Questions_1-5.pdf
PDF 54 KB Posted
- Attached to
- Dormitory Furniture Federal contract opportunity
- Solicitation number
- FA3016-18-Q-0011
About this file
Questions round one.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_11,_12,_16.pdf | ||
| RH&T_Floor_Plans.pdf | ||
| Locker_Wep_Door.pdf | ||
| Questions_6-15.pdf | ||
| FA3016-18-Q-0011-P00001_Amendment_to_52-212-1.pdf | ||
| Questions_with_Answers.pdf | ||
| afi91-203.pdf | ||
| SOW_Dorm_Furniture_PDF.pdf | ||
| Technical_Specifications.pdf | ||
| Pass_Request.docx | DOCX document | |
| FA3016-18-Q-0011_PDF.pdf | ||
| Questions_and_Answers_Template.doc | DOC document | |
| LacklandMap.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE F2MTBG8072AW03
JBSA Lackland, TX Dorm Furniture
Question 1: Will you authorize this bunk bed? The dimensions are: 36"w X 76" L X 31.5" when stacked the overall height will not exceed 66". The bolted legs can be removed.
Government response: The bed frame is acceptable, but the dimensions must be 36.75W x 78.75L x 31.5H. The current dimensions listed are exact for the mattress size, and must be precise in order for the bed to be made accurately per training instructions.
Question 2: Is there a brand name for which the specifications are based on?
Government response: This is brand name or equal. The specifications are based on Air Force instructions and limited space in open-bay dormitory.
Question 3: Is there a deadline for submitting the site visit forms for the 30th?
Government response: The site visit is scheduled for the 30th of May 18 and pass requests must be submitted beforehand for processing.
Question 4: Would this be for another dorm all together or was the previous solicitation cancelled and this is a new one? Has an award been made on the solicitation that was due May 14?
Government response: Each dorm will have its own solicitation.
Question 5: I just wanted to follow up and see when you expect to award this project.
Government response: Upon completion of the solicitation period (18 June), all offers will be reviewed and evaluated. Award is expected to be made before the end of June.