Attachment 6
Section M - Evaluation Factors for Award
1.0 SOURCE SELECTION
1.1. Basis for Contract Award
This is a Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), and DoD Source Selection Procedures. These regulations are available electronically at the Air Force (AF) FAR Site, https://www.acquisition.gov/. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by this solicitation. Unless specifically identified in your proposal, by submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in a proposal being determined ineligible for award.
1.2. Number of Contracts to be Awarded
The Government intends to award one contract for this competitive acquisition. Award will be made to the technically acceptable Offeror with lowest evaluated price who is deemed responsible in accordance with FAR 9.104 and whose proposal conforms to the solicitation requirements. The Government reserves the right to award all, some or none of the Contract Line Items Numbers (CLINs) in Section B.
1.3. Discussions
The Government intends to award without discussions; therefore, offerors should submit proposals that represent their best efforts. If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision.
If discussions are to be conducted, the Government will establish a competitive range based on the ratings of each proposal against all evaluation criteria in the solicitation. The competitive range will consist of the most highly rated offerors based on evaluation of all offers against all factors. The Government reserves the right to further limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Prior to the establishment of the competitive range, and after the decision to conduct discussions has been made, the Government may enter into limited communications with offerors whose inclusion or exclusion from the competitive range is uncertain. These communications are limited in accordance with FAR 15.306(b)(1)(ii).
The Government will only enter discussions with those offerors determined to be in the competitive range. At the conclusion of discussions, each offeror still within the competitive range shall be given an opportunity to submit a Final Proposal Revision (FPR) by a common cutoff date and time as established by the Contracting Officer. If, after discussions have begun the Government determines that an offeror’s proposal should no longer be included in the competitive range, the proposal will be eliminated from consideration for award. This may occur at any time even if all material issues have not been discussed or if the offeror has not yet been afforded the opportunity to submit a proposal revision. Written notice of exclusion from the competitive range will be provided to unsuccessful offerors.
https://www.acquisition.gov/
1.4. Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable.
1.5. Evaluation Process
Proposals will be evaluated initially for technical acceptability based on the proposed project schedule, Work Breakdown Structure (WBS), Sanitized Cost Estimate Breakdown and Renovation Barrier Considerations. After determination of technical acceptability, all technically acceptable proposals will be ranked from lowest to highest based on an assessment of Total Evaluated Price (TEP). TEP is total aggregate price for all CLINs. The government intends to award a contract to the contractor that provides a proposal that is determined technically acceptable based on an understanding of required elements of work and is the lowest price. A price analysis will be conducted on the lowest priced technically acceptable proposal to determine price reasonableness. Award will be made to the lowest TEP proposal meeting the technical acceptability standards (contingent upon contractor's responsibility determination).
If award is to be made without discussion the evaluation factors and process to be used is listed below.
2.0 EVALUATION FACTORS
2.1 Evaluation Factors.
In evaluating proposals, the Government will select the proposal that is the lowest-priced, technically acceptable offer to the Government. The Government will evaluate proposals for technical acceptability, but will not rank the proposals by the non-price factors. To arrive at an award decision, each offer will be assessed in accordance with the following evaluation factors for the contract:
Factor 1: Technical Factor 2: Price
Offerors are advised that their initial submission should be their best effort. Only technically acceptable proposals, either initially or as a result of discussions, are eligible for award. If award is made without discussions; proposal revisions will not be permitted. The Government will evaluate the proposals for technical acceptability on an Acceptable/Unacceptable basis. For the technical proposal to be rated as "Acceptable", the contractor must demonstrate an understanding of the requirement by submitting:
1) a proposed project schedule,
2) a WBS that demonstrates and describes the activities, tasks, quantities, and elements to successfully complete all SOW requirements,
3) a Sanitized Cost Estimate Breakdown that identifies the Line Items and quantities to include Line Item Number, Item Description, Unit of Measure, Quantity and Technical Data in a Microsoft Excel v2013 compatible spreadsheet in an RS Means or similar format to level 5, and
4) a detailed Renovation Barrier Consideration describing approach, protocols, techniques and quality assurance methods used to control ingress/egress of the construction areas and for contamination migration and air quality control as related to the construction activities.
Volume I: Executed Contract Documentation Executed Standard Form 1442 and Bid Guarantee
Volume II: Technical Subfactor 1 – Proposed Project Schedule Subfactor 2 – Work Breakdown Structure Subfactor 3 – Sanitized Cost Estimate Breakdown Subfactor 4 – Renovation Barrier Considerations
Value III: Pricing Basis of Estimate
2.2 Volume I – Executed Contract Documentation
Executed Contract Documentation
The Government will review Volume I for completeness. The Contracting Officer may conduct clarifications to address the completeness of Volume I deliverables. It is the offeror’s responsibility to verify the executed contract documentation and supporting documentation meet the requirements of Sections L & M of this solicitation.
Description: Submit the Standard Form 1442 and all pages originally included in the RFP. Submit one
(1) copy. Complete blocks 14, 15, 16, 17, 19, and 20a-c of the SF 1442, Solicitation, Offer, and Award.
An authorized official of the firm submitting the offer must sign and date the SF 1442 in block 20a-c. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP, Sections A through M. Complete the representations and certifications in Section K or the System for Award Management (SAM). Offeror must also provide an electronic copy of the Bid Guarantee.
2.3 Volume II– Technical
The Government's technical evaluation team shall evaluate the technical proposals on an acceptable or unacceptable basis, assigning one of the ratings described below. For the technical proposal to be rated as "Acceptable", the contractor must demonstrate an understanding of the requirement by submitting a proposed project schedule and WBS that identifies the elements of work, labor mixes, materials, equipment and labor hours to complete project. If any portion of the technical factor is "Unacceptable" the overall proposal will be rated as "Unacceptable".
TECHNICAL RATINGS
Rating Description
Acceptable The proposal meets specified minimum requirements necessary for acceptable contract performance.
Unacceptable The proposal fails to meet specified minimum requirements necessary for contract performance.
2.3.1 Subfactor 1 – Proposed Project Schedule
Description: Provide a proposed schedule that captures the major elements of work described in the statement of work, deliverables, and specifications to meet any other scheduled timelines for deliverables and complete the project at minimum within the allotted period of performance (or sooner).
The standard has been met when: The offeror demonstrates a sound, comprehensive, realistic, effective, and efficient project schedule that captures all SOW requirements and execution timelines. The offeror must provide a schedule that illustrates and displays project completion of all major elements of work and timelines for each element of work using a graphical or tabular representation (e.g. MS Project, AF Form 3064, or Gantt chart). The project schedule shall be redacted to remove all company names, logos, and personnel names.
2.3.2 Subfactor 2 – Work Breakdown Structure (WBS)
Description: Provide a WBS that demonstrates and describes the proposed solution activities, tasks, elements and quantities required to complete all requirements IAW the SOW. The WBS shall provide the major elements of work, labor, materials, equipment and quantities for each activity.
The standard has been met when: The offeror provides a WBS that demonstrates an understanding of the requirement by proposing the appropriate materials, labor mix, equipment, other direct costs, and manpower to complete all tasks in SOW.
2.3.3 Subfactor 3 – Sanitized Cost Estimate Breakdown
Description: A sanitized copy of the Cost Estimate Breakdown showing no prices shall be provided and is not part of the page limitation for this Volume II. Line item and quantities to include line Item Number, Item Description, Unit of Measure, Quantity and any other Technical Data in a Microsoft Excel, v2013, compatible spreadsheet in an RS Means–type or similar format to level 5.
The standard has been met when: The offeror provides a sanitized Cost Estimate Breakdown showing no prices that demonstrates an understanding of the requirement by proposing the Line Item Numbers, Item Descriptions, Units of Measure, Quantities and any other Technical Data required to complete all tasks in SOW. The Cost Estimate Breakdown shall be in a Microsoft Excel v2013 compatible spreadsheet. The Cost Estimate Breakdown shall be in an RS Means or similar format to level 5.
2.3.4 Subfactor 4 – Renovation Barrier Considerations
Description: The offeror will provide a detailed procedure describing approach, protocols, techniques and quality assurance methods used to control ingress/egress of the construction areas and for contamination migration and air quality control as related to the construction activities.
The standard has been met when: The offeror provides a detailed procedure demonstrating an understanding of the approach, protocols, techniques and quality assurance methods used to control ingress/egress of the construction areas and for contamination migration and air quality control as related to construction activities.
2.4 Volume III– Price
The Government will review Volume III for a complete basis of estimate for the Photonic Laser Install project that identifies the elements of work, labor mixes, materials, equipment and labor hours to complete the project. The estimate should show detailed listing of RS Means or similar line item numbers, description of items, units of measure, quantity of units required, and unit costs. Additionally, the basis of estimate shall provide actual rates (i.e. profit, overhead, labor burden, bonding, City Cost Index) and the proper application of these rates to derive at the proposal grand total. This basis of estimate will be used to evaluate the Total Evaluated Price (TEP).
Price Evaluation: The total evaluated price shall be the total price proposed by the offeror in Section B of the SF 1442 as supplemented by the Cost Estimate Breakdown. All technically acceptable proposals will be ranked from lowest to highest based on evaluated price. The source selection will be conducted with the expectation of adequate price competition for this acquisition per FAR 15.403-1(c)(1); therefore, certified cost or pricing data are not required per FAR 15.403-1(b)(1). If at any time, however, during this competition the CO determines that adequate price competition no longer exists or if price reasonableness cannot be determined; offerors may be required to submit certified cost or pricing data or additional data other than certified cost or pricing data, as appropriate, for the CO to determine price reasonableness.
The Government will conduct a Price Analysis on the lowest priced technically acceptable offer using one or more of the techniques defined in FAR 15.404-1, to determine if it is reasonable and balanced.
Unbalanced pricing exists when, despite an acceptable TEP, the price of one or more contract line items or sub line items appears to be significantly overstated or understated as indicated by the application of price analysis techniques. An offeror's proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.