Post Solicitation QA ACTS RFP 27 Sep.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Air Combat Training Systems Federal contract opportunity
- Solicitation number
- FA300223R0014
About this file
This document contains questions and answers regarding a solicitation for Air Combat Training Systems support services. The solicitation is issued by the Department of the Air Force Air Education and Training Command for management, operations and maintenance of air combat training systems located at multiple ranges and sites. Services include maintenance, operations and transportation of threat emitter systems; maintenance of communications, power generation and other infrastructure; and technical support. Proposals are due by October 2, 2023 with a potential extension to October 16, 2023. The period of performance for the base contract is February 1, 2024 through January 31, 2026. Pricing must be fixed-price and the solicitation is set aside for small businesses.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFP Page # | Section # | Paragraph Number | Question | Answers |
| PWS | 2.2 Operations | 2.2.3.1.2 | "The contractor shall ensure the transportation of the JTE Systems from ranges to Gila Bend AFAF and range to range and within BMGR as missions require." |
| According to previous Q&A - the Government stated that this contract DOES NOT provide movement of JTE Systems, but the PWS states contractor shall ensure transprotation of the JTEs. Can the Government please explain the actual requirement? | The ACTS contractor will be responsible for ensuring the JTEs are readied for transportation. The actual transporting of the JTEs will be performed by another contract located at Gila Bend AFAF. | ||||
| PWS | 2.2 Operations | 2.2.3.1.2 | During the movement of JTEs, from range to range, within the BMGR, will personnel be required to break down and set up JTE? If so, can the government please provide historical workload data for this process? | Normally, there is a minimum of 3 ACTS techs providing support to ready a JTE for transport. It takes approx 5 hrs total for teardown and reassembly. There is no workload est as it falls within the normal contracted activities of the contract. Any additional requirements will be worked out between the Lead COR, ACTS PM and Site Manager. | |
| Previous Q&A | Q&A Sept 1 | Question 30 | LMOC WarRoom was mentioned in the previous Q&A but the PWS does not state or have LMOC WarRoom written. The Q&A stated that LMOC is required to operate systems. Is LMOC WarRoom an operational or Past Performance requirement for contractors? Can an offer be technically acceptable if they do not have LMOC WarRoom experience? | Live Mission Operations Center (LMOC) is a new and emerging requirement while advantageous to have the experience, this is not an operational or past performance requirement for an offeror. Additionally, unless the next contractor replaces their entire workforce (highly unlikely), there will be experienced personnel to operate and maintain LMOC. | |
| PWS | Attachment 4 | Equipment Listing | According to Attach 4, JTE sites includes Point-to-Point (PTP) radio/tower - Is the contractor required or expected to maintain these radio(s) and tower(s) for these sites? Is the maintenance workload estimate included in the provided attachement? Please provide all scheduled/unscheduled maintenance historical workload data for all 15 JTE work sites. | Yes, the contractor is expected to maintain the comm links to these sites. Only half of these sites will be requiring any maintenance at a given time as there are only 7 JTEs. Maintenance will likely be unscheduled as there are no documented PMIs for the equipment used in these comm links. Workload est will be as time and personnel allow within the duty day or on an as-needed basis worked out between the Lead COR, ACTS PM and Site Manager. | |
| PWS | Attachment 4 | Equipment Listing | According to Attach 4, JTE sites have stand alone fuel tanks - Is the contractor required to refuel and perform fuel tank maintenance to ensure EPA, NFPA, and other regulatory compliance/requirements? Are historical workload estimate(s) included in the provided attachment for these services? Does these require specialized certifications, licenses, or other specialized training? | Refueling is not accomplished by the ACTS contract. However, reporting when they need refueling is, and is normally accomplished during the 28-day PMIs of the threats. Because of the PMIs, there are no specific workload estimates for this task. Inspections have normally been done by this contract, but there are no specific certs or licenses required. | |
| PWS | TECHNICAL SUPPORT SERVICES | 4.4 Technical Support Services | PWS states "Accomodating this growth with increased data, communications, power generation, and other infrastructure upgrades will increase the number and complexity of engineering projects and must be considered in long-and-short-range planning, budgeting, and cost estimation". ---- Can the government provide a measurable workload for the performance of this kind of work as required in order to establish costs in an FFP environment? Or with this level of unknown workload, is the Government considering this an over and above and priced as required? | There is no workload estimate for this task as it is an as-needed function. When a need arrises, execution of this requirement will be worked out between the Lead COR, ACTS PM and Site Manager. | |
| PWS | EMPLOYEE WORK HOURS | 2.1.2 | PWS requires 30-minute or 1-hour for start up and shut down (departmental opening/closing, EW pedestal/generator startup, and P5 Pod Pre-loading) for various departments. Is this included in the 16 hour work day/flying schedule? | PWS was updated to eliminate references to work hours due to the working hours are based on the flying schedule of 0730-1130. | |
| PWS | SECURITY CLEARANCE REQUIREMENTS | 3.3 Information Protection | Per the requirement of the PWS regarding 54 OSS/OSP SCIF and TS/SCI, does the Government require the contractor to have TS/FCL at time of award in order to be eligible for award? | Yes, The contractor must have an TS/FCL at the time of contract award which is commensurate with the highest level of classified access as identified in the PWS. An exact date for contractors at Holloman AFB to possess a TS/SCI clearance is dependent upon actions presently underway to certify facilities for TS access and use. | |
| EWIG | EQUIPMENT | At EWWG, it was mentioned that Luke utilizes numerous other EW equipment, such as Garmin equipment, which is used for threat missions. Is this being utilized/maintained by this contract? If so, please provide contractor responsibilities and any historical workload estimates required. | Presently, the Garmin threats are not being operated or maintained by ACTS contract personnel. | ||
| PWS/Appendix 2 | Appendix 2 | App 2 Publications | Can the Government please provide the range regulations that apply to this contract? | Updated to add LAFB 13-212 / Holloman uses AFI 13-212V1 Holloman AFB ADDENDA-A Included alos DAFMAN 13-212V1, Range Operations, corrected TO title. | |
| Section L | Section L.3.2.5 | L.3.2.5 | Is the Government willing to accept with QCP as a seperate attachment to the proposal and be excluded from page count given the 25 page limit? | Revised allowable page limit to 40 pages to accommodate. | |
| Cost Volume | Are awardees required to pay NMGRT if awarded this contract? | Added clause FAR 52.229–10 to solicitation. Transfer of "tangible personal property" in relation to a cost CLIN shall be eligible pending coordination with CO and COR. | |||
| Attachment 4 | Equipment Listing | The PWS requires the contractor execute scope and maintain equipment listed in Appendix 3 for which there is no workload data provided. Offerors are unable to ensure adequate resources have been proposed to cover unknown workload. Will the government please provide workload data for the following items: |
1) Generator Maintenance (200' Tower, Child's Mountain South, White Tanks)
2) All items on Keystone Peak & Smith Peak
3) Associated equipment at Building 500
| 4) DM | To extensively breakdown each equipment item workload listed in Appendix 3 would be exahuastive. Recommend the offerors review Appendix 6, historical workload estimates for hours of workload regarding equipment and services required. | ||||
| PWS | Command Supported Equipment | 4.2.7.2 | Can the Government confirm that work performed on unlisted equipment will be captured in the cost CLIN? | Unlisted equipment costs will be supported by CLIN. Any overtime will be coordinated as mission dictates and paid using a separate CLIN | |
| Attachment 7 | Workload | 1.2.5 | According to 1.2.5 Maintenance Workload, "estimated workload is based on normal scheduled maintenance. NOTE: Unscheduled maintenance varies widely, dependent primary on usage of the equipment and climatic conditions" This implies that estimated maintenance workload is based on only historical scheduled maintenance. Can the govenrment provide hsitorical unscheduled maintenance workload to allow for proper FFP staffing? | No, it is unscheduled. So an as needed requirement cannot be quantified at this time. | |
| General | Not Applicable | Will there be an Industry Day and/or Site Visit? If so, When? | Due to logistical difficulty and extensive attachments, the Government determined that neither was/is necessary. | ||
| Amendment 1 | Questions are due on September 15, 2023 at 5PM CT. Proposals are due on October 2, 2023 at 4PM CT. | When will Responses to the Questions be issued? | |||
| Depending on the question response receipt will an extension be available? | An extension will change the due date to 16 Oct at 1600 CST. | ||||
| L.2.2.g/SF 33 | Electronic copies must be provided via E-mail to the Government POCs identified in L.1.4. IAW Block 9 of the SF33. Proposals must be received in the POC's inbox by the date and time specified in Block 9 | ||||
| 1.2.3.2.2 | The Contractor shall identify the COMSEC Manager and Alternate at all ACTS primary locations; | Please clarify. The paragraph identifier specifies (Luke only) is the contractor going to be responsible for providing CRO personnel at primary locations or just Luke AFB? | PWS updated to remove Luke AFB only verbiage | ||
| 2.2.3.2. | Moving Target System | In the document this is lined out. Is it the intent of the government to remove moving target support from the PWS? | Moving target support is not required for the purposes of this contract soliciation. PWS lined out information was removed. | ||
| 3.2.3.3. | Pod (to include installing interfaces) all aircraft as needed. Last minute schedule changes shall be accomplished as the mission allows. | Is it the intent of the government for contractors to install the P-5s on the aircraft or just transport to the flight line for Military personnel to perform aircraft mounting operations? | Contractors will support PODS transport, install, O&M, and remove Pods in support of PWS needs. | ||
| Appendix 8 | Table | For those locations that the government is not providing services, is the contractor expected to provide services similar to that provided by the government? For example EMS services are only provided at Luke, insect/rodent control is only provided at Luke. | No, this is not the contract expectation. | ||
| Appendix 4 GFP | GFP list | The GFP list does not list any P-5 Pods at Luke AFB, but Appendix 5 lists Bldg 446 POD Maintenance Shop. Can the government provide a complete listing of equipment associated with Luke to include the # of PODs and auxilary equipment. | Appendix 4 updated to add sufficient Luke PoD Equipment Details. | ||
| RFP L.5 Volume III Price proposal | Page 9 of 12 | Factor does not specify a requirement for a cost volume for a subcontractor. | Subcontracting is not a requirement for a small business set aside. | ||
| RFP Section F | Attachment 22 | Schedule F states CLIN 0001 is 3/1/24 - 1/31/26 and no tab for CLIN 9999. |
a) Can the Government clarify which is the correct start date (2/1/24 or 3/1/24)?
b) Should the pricing for CLIN 9999 be included with CLIN 0001 in the Spreadsheet? 2/1/24 is the proposed start of transition (CLIN 9999). Period of performance is restricted to 12 month intervals, therefore the first performance period after transition is 11 months. Following PoPs will be for 12 months.
CLIN 9999 for transition is separate from the first performance period CLINS.
| Attachment 22 Pricing Model | Year 1 appears to have all NTE CLINS in the same as Yr2 except CLIN 0009. Is the $18,000 in year 1 and $15,000 in subsequent years correct? | CLIN 0009 for all CLINS adjusted to $15,000 | |
| PWS | Page 32 Para 2.4 and Page 39 Para 3.5 regarding helicopter logistics. | 2.4 Helicopter Logistics |
On an as needed basis, the contractor shall, as a minimum, accomplish the following as they pertain to the helicopter logistics at Luke AFB ACTS:
- Provide helicopter transportation for the maintenance to remote sites, when required, when other means of transportation are not feasible.
- Schedule required helicopter flight operations through range scheduling so as not to impact range training operations.
-Ensure the requested operations will not impact or interfere with any environmental or cultural concerns of the range complex.
Questions:
a) Will the Air Force coordinate a military helicopter for these missions or lease a civilian helicopter?
b) If the Air Force will provide the helicopter, what is the estimated time from the request by the contractor until a mission can be flown?
c) If a military helicopter is not provided what are the arrangements to pay for the civilian helicopter?
d) Can the government provide an estimate for the number of logistics missioins requiring a helicopter on an annual basis? (Luke AFB - BMGR Range) Helicopters supporting remote sites would rarely be required
a) Will the Air Force coordinate a military helicopter for these missions or lease a civilian helicopter?
Typically this will require civilian helicopter contracted or leased support to effect.
b) If the Air Force will provide the helicopter, what is the estimated time from the request by the contractor until a mission can be flown?
Use of helicopters would be a rare or an infrequent need, typically requiring preplanning affording ample time, when feasible, for the contractor to fulfill customer requests and to effect necessary contracted helicopter operations.
c) If a military helicopter is not provided what are the arrangements to pay for the civilian helicopter?
The contract would utilize allocated CLIN funds to fund the request. Payment arrangements would be worked through the COR.
d) Can the government provide an estimate for the number of logistics missions requiring a helicopter on an annual basis?
Rare, if at all. These potential requirements were identified in the PWS in the event these services were to be required.
PWS Page 30, Para 2.3.5.1 Air National Guard Air Force Reserve Command Test Center Support AATC "has a requirement for cryptographic key at its SCS S-280 Shelter located in Gila Bend… The contractor will load Link-16 crypto-keys daily prior to AATC range times and load SADL crypto-keys monthly on the first duty day of the month."
Questions:
a) Shelter S-280 is not included in the GFP list; can the government confirm this shelter will be maintained by the government?
b) Is there a secure safe available on Gila Bend for the keys and the crypto material? If so, who is responsible for it?
c) Is there a generator or alternative power source available and connected on site?
d) Please confirm if a two-man rule is required for moving the keys and crypto material from Luke to/from Gila Bend? a) Shelter S-280 is not included in the GFP list; can the government confirm this shelter will be maintained by the government?
This facility will be maintained by the government.
b) Is there a secure safe available on Gila Bend for the keys and the crypto material? If so, who is responsible for it?
There is a secure safe at Gila Bend in AATC's shelter, the ACTS contractor is responsible for the keys and material in the safe.
c) Is there a generator or alternative power source available and connected on site?
Yes, maintained by AATC
d) Please confirm if a two-man rule is required for moving the keys and crypto material from Luke to/from Gila Bend?
There is not a two-person requirement for moving crypto from Luke to/from Gila Bend AAF.
| PWS Attachment 7, Appendix 6 Workload information | Page 3 or 5 Para 1.2.2 | The cited paragraph provides estimates of Maintenance and training for cryptographic equipment and information and assurance related systems. Maintenance and load of cryptographic equipment does not specify equipment associated with AATC. | ||
| Question: Can the government provide clarifying information regarding the workload estimate associated with re-keying the AATC equipment at Gila Bend? | The workload data was reassessed and updated in the ACTS Security Workload estimate which is updated in Appendix 6. | |||
| PWS Attachment 7, Appendix 6 Workload information | Paragraph 1.1.1, 1.1.2, 1.2.3 | Can the Government provide annual workload data for the years FY19-23 in each estimate? | Atch 7, Appendix 6 Updated to provide most current estimates. | |
| PWS Attachment 7, Appendix 6 Workload information | Page 5 of 5, Paragraph 1.2.5 | P5 ACTS Maintenance Workload table has two FY22 Columns. | ||
| Question: Can you confirm the last column should be FY23 | Yes, this is a typo and should represent FY23. Attachment 7, Appendix 6 to be updated. Hours for FY23 are estimated pending EOY of data. |
| PWS Attachment 7, Appendix 6 Workload information | Page 4 of 5, Paragraph 1.2.4 | Required Ancillary Duties table has 3,000 hours of scheduling. | |
| Question: Can the government clarify specifically what the contractor will be responsible for scheduling? | This specifies when Snakeye takes over scheduling PWS Para 2.2.2.1. Lines 3-5 The 3000 hrs. are the calculations using 1530-2330 x the number of calendar days. |