FA301620Q0054 SOW Amendment 01.docx

DOCX document 27 KB Posted

Attached to
Aircraft Sun Shade Inspection Federal contract opportunity
Solicitation number
FA301620Q0054
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Sun Shade Inspection, newest first.
File Type Posted
Q and A Amendment 02.pdf PDF
FA301620Q0054 SOW Checklist Amendment 01.pdf PDF
Q and A Amendment 01.pdf PDF
FA301620Q0054 SOW Sun Shade Attachment 3.pdf PDF
FA301620Q0054 Combo Attachment 1.doc DOC document
FA301620Q0054 Clauses and Provision Attachment 2.pdf PDF
FA301620Q0054 RFQ Cover Page Attachment 4.pdf PDF
FA301620Q0054 WD 2015-5253 Rev 10 Attachment 5.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 01 FA301620Q0054

Attachment 3

STATEMENT OF WORK

FOR

AIRCRAFT SUN SHADE INSPECTION/MINOR REPAIR

1.0 SCOPE OF WORK:

1.1 Background. Preventative Maintenance is the basis of the Air Education and Training Command’s policy for aircraft sun shade sustainment. The Government’s objective is to maintain safe and reliable aircraft sun shades.

1.2 Scope. Non-personal services to provide all supervision, labor, tools, supplies, equipment and materials necessary to conduct a one-time inspection/minor repair of existing aircraft sun shades (alternatively called aircraft “shelters”) located on the Joint Base San Antonio Randolph (JBSA-RAN), TX flight line. The inspection shall be performed using the attached 12th Flying Training Wing/Maintenance (12 FTW/MX) local checklist. Tasks include visually examining the condition of the structure, fabric (as applicable), lights, electrical, bird nesting mitigation, lightning protection, obstruction lighting, safety reflective devices and fall protection, and physically tightening, connecting, and verifying proper operation and serviceability of all hardware and other components of the sun shades. The results of the inspection/minor repairs shall be documented in a non-proprietary report and submitted to the Government.

The sun shades are constructed of purlins, struts, cable braces, rafter beams, columns, knee braces, and angle braces and current inventory consists of the following:

Shelter Name/Purpose
Number of Shelters
Bays
Aircraft Protected
Location
T-38 Sound Suppressor
1
1
2
North of the Flightline, behind the Hush House
Old Wash Rack
1
1
0
East Ramp, Between Hangars 3 and 4
T-38 Flightline
11
33 (3 per)
66
East Ramp Flightline, Rows 1-11
T-1 Flightline
5
20 (4 per)
20
East Ramp Flightline, Rows 16-20
AGE Wash Rack
1
1
0
East Ramp, South of Hangar 16
T-6 Flightline
4
20 (5 per)
40
West Ramp Flightline, Rows 51-54
TOTALS
23
76
128

Size for T-38 is 83 ft. wide x 68 ft. long x 15 ft. tall Size for T-6 is 100 ft. wide x 55 ft. long x 15 ft. tall Size for T-1 is Unknown

2.0 PROGRAM MANAGEMENT.

2.1 Contractor Responsibilities. Utilize the attached 12 FTW/MX checklist to perform the following tasks IAW applicable federal, state and local building code and regulations, or equivalent military standard Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS), and industry standards, or best practices.

2.2 Applicable to all sun shades: visually inspect and document repairs related to conditions of:

a) Inherent structural weakness

b) Corrosion

c) Improper installation

d) Design defects

e) Electrical defects

f) Weather (turbulence) related damage

g) Improper use

h) Destruction

i) Failure (signs or evidence of electrical, structural, or mechanical failure)

j) Severed item

k) Evidence of stress/buckling/fatigue/etc.

l) Fabric tears/rips/rot/etc.

m) Missing hardware

n) Loose hardware

o) Wildlife intrusion

p) Other discrepancies

2.2.1 Inspect all joist and girder connections. Ensure proper connections have been made. Any connection determined to be missing bolts, bolt holes, and/or appears hazardous to the safety of personnel or aircraft will be removed immediately.

2.2.2 Inspect and re-tighten all bolts on all sunshades. Identify by Row and Shelter Spot Number, sun shades with missing bolts.

2.2.3 Inspect all cables and cable connections on all sunshades. Any cable or connection determined to be hazardous to the safety of personnel or aircraft will be removed from the sunshade and clearly noted on that sunshade’s report.

2.2.4 Inspect and identify all sun shade fabric covers for tears or deterioration and identify by Row and Shelter Spot Number.

2.2.5 Inspect and test all lightning and grounding connections.

2.2.6 The Contractor will be responsible for the legal disposal of any materials (bolts, cables, etc.) that are removed from the sun shades.

2.3 Equipment. Any heavy equipment (crane or lift) required to perform the above tasks must be provided by the Contractor and cleared through airfield management prior to its use.

2.4 Documentation/Report. The report format is at the Contractor’s discretion but at a minimum shall identify specific discrepancies/defects by sun shade type (T-1, T-6, T-38) and flight line location (row and spot #) - sample format attached. The non-proprietary report shall become an integral part of the contract and must be submitted electronically to the Government not later than five (5) days following work completion and acceptance.

3.0 SAFETY

3.1 Contractor Liability. The Contractor shall be liable and responsible for non-compliance of environmental safety and health (ES&H) provisions, and pay any fines or fees resulting from improper actions and/or processes.

3.2 Spill Notification. Notify the Contracting Officer (CO) and the Contracting Officer’s (technical) Representative (COR) immediately of any pollution incident, as per base requirements. The Contractor shall also report spills to the base Environmental Office at 210-652-4668.

3.3 Safety and Health Notification and Reporting. Immediately notify the CO and COR of any mishap involving Contractor personnel, AF assets, or AF operations, which resulted in an injury, illness, or damage. Healthcare provided at the local military treatment facility is on an emergency reimbursable basis only. Injuries to Contractor personnel shall be reported IAW OSHA requirements. The numbers for Security Forces (base police) and Fire Department are 210-652-1646 and (210) 652-6915 respectively

3.4 Site Conditions. Work will take place on an active flight line apron. In order to minimize outage and down time all work will need to be coordinated with JBSA Randolph Airfield Management and COR. The Contractor shall furnish and maintain adequate barricades, and warning signs, on the job site. When parking in the vicinity of the shelters, vehicles will remain in the service zone when servicing shelters. Vehicles in/around/under shelters must comply with appropriate speed limits and wing tip clearance requirements (5 MPH within 25 feet of aircraft, 10 feet circle of safety). The contractor shall clean up debris on a daily basis to prevent foreign object damage to an aircraft or system.

4.0. SECURITY

4.1 Obtaining and Retrieving Identification Media. The Contractor shall obtain base identification and vehicle passes for all Contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or Contractor-furnished identification badges while visiting or performing work on the installation.

No later than three (3) working days prior to contract commencement, the Contractor shall submit a written request on company letterhead to the program manager listing the following: contract number, location of work site, start and stop dates, and names of Contractor employees needing access to the base. The authorized program manager will endorse the request and forward it to the issuing base pass and registration office or security forces for processing. Contractors will present Government (state or federal) issued ID, and INS Form 9 (I9), before being issued a pass to enter the installation. Before being issued a pass to enter the installation, a Wants and Warrants check will be conducted for every individual requesting a pass. Personnel employed by the Contractor must get a pass for their privately owned vehicles at Bldg. #1032, Visitor Reception Center, with proof of following:

(1) Liability Insurance
(2) Current License Plates
(3) Current State Inspection Sticker (If Required)
(4) Valid State Driver License
(5) A phone number for sponsor on base

Vehicles owned by the Contractor with the company names permanently printed on them are not required to obtain a pass as long as a current work order is presented at the time of entry. However, current liability insurance, state inspection sticker, and registration is required. The person driving the vehicle must have a valid operator license for the type of vehicle. The Contractor is responsible for ensuring employees report to Bldg. # 1032, Visitor Reception Center, to present their Form I-9 (Employment Eligibility Verification). Upon completion or termination of the contract or expiration of the identification passes, the Contractor shall ensure that all base identification credentials issued to Contractor employees are returned to the issuing office. If a Contractor employee has been terminated, the credentials will need to be retrieved and returned to issuing activity so that employee does not have base access. If the credential is not retrieved then SF will need to be notified so base access is not allowed. Failure to comply with these requirements may result in withholding of final payment.

4.2 Traffic Laws. Each contract employee driving a privately owned vehicle on the base must carry the minimum liability insurance as required by the State of Texas. Contractor employees shall adhere to all posted speed limits and shall not use hand-held cellular telephones for phone calls or texting while driving on the installation. Use of seatbelts is mandatory. Any Contractor employee cited for driving under the influence will have their driving privileges immediately revoked.

4.3 Weapons, Firearms, and Ammunition. Contractor employees shall not possess weapons, firearms, or ammunition on themselves, or within any vehicle, while on a United States Air Force Base/Installation.

4.4 Reporting. Report to the CO or the COR any information or circumstances that may pose a threat to the security of Department of Defense (DoD) personnel, Contractor personnel, or Government resources (format to be determined by the CO or the COR) within 24 hours of the incident.

4.5 Restricted Area. Flight line access is limited. The contractor will be escorted to the sites and badged appropriately while performing services on the flight line.

4.6 Photography. Contractor shall ensure no photographic equipment, to include cell phones, are permitted on the flight line by their personnel. If needed in the performance of duties, the Contractor shall contact the Airfield Manager prior to taking photographs.

5.0 HOURS OF OPERATION.

5.1 Duty Hours. Base hours of operation are 7:30 – 4:30 Monday through Friday. Flight line hours are 24 hours per day Monday – Friday. The Contractor may find it necessary to deviate from the normal base hours of operation to ensure timely completion of work under this SOW. If the Contractor determines it is necessary to work non-standard hours, a written request for approval to work outside normal hours must be submitted to the CO and COR. Upon approval, the work outside normal hours will be completed at no additional cost to the Government. Work scheduled but not accomplished because of base closure due to weather, exercise, or actual alert, will be accomplished as soon as possible after reopening the base.

5.2 Holidays. If the holiday falls on a Saturday or Sunday, it may be observed on Friday or Monday as directed. U.S. holidays include:

New Year's Day1 January
Martin Luther King Day3rd Monday in January
Presidents Day3rd Monday in February
Memorial DayLast Monday in May
Independence Day4 July
Labor Day1st Monday in September
Columbus Day2nd Monday in October
Veterans Day11 November
Thanksgiving4th Thursday in November
Christmas25 December