P21-010075, REV. B 11/18/2013 DCO 768
IPG High Power Laser Pre-Installation Guide
Facility Requirements This document must be completed prior to installation of you IPG laser. Please refer to the corresponding electrical and coolant requirements for each device.
Before switching the power on, make sure that the incoming AC voltage is equal to the level noted in the electrical specification. In areas where over-voltage is a concern, an isolation transformer should be installed on the AC power source. In areas where voltage surges and lightning strikes are a concern, Type 2 surge protection devices (SPD) should be installed on the AC power source.
Electrical
IPG recommends sizing your line power fuse at or slightly above the Full Load Amperes (FLA) of the laser, beam switch and the chiller.
IMPORTANT: Please refer to the supplied electrical schematics to verify the power supply size of your particular system and locate the correct power requirements according to Table 1. If you have any concerns or issues please contact the IPG Customer Service department.
Facility electrical power requirements for all devices can be found in Table 1 and Table 2.
Table 1: Electrical Wiring Specifications (Laser)
1 7.5 13/11 20
1.5 7.5 13/11 20 2 7.5 13/11 20
2.5 2x7.5 25/21 30 3 2x7.5 25/21 30
3.5 2x7.5 25/21 30 4 2x7.5 25/21 30 4 3x7.5 37/31 50 5 3x7.5 37/31 50 6 3x7.5 37/31 50 7 4x7.5 48/41 60 8 4x7.5 48/41 60 9 4x7.5 48/41 60 9 5x7.5 60/50 80 10 5x7.5 60/50 80 11 5x7.5 60/50 80 12 5x7.5 60/50 80
1 All voltage tolerance’s are 3 phase ± 10% at 50 or 60 Hz
RELEASED: 11/18/2013 IPG High Power Laser Pre-Installation Guide
2 FACILITY REQUIREMENTS | IPG PHOTONICS
13 6x7.5 72/60 100/80 14 6x7.5 72/60 100/80 15 7x7.5 84/70 100 16 7x7.5 84/70 100 17 8x7.5 95/80 125/100 18 8x7.5 95/80 125/100 19 8x7.5 95/80 125/100 20 9x7.5 107/90 150/125 25 12x7.5 143/119 175/150 30 14x7.5 166/139 200/175 35 16x7.5 190/158 250/225 40 18x7.5 213/178 250/225 45 20x7.5 237/197 300/250 50 23x7.5 272/227 350/300 55 25x7.5 295/246 350/300 60 28x7.5 331/276 400/350
* The following Amperage must be added to the FLA and Suggested Max Breaker Size above, if an Air Conditioner is applicable.
2 Amps each for standard cabinets with Seifert air conditioner 1 Amp each for compact cabinets with Seifert compact air conditioner
2 Amps each for standard Pfannenberg air conditioner 1 Amp each for compact Pfannenberg air conditioner
Table 2: Electrical Wiring Specifications (Chiller and Beam Switch)
LC71 22/18 30
LC170 25/24 30
PC41 9/9.5 15
PC63 18 30
PC160 30 30
PC250 42 50
PC400 60 60
Coupler / Beam Switch 110-220VAC, Single Phase 30
Cooling Circuit
Hose Diameters
The recommended minimum hose inner diameter (ID) from the chiller to the laser is 3/4 inch for lasers up to 3kW. It is recommended a minimum hose ID of 1 inch for all other lasers.
The recommended minimum hose inner diameter (ID) from the chiller/laser to the optics is 3/4 inch.
2 All voltage tolerance’s are 3 phase ± 10% at 50 or 60 Hz
IPG High Power Laser Pre-Installation Guide RELEASED: 11/18/2013
IPG PHOTONICS | FACILITY REQUIREMENTS 3
You must use larger ID hose to minimize pressure drop if the length of the hose between the chiller, laser and optics is too long.
Water Parameters
All Chillers will require De-ionized (DI) water for the optical water loop. Distilled water can be also used to charge the DI loop. In addition, there may be an additional Primary water loop that will require tap water unless otherwise noted.
DI water must be used if you are using a chiller with only one reservoir (e.g. if you are using a LC71 chiller).
Reservoir capacities can be found in Table 3.
Table 3: Chiller Reservoir Capacities
LC71 NA 140
LC170 25 120
PC41 NA 25
PC63 NA 60
PC160 140 25
PC250 75 25
PC400 240 25
Water Specifications
The recommended water flow requirements to the laser power supply and optics, in liters per minute (lpm), will depend on the laser power, optical configuration and if an algaecide is used (power supply water only).
IPG recommends Nalco 7330 if an algaecide is to be used in the power supply water.
Nalco 7330 is a non-oxygen biocide approved for use in tap water circuits for IPG’s Lasers. DO NOT USE Nalco 7330 in DI-Water circuits for optic cooling.
Dosing Nalco 73199: 10 ml per 100 litters of water
The water specifications for the laser power supply are described below. Optic water specifications are listed in Table 4.
Filtration: < 500 micron Temperature: 21-25°C (water temperature stability is +/- 1.0 °C of the temperature set point) Pressure: 100 psi max.
Minimum Water Flow (Tap Water): 5 lpm per kW Minimum Water Flow (Tap Water and algaecide mixture): 10 lpm per kW
For lasers with internal optics (i.e. YLS-1000-CT) and single loop chillers (PC41, PC63 and LC71), coolant supplied to the laser must be DI water.
4 ON-SITE REQUIREMENTS | IPG PHOTONICS
Table 4: Optic Water Specification
WATER
TYPE
FILTRATION FLOW TEMPERATURE3 PRESSURE
Fiber Cable Connector /IPG Collimator Only
DI 10-50 micron 2-5 lpm 24-35°C 65 psi max.
Fiber to Fiber Coupler DI 10-50 micron 2-5 lpm 24-35°C 65 psi max.
1x2 Beam Switch DI 10-50 micron 5-10 lpm 24-35°C 65 psi max.
1x4 Beam Switch DI 10-50 micron 10 lpm min. 24-35°C 65 psi max.
1x6 Beam Switch DI 10-50 micron 15 lpm min. 24-35°C 65 psi max.
Other Requirements
Minimum laser clearance is 1 meter from all sides and top Minimum chiller clearance is 1.5 meter from all sides and top Ambient Conditions is 15 to 45 °C with a relative humidity of 90% maximum at 25°C
The ambient conditions must respect the dewpoint guidelines that are discussed later in this guide.
On-site Requirements The customer must supply the following items so that the IPG technician can verify laser performance:
IPG Laser Power Measurement Equipment Requirements
120 VAC outlet Source of filtered tap or distilled water- 4gpm (15lpm) minimum Supply and return ½” outer diameter (OD) hose/tubing to/from above water supply Workbench, length 4-5 ft.
Installation site- enclosed room, limited access, or safety portioned Cross-over Ethernet cable- for connection from laser to PC for LaserNet™
3 The stability of the optic water temperature is +/- 1.0 °C of the temperature set point.
IPG PHOTONICS | PLUMBING LAYOUTS 5
Computer Requirements
Table 5: Computer Requirements4
Pentium III 1 GHz Pentium IV 2GHz
256 MB RAM 512 MB RAM
Display resolution 1024x768 (XGA) 256 colors True Color 20 MB free space on HDD 100 MB fast Ethernet
CD ROM
Local Area Network (LAN) settings:
Choose TCP/IP Properties and set the following values.
IP address: 192.168.100.2 Subnet mask: 255.255.255.0 Default Gateway: 192.168.100.1
Plumbing Layouts
The optics coolant loops are intended for cooling the delivery fiber connector and IPG-supplied collimator only. Use of these loops to cool additional customer supplied optics is not permitted (collimator, welding head, etc.) unless approval from IPG is obtained. Failure to follow this instruction will void the IPG warranty.
The connector and IPG-supplied collimator must be plumbed in series as shown in the diagrams below. If the required flow cannot be achieved in this configuration, contact IPG for assistance.
4 Windows Vista™ and Windows 8 are not supported at this time.
6 PLUMBING LAYOUTS | IPG PHOTONICS
Figure 1: Single Loop Chiller – No Coupler/Beam Switch
IPG PHOTONICS | PLUMBING LAYOUTS 7
Figure 2: Single Loop Chiller- Coupler/Beam Switch Enclosure
8 PLUMBING LAYOUTS | IPG PHOTONICS
Figure 3: Single Loop Chiller- Internal Coupler/Beam Switch
IPG PHOTONICS | PLUMBING LAYOUTS 9
Figure 4: Dual Loop Chiller- No Coupler/Beam Switch
10 PLUMBING LAYOUTS | IPG PHOTONICS
Figure 5: Dual Loop Chiller- Coupler/Beam Switch Enclosure
IPG PHOTONICS | DEWPOINT GUIDELINES 11
Figure 6: Dual Loop Chiller- Internal Coupler/Beam Switch
Chiller
Optics Laser
Water Out
Water In
Laser
Collimator
Fiber Delivery Cable Connector
Fiber Delivery Cable
1 set of connections provided for lasers with internal coupler, 2 sets for internal 1X2 beam switch
1 6542 3
Dewpoint Guidelines
Failure to follow these instructions may result in serious personal injury or damage to the device.
For optimum operation of the IPG laser power sources, the Riedel process chillers or process cooling water supplied by the customer should be set to 20°C (68°F). This ensures that the diodes are generating at the proper wavelength of infrared light for efficient pumping of the active fibers. However, if operation under high humidity cannot be avoided, cooling water temperature could be increased above dew point up to 30°C.
IPG Photonics authorization is required if cooling water temperature needs to be adjusted above 30°C.
If the relative humidity is high enough in the laser room (or plant), then the moisture in the air can condense on cool parts within the laser, such as water lines, optics, flow tubes, etc. This can potentially
12 DEWPOINT GUIDELINES | IPG PHOTONICS
cause serious damage to internal components.
The psychometric chart is used to calculate the dew point (temperature at which moisture will precipitate or condense out of ambient air) given a dry bulb (regular thermometer) temperature and relative humidity reading.
There are typically two gauges in each laser room (or plant), a dry bulb thermometer and a humidistat (relative humidity). Please use the average of each when reading the psychometric chart below.
1. Obtain the average temperature in the room and locate the vertical dry-bulb temperature line at the bottom of this page.
2. Obtain the average humidity level in the room and locate the respective curve in the chart at the bottom of this page.
3. The intersection of these two lines provides information about the dew point of the ambient air.
Dry bulb temperature (°F) Relative humidity (%)
Example: Room temperature at 80°F and relative humidity of 50%, what is the dew point of the air in the room?
Answer: The vertical temperature line at 80°F intersects the relative humidity curve of 50% with the horizontal dew point line showing 60°F.
Charts courtesy of University of Nebraska, Lincoln. David P. Shelton, Gerald R. Bodman
IPG PHOTONICS | INSTALLATION RESPONSIBILITIES 13
4. If the dew point is below 68°F (20°C), then there is little risk of condensation within the laser.
Proceed with normal operation of your laser.
5. If the dew point is above 68°F (20°C), then there is considerable risk for condensation within the lasers. Take the following actions:
a. Turn laser off immediately using main power switch.
b. Take one or more of the following actions to remedy the situation.
i. Check the de-humidifiers in the rooms and drain as necessary.
ii. Check the A/C units for proper operation (are they actually cooling?) May need to replace or add extra A/C units. Note: A/C units can lose up to 10% of their cooling efficiency each year.
iii. Ensure the doors are sealed properly to keep the humid air out.
iv. Clean the heat exchange vents on the outside of the A/C units.
v. Increase coolant temperature above dew point.
IPG Photonics authorization is required if cooling water temperature needs to be adjusted above 30°C.
c. Open the laser cabinet and inspect coolant lines for condensation.
If condensation is present, notify IPG Photonics at (508) 373-1157 for further instructions. If condensation is not present, proceed with normal operation of your laser.
Installation Responsibilities Customer
Installation and leak checking of plumbing between laser, chiller, and optics.
Verification of Clean AC Line Voltage Charging of chiller with appropriate water.
Electrical services and connections to power the laser, chiller, and optional accessories (i.e.
coupler/beam switch cabinet).
Wiring and verification of safety, analog, and hardwiring interfaces.
Installation of IPG supplied LaserNet� software.
Functionality of customer supplied GUIs or control systems.
Verification of laser system performance in the customer’s process/application.
Laser safety training.
Any non-standard testing not agreed upon by the Customer and IPG prior to the visit.
IPG
Verification of plumbing connections (correct layout, not leak checking).
Verification of IPG provided external optic connections, including end face cleanliness.
Initial power-up of the IPG laser system (laser, chiller, and optional accessories).
Verification of red guide beam functionality.
Verification of laser output power (and any additional verification testing as agreed upon by the
Customer and IPG prior to delivery of the IPG laser system).
Provide training on basic IPG laser system operation and preventive maintenance.
14 INSTALLATION RESPONSIBILITIES | IPG PHOTONICS
FAX COVER SHEET
To: IPG Customer Service Department From:
Company: IPG Photonics Phone:
Fax: (508) 373-1242 Fax:
Re: Customer Facilities Sign-Off Company:
Email: support@ipgphotonic.com
The following activities must be completed prior to scheduling an IPG service technician to be on-site to perform the above services. Please place a check mark in the corresponding box below to indicate completion of each item, sign below, and fax or email this form to the number/email address above three weeks prior to your requested installation date.
All required electrical services and connections to power the laser, chiller (if applicable), and optional accessories (i.e. beam switch cabinet) are installed per IPG specifications
All required plumbing is installed between the laser, chiller, and optics per IPG specifications
Chiller reservoir(s) filled
Completed wiring of the safety interface connection to IPG specifications
Reviewed and understand Dew Point Guidelines
In the event that the installation site is not ready per the requirements stated above when the IPG service technician arrives on-site, the Customer will be responsible for any additional costs (travel expenses) associated with rescheduling the IPG service visit or for IPG to remain on-site longer than an 8 hour period (standard IPG field service rates will apply).
I, THE UNDERSIGNED CUSTOMER REPRESENTATIVE, CERTIFY ON BEHALF OF THE
CUSTOMER THAT I HAVE READ, UNDERSTAND AND FULFILLED THE ABOVE
REQUIREMENTS.
CUSTOMER REPRESENTATIVE PRINT NAME AND TITLE DATE