This document contains pre-bid site visit questions and answers for Solicitation FA301025R0009, a Department of the Air Force construction project at Keesler AFB in Biloxi, Mississippi. The project involves repairing Chiller 2, replacing a Variable Frequency Drive (VFD) and Cooling Tower 2 in Building 4231, with an estimated project value between $250,000 and $500,000. The procurement is a HUBZone Small Business set-aside, with a period of performance from 05 June 2025 to 02 December 2025. Key site visit Q&A clarified that no additional temporary chillers are required, no drawings will be provided, and the bid due date will not be extended. An organized site visit is scheduled for 10 April 2025 at 1 PM CST, with specific base access requirements including valid identification and vehicle documentation. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation at any time without reimbursing offeror costs.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301025R0009 Repair Chiller 2 Pre-Bid Site Visit Questions

· Question 1: Solicitation Page 7 of 55 says: 180 CDs; and POP = 05 Jun 2025 To 02 Dec 2025. This is during the Summer Cooling Season. Will Temporary Chiller and Cooling Tower be required while the old are being rebuilt and replaced?

Question 1 Answer: No, the building currently has one operational cooling tower and is utilizing two temporary chillers.

· Question 2: Solicitation Page 31 of 55 says: 252.236-7001 Contract Drawings and Specifications: Will the government be providing the drawings?

Question 2 Answer: No, there are no drawings associated.

· Question 3: Will the Bid Due Date be extended as part of the RFI responses Amendment?

Question 3 Answer: No, the due date will not be extended.