This document contains a schedule of material submittals for a project to resurface the exterior of Building B2792 at Joint Base San Antonio. The schedule lists 18 line items of materials and documents requiring submittal to the project engineer for approval, including concrete mix designs, masonry brick, expansion joint material, downspout material, and paint. It specifies the required number of copies, type of submittal such as shop drawings, samples, or manufacturer's data, and required submission dates for each item. The related federal contract opportunity notice is for a draft Joint Base San Antonio Non-Complex Construction IDIQ solicitation seeking industry comments due no later than 21 February 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ), newest first.
File Type Posted
DRAFT RFP QUESTIONS AND ANSWERS.pdf PDF
DRAFT RFP - FA301620R0015.pdf PDF
Attachment 12 - Section M Evaluation Factors for Award.pdf PDF
Attachment 11 - Section L Instructions to Offerors.pdf PDF
Attachment 5 - National Total Bare Cost Example.pdf PDF
Attachment 21 - Subcontractor Consent Letter.docx DOCX document
Attachment 15 - NC2 IDIQ Project Drawing, B2792.pdf PDF
Attachment 10 - Warranty Call Worksheet.pdf PDF
Attachment 18 - Past Performance Questionnaire.pdf PDF
Attachment 20 -Seed Project Wage Determination TX20200231.pdf PDF
Attachment 12 - Section M, Evaluation Factors for Award.pdf PDF
Attachment 4 - Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 16 - NC2 IDIQ Seed Project HAZMAT Report.pdf PDF
Attachment 19 - Climatology Report.pdf PDF
Attachment 9 - Base Access Request Form.pdf PDF
Attachment 7 - Material Approval Letter (AF3000).pdf PDF
Attachment 2 Contract Progress Schedule.pdf PDF
Attachment 17 - Past Performance Information Sheet (PPI).docx DOCX document
Attachment 6 - Contract Progress Report (AF 3065).pdf PDF
DRAFT RFP - FA301620R0015.pdf PDF
Attachment 8 - Progress Payment Request.xlsx XLSX spreadsheet
Attachment 11 - Section L, Instructions to Offerors.pdf PDF
Attachment 3 - Contract Insurance Compliance Notification.pdf PDF
Attachment 1 - NC2 IDIQ Base Contract Specifications.pdf PDF
Attachment 13 - NC2 IDIQ Seed Project Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER: PROJECT TITLE: SOLICITATION/CONTRACT NUMBER:

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

AT

IO

N

O F

C

M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

D O

C U

M

EN

T

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

EN

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

APPROVED

DIS-

APPROVED

1 Division 1 General Requirements

2 Contract Progress Schedule AF Form 3064 4

3 Pre-Construction - Laydown Yard Submittal 4

4 TCEQ Permits 4

5 Construction Submittals 4

6 Safety Plan 4

Traffic Control, Route & Safety Plan 4 4

7 SWPPP 4

8 DD 1354 4

9 Warranty Management Plan 4 4

10 Operation & Maintenance Data 4 4

Aerial Lift Equipment 4 4

Scaffolding Plan 4

Scaffolding Equipment 4 4

13 Division 02 Existing Conditions

14 LBC Waste Manifests 4 4

JBSF150049L RPR Resurface of Exterior Building, B2792

Schedule of Material Submittals 01305-4

Attachment 14 22 January 2020

PROJECT NUMBER: PROJECT TITLE: SOLICITATION/CONTRACT NUMBER:

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

AT

IO

N

F

C

M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

D O

C U

M

EN

T

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

EN

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

APPROVED

DIS-

APPROVED

JBSF150049L RPR Resurface of Exterior Building, B2792

15 Lead Paint - Remediation Plan 4 4

16 Division 3 Concrete

Concrete Mix Design 4 4

17 Division 4 Masonry 4

Masonry Brick Submittal 4 4

Division 7 Thermo & Moisture Protection

Expansion Joint Material 4

Downspout - Copper Material 4 4 4 4 4

18 Division 9 Finishes

Paint - Submittal 4 4 4 4

Schedule of Material Submittals 01305-5