PWS_Atch__1_-_Performance_Requirements_Summary.docx

DOCX document 15 KB Posted

Attached to
JBSA Lackland Alteration and Fitting Services FA3016-16-R-0072
Solicitation number
FA3016-16-R-0072
Issued by

About this file

PWS Attachment 1 - Performance Requirements Summary

View the file

Other files

File Type Posted
FA3016-16-R-0072-0002.pdf PDF
FA3016-16-R-0072-0002_ATCH_1_Questions_and_Answers__20_Oct.pdf PDF
RFP_Atch_4_Financial_Information_Questionnaire_Added_29_September_2016.docx DOCX document
RFP_Atch_1_Contract_Price_List_Revised_29_September_2016.xlsx XLSX spreadsheet
RFP_Atch_5_Contractor_Responsibility_Questionnaire_Added_29_September_2016.docx DOCX document
FA3016-16-R-0072-0001.pdf PDF
QASP_Attch_4_-_Checklist_Exception_Alteration_and_Reports.pdf PDF
RFP_Atch_1_Contract_Price_List.xlsx XLSX spreadsheet
PWS_Appendix_2_-_SERVICE_UNIFORMS.docx DOCX document
RFP_FA3016-16-R-0072.docx DOCX document
PWS_Atch_2_-BASIC_MILITARY_TRAINING_(BMT)_GUIDE_FOR_ALTERATIONS_10_AUG_2016.doc DOC document
QASP_Attch_5_-_Checklist_Cleanliness_and_Safety.pdf PDF
PWS_Appendix_5_Government_Furnished_Equipment.xlsx XLSX spreadsheet
RFP_Atch_3_Alt_Fit_PWS_22_SEP_2016.doc DOC document
PWS_Appendix_4_-_ALT_FIT_Flight_Roster_and_Daily_Totals_for_each_Flight_Redacted.pdf PDF
QASP_Attch_2_-_Checklist_Timeliness.pdf PDF
PWS_Atch_3_-_Government_Furnished_Property.pdf PDF
QASP_Attch_6_Monthly_Rating.xlsx XLSX spreadsheet
PWS_Appendix_1_-_Historical_Data_JUL_2015_to_JUN_2016.xlsx XLSX spreadsheet
PWS_Appendix_6_-_QASP_ALT-FIT_Contract__17_Sep_2016_Final.pdf PDF
QASP_Attch_3_-_Checklist_Realterations.pdf PDF
RFP_Atch_2_WD_15-2521_(Rev.-3).docx DOCX document
QASP_Attch_1_-_Checklist_Fitting_and_Alterations.pdf PDF
PWS_Appendix_3_-_Weekly_Schedule_First_and_Second_Issue_Example.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

PERFORMANCE REQUIREMENTS SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PO #
Performance Objective
PWS Reference Paragraph
Method of Surveillance
Performance Threshold
1
Fitting and alterations-The contractor shall provide alterations, fitting/tailoring and repairing in a timely manner with quality in accordance with AFI 36-2903, and Basic Military Training Guide for Fitting and Alterations standards and where standards are not available, in accordance with best industry practices.
5.4.6. and 5.8.
100% COR inspection of all altered garments

Workmanship – 85% of all garments altered monthly

2
Timeliness-Meet time requirements of flight processing in the PWS
5.5.1.
100% COR documentation of flight processing times
No more than 10% of the flights per month can exceed the time limit
3
Realterations - The contractor shall provide realterations in a timely manner with quality in accordance with AFI 36-2903, and Basic Military Training Guide for Fitting, for all garments not meeting standard established in Para 5.2. of PWS
5.2.
100% COR inspection of all altered garments

Workmanship – 100% of all garments realtered Monthly.

4
Exception Alterations and Reports -Provide exception alterations ensuring PWS timeframes are not exceeded. Reports-Required reports are submitted within the timeframe specified by the Government for each report.
5.11.1., 5.11.2., 5.12., 5.13. and 5.11.6.
100% inspection
90% accurate and on time
5
Cleanliness & Safety-The Contractor shall maintain the Government furnished facility (Room 1141, Building 5725, approximately 7,470 SF) in a clean and safe manner
1.12.1., 1.4.6. and 1.4.10.2.
100% COR daily checklist and visual inspection
No more than three (3) discrepancies per month

File details come from the government source that posted it. Updated .