Attachment 15 - MAHG21-1099 Reno B412 DCSA Phase 2 Questions and Answers.pdf

PDF 104 KB Posted

Attached to
Renovate B412 for DCSA Phase 2
Solicitation number
FA301023R0040
Issued by

About this file

This document contains questions and answers related to solicitation number FA301023R0040 to renovate building B412 for the Defense Counterintelligence and Security Agency (DCSA) Phase 2 project. The questions and answers provide clarification on work requirements such as only using water for exterior cleaning, upgrading certain walls to STC50 standards, and confirming that laydown areas will not interfere with surrounding facilities. Additionally, current security and fire protection contractors will be identified at the pre-construction meeting, and all phase 2 fittings must comply with the Buy American Act.

View the file

Other files

File Type Posted
Attachment 16 - Fire Alarm Clarification.pdf PDF
Solicitation Amendment FA301023R00400002 SF 30.pdf PDF
Solicitation Amendment - FA301023R00400002.pdf PDF
Solicitation Amendment - FA301023R00400001.pdf PDF
Solicitation Amendment FA301023R00400001 SF 30.pdf PDF
FA301023R0040 Pre-Bid Site Visit Sign-in.pdf PDF
Mechanical Room Photos.pdf PDF
Attachment 10 - Manufacturer Carpet and Adhesive Pricing Sheet.pdf PDF
Attachment 5 - Appendix A AIR BALANCE DIAGRAM.pdf PDF
Attachment 6 - Appendix B MECH RM - DUCT DEMO.pdf PDF
Attachment 2 - Renovate B412 DCSA Phase 2 Specifications 8.10.2023.pdf PDF
Attachment 8 - MAHG 211099 Renovate B412 DCSA Ph-2 MSS.xls XLS spreadsheet
Attachment 4 - Keesler Guidance for Premise Wiring Jan 2023.pdf PDF
Attachment 3 - Renovate B412 DCSA Ph 2 Drawings 10.24.2022.pdf PDF
Attachment 9 - USAF Carpet Ordering Guide Jan2022.pdf PDF
Attachment 1 - Renovate B412 DCSA Phase 2 SOW 8.10.2023.pdf PDF
Attachment 12 - Past Performance Reference List.pdf PDF
Attachment 7 - Appendix C MECH RM - DUCT INSTALL.pdf PDF
Attachment 11 - Past Performance Questionnaire.pdf PDF
Attachment 14 - Submittal Procedures.pdf PDF
Attachment 13 - Wage Determination MS 20220050.pdf PDF
Solicitation - FA301023R0040.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301023R0040 Renovate B412 for DCSA Phase 2

Questions and Answers

1. Clarify the use or no use of chemicals to power wash exterior walls. Sheet A504 note 2 states to use water only on exterior cleaning. Sheet MD-102 Key Note E states to use sodium hypochlorite based cleaner.

Question 1 Answer: Water only. Do not use any chemicals.

2. Wall types labelled 2B (STC50), do we do anything to those walls. Sheet A-103 shows two walls along corridor 103 being type 2B but neither sheet A-103 nor AD-101 shows us doing any work on those walls. Do we demo or rework them to be type 2B?

Question 2 Answer: See drawing A-103, keyed note C which refers to drawing A-501 with details. Yes, rework to type 2B.

3. Who is current security contractor?

Question 3 Answer: This information will be identified at the pre-construction meeting.

4. Who is current Fire Protection and Fire Alarm rep/company?

Question 4 Answer: This information will be identified at the pre-construction meeting.

5. How far away is lay down yard (might by parking lot on north side of bldg.)?

Question 5 Answer: The north-end of the parking lot may be used as a lay down yard, if needed. Lay down yard shall not interfere with surrounding facilities.

6. The existing fire alarm conduit fittings used for Phase 1 was non-American made fittings.

Will these fittings be allowed for Phase 2?

Question 6 Answer: Regardless of previous projects, Phase 2 fittings shall be Buy American

Act compliant.