Attachment 5 - Wage Det MS20250550-1.3.25.pdf
PDF 2 MB Posted
- Attached to
- MAHG 25-1003 Repair Chiller 2
- Solicitation number
- FA301025R0009
About this file
This document is a General Decision wage determination for a construction project in Harrison County, Mississippi, effective 01/03/2025. It specifies prevailing wage rates for various construction trades and labor classifications, including electricians ($30.75), power equipment operators ($35.50), ironworkers ($28.50-$31.00), pipefitters ($30.41), plumbers ($29.91), and sheet metal workers ($30.45). The wage rates are subject to the Davis-Bacon Act and Executive Orders 14026 and 13658, which establish minimum wage requirements for federal contractors. The document outlines different wage rates based on contract entry dates and provides detailed instructions for wage determination appeals, including contact information for the U.S. Department of Labor's Wage and Hour Division.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
FA301025R0009
ELEC0903-012 12/01/2023
Rates
ELECTRICIAN (Includes Low Voltage Wiring) .................. $ 30. 75
ENGI0624-008 01/01/2024
Rates
POWER EQUIPMENT OPERATOR
Forklift .................... $ 35. 50
IRON0798-009 07/01/2024
Rates
IRONWORKER, REINFORCING .......... $ 28.50
29.00 ....................... $ 31.00
PLUM0568-007 11/01/2024
Rates
PIPEFITTER (Includes HVAC Unit Installation (Excludes HVAC Pipe Installation)) ......... $ 30.41 PLUMBER (Includes HVAC Pipe Installation (Excludes HVAC Unit Installation)) .............. $ 29.91
SHEE0441-006 07/01/2022
Rates
SHEET METAL WORKER (Includes HVAC Duct Installation) .......... $ 30.45
SUMS2015-011 04/03/2017
Rates
BRICKLAYER ....................... $ 22.00
CARPENTER, Includes Drywall Hanging, Finishing/Taping and Form Work ........................ $ 15.90
CEMENT MASON/CONCRETE FINISHER ... $ 18.37
IRONWORKER, STRUCTURAL ........... $ 18.51
LABORER: Common or General ...... $ 10.91
LABORER: Mason Tender -
Cement/Concrete .................. $ 12.50 **
OPERATOR:
Backhoe/Excavator/Trackhoe ....... $ 17.93
OPERATOR: Bulldozer ............. $ 15.14 **
OPERATOR: Crane ................. $ 21.40
Fringes
7.27+12.5%
Fringes
14.55
Fringes
17.02 17.17
Fringes
11.47
11.97
Fringes
13.88
Fringes
0.02
0.00
0.00
0.00
0.00
0.00
1.62
1.03
3.58
File details come from the government source that posted it. Updated .