This addendum pertains to a solicitation for the renovation of Larcher Chapel at Keesler Air Force Base in Mississippi. The scope of work includes five phases of renovation and involves grading, fine grading, and installing centipede sod on disturbed areas of the site totaling approximately 4,800 square feet. The contractor will be responsible for watering and maintaining the sod for a minimum of six months following project closeout. The addendum omits sections pertaining to general site work, shop drawings and samples, and temporary heating, cooling and ventilation, and adds a section on specifications. Accompanying drawings are also included depicting fire hydrant installation plans. The related federal contract opportunity is a solicitation between $1,000,000 to $5,000,000 set aside for Service-Disabled Veteran-Owned Small Businesses. Pricing shall be included in Section B of the response. The pre-bid site visit was scheduled for July 30, 2021 and responses are due in accordance with instructions outlined in Sections L and M regarding proposal preparation and evaluation factors. The contracting agency is the Department of the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16 August 2021
ADDENDUM #1
PROJECT NAME: Renovate Larcher Chapel
LOCATION: Building 3709 – Keesler AFB, Mississippi
PROJECT NUMBER: MAHG201049
Addendum #1 consists of the following:
• Addition to the Statement of Work
• Contractor Questions and Answers
• Omit and Add Specifications
ADDENDUM ITEMS:
1. Changes within the SOW consist of the following:
a. Reference 3.2.4 Scope of Work: Phase #5 (Alternate #4):
Add the following subparagraph:
“b. Grade, fine grade and supply and install centipede sod on all disturbed areas of the site (approximately 4800 SF). Contactor shall water and maintain the sod a min. of 6 months following close out. (Reference Sheet A5.1 Grading Plan)
2. Referencing the specifications, OMIT Sections:
a. Section 020000 - General Site work
b. Section 013323 – Shop Drawings, Product Data, and Samples (Mechanical)
c. Section 015123 – Temporary Heating, Cooling, and Ventilation
3. Referencing the specifications, ADD Sections:
a. Attachmnent 20 – Section 107300 SPECS 20210816
4. Referencing the Drawings: Add the following sheets:
a. Attachment 19 – MAHG201049 Fire Hydrant Installation Plans
END OF ADDENDUM #1