This document package includes engineering drawings and specifications for the renovation of Larcher Chapel at Keesler Air Force Base, along with the corresponding federal contract opportunity solicitation. The renovation scope of work involves updating the existing chapel, installing new walls and a stage, and mechanical, plumbing and fire protection system work. The engineering consultants include an architect, structural engineer, and mechanical, electrical and plumbing engineers.
The federal contract opportunity is solicitation number FA301021R0019 for the five phase renovation of Larcher Chapel with an estimated value between $1 million to $5 million. This acquisition is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The period of performance will be a minimum of 200 days up to 410 days depending on the number of contract line items funded at time of award. Funds are not presently available and no award will be made until funding is obtained.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT GENERAL NOTES
A. MARASCA G. REED 3709
MAHG20-1049
RENOVATE LARCHER CHAPEL
CONSULTANTS:
SEAL:
SEAL:
SEAL:
COMMENTS:
THE DESIGN STUDIO OF
FRANK GENZER JR. AIA
a r c h i t e c t
145 St. Jude st. Biloxi, ms
228.380.8008 f: 228.374.2323
PHASE 2 KEY PLAN
SCOPE:
UPDATE TO EXISTING CHAPEL.
INSTALLATION OF NEW WALLS AND STAGE
MECHANICAL,
PLUMBING,
FIRE PROTECTION
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
STRUCTURAL
ENGINEERS:
TERRY MORAN
TERRY MORAN &
ASSOCIATES PLLC
370 COURTHOUSE RD,
GULFPORT, MISSISSIPPI
ELECTRICAL
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
E2.0
AS NOTEDBSPB
PB
X
X
A. MARASCA G. REED 3709
MAHG20-1049
RENOVATE LARCHER CHAPEL
CONSULTANTS:
SEAL:
SEAL:
SEAL:
COMMENTS:
THE DESIGN STUDIO OF
FRANK GENZER JR. AIA
a r c h i t e c t
145 St. Jude st. Biloxi, ms
228.380.8008 f: 228.374.2323
PHASE 2 KEY PLAN
SCOPE:
UPDATE TO EXISTING CHAPEL.
INSTALLATION OF NEW WALLS AND STAGE
MECHANICAL,
PLUMBING,
FIRE PROTECTION
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
STRUCTURAL
ENGINEERS:
TERRY MORAN
TERRY MORAN &
ASSOCIATES PLLC
370 COURTHOUSE RD,
GULFPORT, MISSISSIPPI
ELECTRICAL
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
IS
TE
RED PROFESS IONAL
E2.1
AS NOTEDBSPB
PB
E2.1
1/8"
ELECTRICAL DEMOLITION PLAN
E2.1
1/8"
BALCONY ELECTRICAL DEMOLITION PLAN
F I R S T F L O O R P L A N
A1.0
PROJECT
NORTH
PROJECT
NORTH
NEW CHAPEL
SANCTUARY AREA
MECHANICAL
STOR.
STOR.
ALTAR
JAN.
TLT.
LOBBY-2
FOYER
CORRIDOR
CORRIDOR 2
RESTROOM
RESTROOM
OFFICE
OFFICE
FOYER
A. MARASCA G. REED 3709
MAHG20-1049
RENOVATE LARCHER CHAPEL
CONSULTANTS:
SEAL:
SEAL:
SEAL:
COMMENTS:
THE DESIGN STUDIO OF
FRANK GENZER JR. AIA
a r c h i t e c t
145 St. Jude st. Biloxi, ms
228.380.8008 f: 228.374.2323
PHASE 2 KEY PLAN
SCOPE:
UPDATE TO EXISTING CHAPEL.
INSTALLATION OF NEW WALLS AND STAGE
MECHANICAL,
PLUMBING,
FIRE PROTECTION
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
STRUCTURAL
ENGINEERS:
TERRY MORAN
TERRY MORAN &
ASSOCIATES PLLC
370 COURTHOUSE RD,
GULFPORT, MISSISSIPPI
ELECTRICAL
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
E2.2
AS NOTEDBSPB
PB
E2.2
1/8"
LIGHTING PLAN
F I R S T F L O O R P L A N
A1.0
PROJECT
NORTH
PROJECT
NORTH
NEW CHAPEL
SANCTUARY
AREA
MECHANICAL
STOR.
STOR.
ALTAR
MUSIC ROOM
STUDY
MECHANICAL
ART ROOM
JAN.
TLT.
LOBBY-2
OFFICE
OFFICE
MECHANICAL EQP. YARD
FOYER
CORRIDOR
CORRIDOR
A. MARASCA G. REED 3709
MAHG20-1049
RENOVATE LARCHER CHAPEL
CONSULTANTS:
SEAL:
SEAL:
SEAL:
COMMENTS:
THE DESIGN STUDIO OF
FRANK GENZER JR. AIA
a r c h i t e c t
145 St. Jude st. Biloxi, ms
228.380.8008 f: 228.374.2323
PHASE 2 KEY PLAN
SCOPE:
UPDATE TO EXISTING CHAPEL.
INSTALLATION OF NEW WALLS AND STAGE
MECHANICAL,
PLUMBING,
FIRE PROTECTION
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
STRUCTURAL
ENGINEERS:
TERRY MORAN
TERRY MORAN &
ASSOCIATES PLLC
370 COURTHOUSE RD,
GULFPORT, MISSISSIPPI
ELECTRICAL
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
IS
TE
RED PROFESS IONAL
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
IS
TE
RED PROFESS IONAL
E2.3
AS NOTEDBSPB
PB
E2.3
1/8"
FLOOR POWER & COMMUNICATIONS PLAN
A. MARASCA G. REED 3709
MAHG20-1049
RENOVATE LARCHER CHAPEL
CONSULTANTS:
SEAL:
SEAL:
SEAL:
COMMENTS:
THE DESIGN STUDIO OF
FRANK GENZER JR. AIA
a r c h i t e c t
145 St. Jude st. Biloxi, ms
228.380.8008 f: 228.374.2323
PHASE 2 KEY PLAN
SCOPE:
UPDATE TO EXISTING CHAPEL.
INSTALLATION OF NEW WALLS AND STAGE
MECHANICAL,
PLUMBING,
FIRE PROTECTION
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
STRUCTURAL
ENGINEERS:
TERRY MORAN
TERRY MORAN &
ASSOCIATES PLLC
370 COURTHOUSE RD,
GULFPORT, MISSISSIPPI
ELECTRICAL
ENGINEERS:
GSE
GULF STATES ENGINEERING, INC
1816 PASS ROAD
GULFPORT, MISSISSIPPI
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
ENGINEER
14461
JO
HN T . WADE
STATE OF M I SS I SS I P
P
IRE
G
I S
TE
RED PROFESS IONAL
E2.4
AS NOTEDBSPB
PB
E2.4
POWER RISER DIAGRAM
FLOOR
CEILING
E2.4
COMBINATION POWER &
COMM. FLUSH FLOOR BOX
E2.4
POWER FLUSH FLOOR BOX
| 29 A2.0 |
| 30 A2.1 |
| 31 A2.2 |
| 32 A2.3 |
| 33 A2.4 |
| 34 E2.0 |
| Sheets and Views |
| Model |
| 35 E2.1 |
| Sheets and Views |
| M20102 E2.1-E2.1 |
| 36 E2.2 |
| Sheets and Views |
| M20102 E2.2-E2.2 |
| 37 E2.3 |
| Sheets and Views |
| M20102 E2.3-E2.3 |
| 38 E2.4 |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .