Attachment 20 - Section 107300 SPECS 20210816.pdf

PDF 73 KB Posted

Attached to
Larcher Chapel Five Phase Renovation Federal contract opportunity
Solicitation number
FA301021R0019
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a solicitation for renovation services and the related technical specifications. The solicitation is for the Larcher Chapel Five Phase Renovation project with an estimated value between $1,000,000 and $5,000,000. It is being issued as a 100% Service Disabled Veteran Owned Small Business set-aside. A mandatory site visit is scheduled for July 30, 2021. The technical specifications outline requirements for protective covers including pre-engineered aluminum walkway and canopy covers. Product components, materials, fabrication, finishes and installation requirements are specified.

View the file

Other files for this federal contract opportunity

Other files attached to Larcher Chapel Five Phase Renovation, newest first.
File Type Posted
Attachment 19 - MAHG201049 Addendum 1.pdf PDF
Attachment 18 - Questions and Answers 20210816.pdf PDF
Solicitation Amendment FA301021R00190002 SF 30.pdf PDF
Attachment 21 - MAHG201049 PIV Installation Plan and Detail 20210816.pdf PDF
Solicitation Amendment FA301021R00190001 SF 30.pdf PDF
Attachment 17 - Questions and Answers 20210804.pdf PDF
Larcher Chapel Sign in Sheet.pdf PDF
Attachment 9 - MAHG201049 Phase 5 DWG 20210503.pdf PDF
Solicitation - FA301021R0019.pdf PDF
Attachment 5 - MAHG201049 Phase 1 DWG 20210503.pdf PDF
Attachment 6 - MAHG201049 Phase 2 DWG 20210503.pdf PDF
Attachment 7 - MAHG201049 Phase 3 DWG 20210503.pdf PDF
Attachment 10 - MAHG201049 MSS.xls XLS spreadsheet
Attachment 14 - MAHG201049 Notice of Compliance.pdf PDF
Attachment 15 - MAHG201049 SF 1444.pdf PDF
Attachment 3 - MAHG201049 Section 22-27 - SPECS 20210702.pdf PDF
Attachment 8 - MAHG201049 Phase 4 DWG 20210503.pdf PDF
Attachment 11 - Wage Det MS20210050.pdf PDF
Attachment 12 - MAHG201049 Past Performance Questionnaire.pdf PDF
Attachment 13 - MAHG201049 Past Performance Reference List.pdf PDF
Attachment 16 - Submittal Procedures.pdf PDF
Attachment 1 - MAHG201049 SOW 20210720.pdf PDF
Attachment 2 - MAHG201049 Sections 2-14 SPECS 20210702.pdf PDF
Attachment 4 - MAHG201049 General DWG 20210503.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 10 73 00

PROTECTIVE COVERS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Pre-engineered, pre-finished extruded aluminum walkway covers.

B. Pre-engineered, pre-finished extruded aluminum canopies.

1.2 RELATED SECTIONS

A. Section 03 10 00 - Concrete Forms and Accessories.

B. Section 03 30 01 – Cast In Place Concrete.

1.3 REFERENCES

A. American Architectural Manufacturers Association (AAMA):

1. AAMA 603 - Voluntary Performance Requirements and Test Procedures for Pigmented Organic Coatings on Extruded Aluminum.

2. AAMA 605 - Voluntary Specification for High Performance Organic Coatings on Architectural Extrusions and Panels.

3. AAMA 607.1 - Voluntary Guide Specification and Inspection Methods for Clear Anodic Finishes for Architectural Aluminum.

4. AAMA 608.1 - Voluntary Guide Specification and Inspection Methods for Electrolytically Deposited Color Anodic Finishes for Architectural Aluminum.

1.4 DESIGN REQUIREMENTS

A. Columns, Beams, Deck, and Trim: Aluminum extrusions.

B. Structural Framing: Interlocking deck sections secured by screws.

1. Heli-arc welded, one-piece rigid bents.

2. Mechanically fastened bents using internally concealed bolted connections.

C. Canopy: Self-draining from deck through bents to discharge point at ground level or as otherwise shown.

D. Building Code: IBC 2018

E. Design Loads:

1. Comply with Building Code for site location.

2. Collateral Loads: Additional loads imposed by other materials or systems identified in contract documents.

F. Structural Design: Prepare complete structural design calculations for canopy members including footings.

G. Structural Design: Prepare complete structural design calculations for canopy members except footings. Provide reactions as required for footing design by a registered professional engineer.

1.5 SUBMITTALS

A. Submit under provisions of the Statement of Work.

B. Product Data: Manufacturer's catalog data, detail sheets, and specifications.

C. Shop Drawings: Layout and erection drawings showing roof framing, deck panels, cross sections, and trim details, clearly indicating proper assembly.

D. Samples: Color selection samples consisting of actual coating material or anodizing process on aluminum extrusions.

E. Quality Assurance/Control Submittals:

1. Qualifications: Letter certifying manufacturer's required qualifications.

2. Structural Design Calculations.

3. Manufacturer's Installation Instructions.

1.6 QUALITY ASSURANCE

A. Overall Standard: Structural engineering design documents stamped by a structural engineer registered to practice in Mississippi.

B. Manufacturer Qualifications: Minimum five years experience in producing covers/canopies with welded bents and of the type specified.

C. Installer Qualifications: Minimum two years experience in erecting covers/canopies of the type specified.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Follow manufacturer's instructions.

PART 2 PRODUCTS

2.1 MANUFACTURERS, OR APPROVED EQUAL

A. Acceptable Manufacturer: Perfection Architectural Systems, Inc., 2310 Mercator

Drive Orlando, FL 32807; ASD. Tel: (800) 238-7207, Fax: (407) 671-8252. Or Equal.

B. Provide all protective covers from a single manufacturer.

2.2 MATERIALS

A. Aluminum Extrusions: 6063 alloy, T-6 temper.

B. Grout: 1 part portland cement, 3 parts masonry sand; 2,000 pounds per square inch (13.8 MPa) compressive strength.

C. Foam Block-Outs: Rigid foam blocks sized as required for column embedment depth and shape.

2.3 COMPONENTS

A. Columns:

1. Radius-cornered aluminum tubular extrusion as required by structural engineering design.

2. Grout Key: Provide two 1-1/2 inch (38 mm) diameter holes in column base, one each in opposite sides.

3. Provide clear acrylic protection coat on surfaces in contact with grout.

B. Beams: Open top aluminum tubular extrusions.

1. Size: As required by structural engineering design.

C. Deck: Rigid-Roll-Lock extruded aluminum, self-flashing, interlocking sections.

1. Size and Profile: As required by structural engineering design.

2. Provide welded endplate water dams where sections terminate at other than drainage channels.

D. Fascia: Manufacturer's standard extruded aluminum fascia sections as shown on drawings and as required to complete the installation resulting in a neat finished appearance.

1. Include manufacturer's standard extruded aluminum gutters.

E. Flashing: Aluminum sheet, thickness as recommended by manufacturer for specific condition.

2.4 ACCESSORIES

A. Fasteners:

1. Deck Screws: No. 14 by 1 inch (25 mm), self-tapping, Type 18-8 stainless steel with neoprene washers.

2. Trim Screws: No. 10 by 1/2 inch (13 mm), self-tapping, Type 18-8 stainless steel.

3. Trim Rivets: Aluminum, size recommended by manufacturer for specific condition.

4. Other Fasteners: Type 18-8 stainless steel, type recommended by manufacturer for specific condition.

2.5 FABRICATION

A. Shop Assembly: Fabricate cross beams and columns into one-piece rigid bents with corners mitered and heli-arc welded to the extent that completed bents can be shipped on local, state, and federal highways without special permit. Provide bolted connections for bents required to be shipped unassembled.

B. Shop Assembly: Fabricate cross beams and columns for field assembled bolted connections.

2.6 FINISHES

A. Bents:

1. Bronze Anodized: AA-M-10C-22A-44, Architectural Class I, comply with

AAMA 608.1.

B. Deck:

C. Fascia/Gutter:

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine footings in which bents will be set. Verify footing locations and elevations comply with shop drawings.

B. Examine building surfaces to which canopy will connect.

C. Coordinate with responsible trade to perform corrective work on unsatisfactory footings or surfaces.

D. Commencement of work by installer is acceptance of existing conditions.

3.2 ERECTION

A. Erect protective covers in accordance with manufacturer's installation instructions.

B. Set bents plumb, straight, and true to line, adequately braced to maintain position until grout has cured.

C. Keep aluminum surfaces from direct contact with ferrous metal or other incompatible materials by applying one coat of clear acrylic coating.

3.3 CLEANING

A. Clean surfaces soiled by work as recommended by manufacturer.

B. Remove surplus materials and debris from the site.

3.4 PROTECTION

A. Protect finished aluminum surfaces from damage due to subsequent construction operations.

END OF SECTION

PART 1 GENERAL
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 DESIGN REQUIREMENTS
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.7 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.2 MATERIALS
2.3 COMPONENTS
2.4 ACCESSORIES
2.5 FABRICATION
2.6 FINISHES
PART 3 EXECUTION
3.2 ERECTION
3.3 CLEANING
3.4 PROTECTION

File details come from the government source that posted it. Updated .