ACTS ATCH 7 Appendix 6 Workload Est.pdf

PDF 471 KB Posted

Attached to
Air Combat Training Systems Federal contract opportunity
Solicitation number
FA300223R0014
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document provides historical workload estimates for an Air Combat Training System at multiple Air Force bases. It outlines projected operational, maintenance, demonstration, security, and travel workloads. Operational workloads include sorties, threat operations, range scoring missions, and Link 16 missions. Maintenance workloads cover subsystem hours for air, ground, and electronic warfare systems. Demonstration workloads estimate tours and visitors. Security workloads include training, cryptographic equipment maintenance, and material transportation. Required travel supports government conferences. The related solicitation seeks an Air Combat Training System for the Department of the Air Force Air Education and Training Command under solicitation number FA300223R0014.

View the file

Other files for this federal contract opportunity

Other files attached to Air Combat Training Systems, newest first.
File Type Posted
ACTS ATCH 7 (Amd 2) Appendix 6 Workload Est (4 Oct 23) .pdf PDF
Solicitation Amendment FA300223R00140002 SF 30.pdf PDF
ACTS ATCH 4 (Amd 2) Appendix 3 Site Loc Maj Sys (6 Oct 23).pdf PDF
ACTS ATCH 5 (Amd 2) Appendix 4 GFP (4 Oct 23) .pdf PDF
Summary - FA300223R0014 Amendment 2.pdf PDF
ACTS ATCH 1 (Amd 2) PWS 6 Oct 23.pdf PDF
ACTS ATCH 20 (Amd 1) Section L.pdf PDF
Summary - FA300223R0014 Amendment 1.pdf PDF
ACTS ATCH 7 (Amd 1) Appendix 6 Workload Est (28 Sep 23).pdf PDF
ACTS ATCH 22 (Amd 1) Pricing Model.xlsx XLSX spreadsheet
ACTS ATCH 3 (Amd 1) Appendix 2 Publications (25 Sep 23).pdf PDF
ACTS ATCH 5 (Amd 1) Appendix 4 GFP (26 Sep 23).pdf PDF
Post Solicitation QA ACTS RFP 27 Sep.xlsx XLSX spreadsheet
Solicitation Amendment FA300223R00140001 SF 30.pdf PDF
ACTS ATCH 1 (Amd 1) PWS 26 Sep 23.pdf PDF
ACTS RFP Cover Letter.pdf PDF
ACTS ATCH 11 Draft RFP QA.xlsx XLSX spreadsheet
ACTS ATCH 12 PIEE Vendor Registration.pdf PDF
Solicitation - FA300223R0014.pdf PDF
ACTS ATCH 8 Appendix 7 Final Rep Plns Appt.pdf PDF
ACTS ATCH 18 2022-2025 CBA - Gila Bend Luke.pdf PDF
ACTS ATCH 22 Pricing Model.xlsx XLSX spreadsheet
ACTS ATCH 4 Appendix 3 ACTS Site Loc Maj Sys.pdf PDF
ACTS ATCH 10 Appendix 9 Addl Info.pdf PDF
ACTS ATCH 16 PPQ.pdf PDF
ACTS ATCH 15 Past Performance Information Sheet.pdf PDF
ACTS ATCH 14 - Subcontractor Consent Letter.pdf PDF
ACTS ATCH 1 PWS 29 Aug 23.pdf PDF
ACTS ATCH 2 Appendix 1 Def Abb.pdf PDF
ACTS ATCH 3 Appendix 2 Publications.pdf PDF
ACTS ATCH 5 Appendix 4 GFP.pdf PDF
ACTS ATCH 6 Appendix 5 GF Fac .pdf PDF
ACTS ATCH 9 Appendix 8 GF Services.pdf PDF
ACTS ATCH 13 - Client Authorization Letter.pdf PDF
ACTS ATCH 17 2022-2025 CBA - Holloman.pdf PDF
ACTS ATCH 20 Section L.pdf PDF
ACTS ATCH 21 Section M.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR COMBAT TRAINING SYSTEM

APPENDIX 6 TO ATTACHMENT 1 – Historical Workload Estimates

TABLE OF CONTENTS

1 Historical Workload Estimates 1

1.1. Holloman AFB 1

1.1.1. ACTS Operational Workload 1

1.1.2. Maintenance Workload 1

1.1.3. ACTS Demonstrations 2

1.1.4. Government Required Travel Workload

1.2. Luke AFB

1.2.1. ACTS Operational Workload 2

1.2.2. Secure Facility and Equipment Management Workload 3

1.2.3. Manned Range Operational Workload 3

1.2.4. Required Ancillary Duties 4

1.2.5. Maintenance Workload 4

1.2.6. Government Required Travel Workload 5

i

FA3002-23-R-0014, Air Combat Training System

Attachment 7

APPENDIX 6

WORKLOAD INFORMATION

1.1. Holloman AFB

1.1.1. ACTS OPERATIONAL WORKLOAD

The following table depicts the projected operational workload at Holloman for FY16-23. The data provided is based on information available. Note: Two UMTEs will be added in FY17.

P5 ACMI OPERATIONAL WORKLOAD AT HOLLOMAN AFB

FY16 FY17 FY18 FY19-23

P5 SORTIES

SCHEDULED/FLOWN

7741 8902 11611 15482

THREAT OPERATIONS 0 168 468 624

1.1.2. MAINTENANCE WORKLOAD

The following table depicts the projected maintenance workload at Holloman AFB. The table depicts total expected number of ‘Maintenance Man hours Expended (per Subsystem)’. The data provided is based on information available.

P5 ACTS MAINTENANCE WORKLOAD AT Holloman AFB

FY 16 FY17 FY18 FY19-23

Air Systems 1294 1617 1941 2588

Ground Systems 322 362 483 644

EW THREAT MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE WORKLOAD (hours)

Maintenance and PMIs 30

Travel Time 7

End-User Support 1

1.1.3. ACTS DEMONSTRATIONS

The following table depicts expected hours expended providing demonstrations at Holloman AFB. The table depicts total hours expended per FY. The data provided is based on information available.

DEMONSTRATION WORKLOAD at Holloman

FY18 FY19-23

Tours 15 35

Visitors 50 150

FA3002-23-R-0014, Air Combat Training System

Attachment 7

1.1.4. GOVERNMENT REQUESTED TRAVEL (TDY) WORKLOAD

The following estimated workload is based on annual government sponsored conference schedules, all of which is reimbursable.

TDY WORKLOAD

ESTIMATED ANNUAL HOURS

EW 80 hours

P5 ACTS 80 hours

Link16 80 hours

1.1.5. Required Ancillary Duties

REQUIRED ANCILLARY DUTIES

ESTIMATED ANNUAL WORKLOAD (hours)

TMDE 144

ESDS 36

Flight Line Driving 16

Building Custodian 20

Equipment Custodian 240

1.2. Luke AFB, AZ

1.2.1. ACTS OPERATIONAL WORKLOAD

The following tables depict the historical operational workload at Luke AFB.

P5 ACMI OPERATIONAL WORKLOAD AT LUKE AFB

FY15 FY16 FY19 FY20 FY21 FY22 FY23

Avg. per Year

FY19-23

Avg. per Month

FY19-23

P5 SORTIES

SCHEDULED /

FLOWN

7897 6377 6377 4342 4342 2243 1057 2803 234

RSC Non-ACMI OPERATIONAL WORKLOAD AT LUKE AFB

FY15 FY16

Avg. per

Year Avg. per Month

JTE, UMTE & Smokey SAM

Missions

341 380 361 30

Manned Range Scoring Missions 1703 1433 1568 131

Link 16 Missions 56 258 157 14

FA3002-23-R-0014, Air Combat Training System

Attachment 7

SNAKEYE OPERATIONAL WORKLOAD AT LUKE AFB Reference LAFBI 13-212 for hours of operation of manned range activity

Estimated Annual Hours

Estimated Operations (Without weekend flying) 12,528

ACTS SYSTEMS DEMONSTRATION WORKLOAD

FY15 FY16 Avg. per Year Avg. per Month

DEMONSTRATION HOURS 10 11 10 1

1.2.2. Secure Facility and Equipment Management Workload

The following table outlines the monthly workload for cryptographic (COMSEC) materials and equipment necessary to support the requirements of all ACTS equipment.

ACTS SYSTEMS SECURITY WORKLOAD

Annual Estimate (hours)

Training 72

Maintenance & Load of Cryptographic Equipment 500

Pick-up and transportation of Cryptographic Material 84

Information Assurance Related System Updates 174

1.2.3. MANNED RANGES OPERATIONAL WORKLOAD Reference LAFBI 13-212 for hours of operation of manned range activity.

RCO Workload Manned Range

Tasks

FY16 RANGE TOTALS (hours) FY 16

Total

(hours) R1 R2 R3 R4

Operational Control of Range 1853 1800 267 928 4848

Daily Equipment Startup, Operational Check, Range Set-Up

189 198 32 103 522

Travel Time 378 198 32 206 814

FA3002-23-R-0014, Air Combat Training System

Attachment 7

1.2.4. Required Ancillary Duties

REQUIRED ANCILLARY DUTIES

ESTIMATED ANNUAL WORKLOAD (hours)

TMDE 40

TODO & ESDS 24

Flight Line Driving 36

Building Custodian 15

Scheduling 3000

Job Control 250

Equipment Custodian 250

1.2.5. MAINTENANCE WORKLOAD

The following estimated workload is based on normal scheduled maintenance. NOTE: Unscheduled maintenance varies widely, dependent primarily on usage of the equipment and climatic conditions (i.e., lightning strikes, heat, etc.)

EW THREAT MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE WORKLOAD (hours)

Maintenance and PMIs 60

Travel Time 60

End User Support 40

GILA BEND AFAF COMM MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE WORKLOAD (hours)

Maintenance and PMIs 40

Travel Time 20

End-User Support 2

RANGE 1 COMM MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE (hours)

PMIs 9

Travel Time 3

RANGE 2 COMM MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE (hours)

PMIs 9

Travel Time 2

RANGE 3 COMM MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE (hours)

PMIs 9

Travel Time 2

FA3002-23-R-0014, Air Combat Training System

Attachment 7

AIR COMBAT TRAINING SYSTEM

APPENDIX 6 TO ATTACHMENT 1 – Historical Workload Estimates

RANGE 4 COMM MAINTENANCE

ESTIMATED MONTHLY MAINTENANCE (hours)

PMIs 9

Travel Time 3

P5 ACTS MAINTENANCE WORKLOAD

ESTIMATED MONTHLY MAINTENANCE (hours)

FY19 FY20 FY21 FY22 FY22

Air Systems 717 229 229 111 6

Ground Systems 8 8 8 8 8

1.2.6. GOVERNMENT REQUESTED TRAVEL (TDY) WORKLOAD

The following estimated workload is based on annual government sponsored conference schedules, all of which is reimbursable.

TDY WORKLOAD

ESTIMATED ANNUAL HOURS

EW 80 hours

P5 ACTS 80 hours

Link16 80 hours

File details come from the government source that posted it. Updated .