This document contains questions and answers related to solicitation number FA301023R0040 to renovate building B412 for the Defense Counterintelligence and Security Agency (DCSA) Phase 2 project. The questions and answers provide clarification on work requirements such as only using water for exterior cleaning, upgrading certain walls to STC50 standards, and confirming that laydown areas will not interfere with surrounding facilities. Additionally, current security and fire protection contractors will be identified at the pre-construction meeting, and all phase 2 fittings must comply with the Buy American Act.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301023R0040 Renovate B412 for DCSA Phase 2
Questions and Answers
1. Clarify the use or no use of chemicals to power wash exterior walls. Sheet A504 note 2 states to use water only on exterior cleaning. Sheet MD-102 Key Note E states to use sodium hypochlorite based cleaner.
Question 1 Answer: Water only. Do not use any chemicals.
2. Wall types labelled 2B (STC50), do we do anything to those walls. Sheet A-103 shows two walls along corridor 103 being type 2B but neither sheet A-103 nor AD-101 shows us doing any work on those walls. Do we demo or rework them to be type 2B?
Question 2 Answer: See drawing A-103, keyed note C which refers to drawing A-501 with details. Yes, rework to type 2B.
3. Who is current security contractor?
Question 3 Answer: This information will be identified at the pre-construction meeting.
4. Who is current Fire Protection and Fire Alarm rep/company?
Question 4 Answer: This information will be identified at the pre-construction meeting.
5. How far away is lay down yard (might by parking lot on north side of bldg.)?
Question 5 Answer: The north-end of the parking lot may be used as a lay down yard, if needed. Lay down yard shall not interfere with surrounding facilities.
6. The existing fire alarm conduit fittings used for Phase 1 was non-American made fittings.
Will these fittings be allowed for Phase 2?
Question 6 Answer: Regardless of previous projects, Phase 2 fittings shall be Buy American
Act compliant.
FA301023R0040
Attachment 15
23 August 2023