Attachment 10 - MAHG201049 MSS.xls

XLS spreadsheet 77 KB Posted

Attached to
Larcher Chapel Five Phase Renovation Federal contract opportunity
Solicitation number
FA301021R0019
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a material submittals schedule and related federal contract opportunity solicitation. The material submittals schedule outlines 100 line items for the renovation of Larcher Chapel at Keesler Air Force Base, including requirements for submittals on earthwork, concrete, masonry, structural steel, HVAC, plumbing, electrical and fire protection systems. Submittals are due within 10 days of notice to proceed and require various numbers of copies depending on whether electronic or physical submission is specified. The related federal contract opportunity solicitation is seeking bids for the five phase renovation of Larcher Chapel between $1,000,000 to $5,000,000, which is set aside as 100% for Service Disabled Veteran Owned Small Businesses. The base period of performance is 200 to 410 days dependent on options exercised. The pre-bid site visit will take place on July 30, 2021 and bids are due by the solicitation closing date. The work will be awarded on an all or partial basis depending on available funding.

View the file

Other files for this federal contract opportunity

Other files attached to Larcher Chapel Five Phase Renovation, newest first.
File Type Posted
Attachment 18 - Questions and Answers 20210816.pdf PDF
Solicitation Amendment FA301021R00190002 SF 30.pdf PDF
Attachment 20 - Section 107300 SPECS 20210816.pdf PDF
Attachment 21 - MAHG201049 PIV Installation Plan and Detail 20210816.pdf PDF
Attachment 19 - MAHG201049 Addendum 1.pdf PDF
Solicitation Amendment FA301021R00190001 SF 30.pdf PDF
Attachment 17 - Questions and Answers 20210804.pdf PDF
Larcher Chapel Sign in Sheet.pdf PDF
Attachment 3 - MAHG201049 Section 22-27 - SPECS 20210702.pdf PDF
Attachment 8 - MAHG201049 Phase 4 DWG 20210503.pdf PDF
Attachment 11 - Wage Det MS20210050.pdf PDF
Attachment 12 - MAHG201049 Past Performance Questionnaire.pdf PDF
Attachment 13 - MAHG201049 Past Performance Reference List.pdf PDF
Attachment 16 - Submittal Procedures.pdf PDF
Solicitation - FA301021R0019.pdf PDF
Attachment 5 - MAHG201049 Phase 1 DWG 20210503.pdf PDF
Attachment 6 - MAHG201049 Phase 2 DWG 20210503.pdf PDF
Attachment 7 - MAHG201049 Phase 3 DWG 20210503.pdf PDF
Attachment 14 - MAHG201049 Notice of Compliance.pdf PDF
Attachment 15 - MAHG201049 SF 1444.pdf PDF
Attachment 1 - MAHG201049 SOW 20210720.pdf PDF
Attachment 2 - MAHG201049 Sections 2-14 SPECS 20210702.pdf PDF
Attachment 4 - MAHG201049 General DWG 20210503.pdf PDF
Attachment 9 - MAHG201049 Phase 5 DWG 20210503.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG201049Project Title:
RENOVATE LARCHER CHAPELSolicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
2HazMat MSDS115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
3Hazmat Reporting Entry Form1115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
4Recycling and Landfill Report11End of ContractProvide the documents as required per the Environmental packet provided by Keesler AFB.
5Warranty (Manufacturer's) for all items as required in Project Manual1End of Contract
61-Year Warranty (Contractor)1End of Contract
7Section 023000 - Earthwork1110 Days after NTP
8Section 023620 – Termite Control11110 Days after NTP
9Section 027640 – Pavement Joint Sealants11110 Days after NTP
10Section 031000 – Concrete Forming and Accessories111110 Days after NTP
11Section 032000 – Concrete Reinforcing111110 Days after NTP
12Section 033001 – Cast in Place Concrete111110 Days after NTP
13Section 036000 – Non-Shrink Grouting11110 Days after NTP
14Section 048100- Unit Masonry Assembly111110 Days after NTP
15Section 051200 – Structural Steel111110 Days after NTP
16Section 053110 - Steel Roof Decking111110 Days after NTP
17Section 054000 – Cold Formed Framing111110 Days after NTP
18Section 055000 – Metal Fabrication111110 Days after NTP
19Section 061000 – Rough Carpentry111110 Days after NTP
20Section 062000 – Finish Carpentry111110 Days after NTP
21Section 066500 – Solid Surfacing1111110 Days after NTP
22Section 071900 – Water Repellents11110 Days after NTP
23Section 072100 – Building Insulation111110 Days after NTP
24Section 072600 – Vapor Barriers1111110 Days after NTP
25Section 075200 – Modified Bituminous Roofing11111110 Days after NTP
26Section 076200 – Sheet Metal Flashing and Trim1111111110 Days after NTP
27Section 076213 – Sheet Metal Gutters and Downspouts1111111110 Days after NTP
28Section 077100 – Manufactured Roof Specialties1111111110 Days after NTP
29Section 078400 – Fire stopping11111110 Days after NTP
30Section 078410 – Through Penetration Fire Stop Systems11111110 Days after NTP
31Section 078420 – Fire Resistive Joint System11111110 Days after NTP
32Section 079200 – Joint Sealants111111110 Days after NTP
33Section 081000 – Steel Frames11111111110 Days after NTP
34Section 081100 – Steel Doors11111111110 Days after NTP
35Section 082110 – Wood Doors11111111110 Days after NTP
36Section 084113 – Aluminum Frame Entrances and Storefronts11111111110 Days after NTP
37Section 087100 – Finish Hardware11111111110 Days after NTP
38Section 087453 - Access Control Hardware11111111110 Days after NTP
39Section 088000 - Glazing11111111110 Days after NTP
40Section 088190 - Hurricane Resistant Glazing11111111110 Days after NTP
41Section 092216 - Non-Load Bearing Steel Framing1111110 Days after NTP
42Section 092500 - Gypsum Board111111110 Days after NTP
43Section 093000 – Porcelain Tile111111110 Days after NTP
44Section 093100 – Ceramic Tile111111110 Days after NTP
45Section 095110 – Acoustical Ceiling Panels111111110 Days after NTP
46Section 096519 – Resilient Tile Flooring111111110 Days after NTP
47Section 096780 – Resilient Wall Base111111110 Days after NTP
48Section 096813 – Tile Carpet111111110 Days after NTP
49Section 099100 – Painting111111110 Days after NTP
50Section 104310 – Signage111111110 Days after NTP
51Section 101550 – Toilet Compartments111111110 Days after NTP
52Section 105230 – Fire Extinguishers and harware11111110 Days after NTP
53Section 108000 – Toilet Accessories111110 Days after NTP
54Section 144200 – Wheelchair Lift1111111110 Days after NTPVerification Samples. O&M manuals due at project closeout
55Section 220529 – Hangers and Supports for Plumbing Piping and Equipment11110 Days after NTP
56Section 220553 – Identification for Plumbing Piping and Equipment110 Days after NTP
57Section 220800 – Commissioning of Plumbing111110 Days after NTP
58Section 221116 – Domestic Water Piping1111110 Days after NTP
59Section 221313 – Sanitary Waste and Vent Piping (includes Storm Piping)1111111110 Days after NTP
60Section 230513 – Common Motor Requirements for HVAC Equipment (Motor Starters)111111110 Days after NTP
61Section 230516 – Expansion Fitting and Loops for HVAC Piping (piping and Fittings)111110 Days after NTP
62Section 230519 – Meters and Gauges for HVAC Piping111110 Days after NTP
63Section 230523 – General Duty Valves for HVAC Piping13310 Days after NTP
64Section 230548 – Vibration and Seismic Controls for HVAC1111110 Days after NTP
65Section 230595 – HVAC Testing, Adjusting and Balancing Procedures137 days after TAB
66Section 230700 – HVAC Insulation111110 Days after NTP
67Section 230900 – Instrumentation and Controls for HVAC1111111110 Days after NTPSamples as indicated in section 23 09 00
68Section 230920 – Adjustable Frequency Drives11111110 Days after NTP
69Section 231123 – Facility Natural Gas Piping111110 Days after NTPO&M documentation due at project closeout (replacement part numbers)
70Section 232116 – Hydronic Piping Specialties1111110 Days after NTP
71Section 232123 – Hydronic Pumps Centrifugal1111110 Days after NTP
72Section 232500 – HVAC Water Treatment11111111110 Days after NTP
73Section 233113 – Metal Duct11111110 Days after NTP
74Section 233200 – Sheet Metal Accessories1111110 Days after NTP
75Section 23 – Air Handling Units111111110 Days after NTP
76Section 233600 – Air Terminal Unit (Variable Volume Terminals)111111110 Days after NTP
77Section 235239 – Fire Tube Boilers111111110 Days after NTP
78Section 236423 – Scroll Water Chillers11111110 Days after NTP
79Section 237713 – Expansion Tanks111110 Days after NTP
80Section 260501 – Minor Electrical Demolition110 Days after NTP
81Section 260519 – Low-voltage Electrical Power Conductors and Cabled110 Days after NTP
82Section 260526 – Grounding and Bonding for Electrical Systems110 Days after NTP
83Section 260529 – Hangers and Supports for Electrical Systems110 Days after NTP
84Section 260534 – Conduit110 Days after NTP
85Section 260537 - Boxes110 Days after NTP
86Section 260923 – Lighting Control Devices1111110 Days after NTP
87Section 262416 - Panelboards110 Days after NTP
88Section 262726 – Wiring Devices1110 Days after NTP
89Section 262800 – Low Voltage Circuit Protective Devices1110 Days after NTP
90Section 262818 – Enclosed Switches110 Days after NTP
91Section 264300 – Surge Protection1110 Days after NTP
92Section 265100 – Interior Lighting11110 Days after NTP
93Section 255600 – Exterior Lighting11110 Days after NTP
94Section 271005 – Structured Cabling for Voice & Data1110 Days after NTP
95Section 273000 – Telephone-Data-CATV110 Days after NTP
96Project Work Schedule (AF3064)110 Days after NTP
97Certified Fire Protection Plans1310 Days after NTP
98Certified Fire Alarm Plans111310 Days after NTP
99Certified Fire Protection Mass Notification Plans111310 Days after NTP
100Project O&M Manuals11Project Closeout2 Hard Copies and 3 Compact Disks

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)