition Notifications G
Page 3 of 5SpecsIntact Submittal Register Data
61 01 57 20 02 Shop Drawings Lead Work Plans G
62 01 57 20 02 Shop Drawings Lead Occupant Protection Plan. G
63 01 57 20 02 Shop Drawings
Texas Department of State Health Services Lead Licenses
G
64 01 57 20 02 Shop Drawings Lead Notifications G
65 01 57 20 02 Shop Drawings Lead Training Certificates G
66 01 57 20 02 Shop Drawings Lead Based Paint Reports G
67 01 57 20 02 Shop Drawings Lead Inspection reports G
68 01 57 20 03 Product Data Asbestos Air Monitoring reports G
69 01 57 20 03 Product Data Lead Air Monitoring reports G
70 01 57 20 04 Samples Lead OSHA Negative Exposure Assessment
G
71 01 57 20 04 Samples Lead Work Plan. G 72 01 57 20 04 Samples EPA Lead Training
73 01 57 20 04 Samples Lead Awareness Training certificates
G
74 01 57 20 04 Samples OSHA Air Monitoring G
75 01 57 20 04 Samples Lead Training Certificates G
76 01 57 20 04 Samples Waste Disposal Plan G
77 01 57 20 04 Samples Lead Inspection reports G
78 01 57 20 04 Samples Lead Based Paint Reports G
79 01 57 20 06 Test Reports Analytical Results 3.1.4.1 G
80 01 58 00 02 Shop Drawings Preliminary One Line G
81 01 73 19 06 Test Reports Equipment inspection 3.4.1 G
82 01 74 19 01 Preconstruction Submittals
Construction Waste Management Plan
1.7 G
83 01 74 19 06 Test Reports Quarterly Reports 1.9.2 84 01 74 19 06 Test Reports Annual Report 1.9.3
85 01 74 19 11 Closeout Submittals
Final Construction Waste Diversion Report
1.10 S
86 01 78 00 03 Product Data Warranty Management Plan 1.6.1
Page 4 of 5SpecsIntact Submittal Register Data
87 01 78 00 03 Product Data Warranty Tags 1.6.4 88 01 78 00 03 Product Data Spare Parts Data 1.5
89 01 78 00 08 Manufacturer’s Instructions Instructions 1.6.1
90 01 78 00 10 Operation and Maintenance Data
Operation and Maintenance Manuals
3.3 G
91 01 78 00 11 Closeout Submittals As-Built Drawings 3.1 G
92 01 78 00 11 Closeout Submittals Record Drawings 3.2 G
93 01 78 00 11 Closeout Submittals Record Model G
94 01 78 00 11 Closeout Submittals
As-Built Record of Equipment and Materials
1.6.1
95 01 78 00 11 Closeout Submittals
Final Approved Shop Drawings
96 01 78 00 11 Closeout Submittals
Construction Contract Specifications
97 01 78 00 11 Closeout Submittals
Certification of EPA Designated Items
G
98 01 78 00 11 Closeout Submittals
Certification Of USDA Designated Items
G
99 01 78 23 10 Operation and Maintenance Data O&M Database 1.4 G
100 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G
101 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G
102 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G
103 01 78 23 11 Closeout Submittals
Training Video Recording 3.1.4 G
104 01 78 23 11 Closeout Submittals
Validation of Training Completion
3.1.6 G
1/13/2021 9:17:17 AM
Page 5 of 5SpecsIntact Submittal Register Data
1/13/2021file:///G:/502_CES/CENMPF_PROJECTS/SpecsIntactWD1/Jobs/JBSF1098542/Exports/UFGS4288.htm
N/A
N/A
N/A N/A N/A N/A