AETC_AOI_3_DODIDNOW_FINAL_(31_MAY_19).pdf
PDF 85 KB Posted
- Attached to
- FY19 AETC_Commercial Solutions Opening (CSO)_update Federal contract opportunity
- Solicitation number
- FA3002-19-S-C001
- Issued by
- Department of the Air Force
About this file
Update Submission due date from 1 June 2109 to 16 June 2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AETC_AOI_A06_T-38C_Digital_Model_V2.pdf | ||
| AETC_AOI_A06_T-38C_Digital_Model.pdf | ||
| AETC_AOI_5_Competency_Mapping.pdf | ||
| AETC_AOI_4_-_Wing_Feedback_App.pdf | ||
| AETC_AOI_3_DODIDNOW_FINAL_(15_MAY_19).pdf | ||
| AETC_AoI_A02_GPS_Degraded_Training.pdf | ||
| AETC_AOI_A01_Project_NEXUS_(Final).pdf | ||
| AETC_AOI_A01_Project_NEXUS_(Final).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AETC_AREA OF INTEREST (AOI_03): Project DoD ID NOW
31 May 2019/JMS
1. General Information
1.1 AoI Background
The ID-Card Section supports all personnel that require an ID card for access to installations, care, and amenities. An application would give a majority of their customers an easily accessible submission avenue to renew, replace, reset, report, and issue their DoD identification cards (not for the physical CAC/ID card, only the processes to obtain one). The process for issuing military identification cards is redundant, antiquated and inefficient. On the average, individuals wait up to 60 days for face-to-face appointments, and two (2) or more hours for walk-in assistance with ID renewals and replacements. For new ID card issuances, it can take more than one visit to complete. Individuals who are in remote locations must travel for face-to-face assistance to an ID card office on an installation. The distance, long wait times, and inconvenient appointments impedes the mission and is an encumbrance to workflow and manpower. With this desired solution, Active Duty Military (to include Inactive Reservists and National Guard), Military Dependents, Retirees, and Civilians should be able to carry out their CAC/Teslin “Laminated” ID card request quicker and more efficiently.
Solutions Briefs must demonstrate a uniquely tailored process or approach to successfully complete development and design of the project that can connect with Mil Connect and DEERS. Proposed commercial solutions should be able to run on multiple platforms; including but not limited to mobile devices (iOS, Android, etc…), web browsers, etc… Solutions meeting Phase 1 selection criteria may be invited to Phase 2 to provide a Pitch. Solutions meeting Phase 2 selection criteria may receive an invitation to Phase 3 and receive a Request for Prototype Proposal (RPP).
The Mobile Application project will be provided to AoI participants invited to participate in a Phase 3 - Request for Prototype Proposal (RPP). NOTE: The Government reserves the right to forgo Phase 2 and go directly to Phase 3.
All, some, or none of the participating companies will be selected to prototype the solution. The prototype must result in the successful completion of a simulated military identification card request being generated with some form of mobile use of the prototype.
Upon completion of the contract, the solution will be provided a final performance evaluation based on technical/performance merits. The government reserves the right to contract production of the selected solution and will be made based on the availability of government funds.
2. AoI Constraints
1. A solution will be developed with the capability of gathering required information/documentation and ordering of a DoD identification card receipt via mail or in-person visit to a desired Military Personnel Flight (MPF). This must interface (via secure APIs) with DoD systems including DEERS and Mil Connect.
a. Modern web browser (Chrome, Explorer, Firefox, etc…).
b. Mobile Application compatibility (iOS, Android, etc…).
c. End user must be able to self-service with/without being at each MPF location.
2. The solution shall describe the proposed approach to completing the prototype.
a. Air Fore subject matter experts will be available for consulting during development.
b. Simulated non-classified Air Force data will be available.
c. Visualization, distribution, and support of solution should be explained.
3. Pricing Strategy
a. Contractor will be issued a firm-fixed price award for the prototype.
b. Government will provide APIs for existing mentioned systems.
4. Other
a. Company shall be ready to execute within 10-15 working days of contract award.
b. Target date for contract award is 01 July 2019 and may be subject to change.
3. PHASE 1 – Solution Brief Submission Requirements
3.1 Submission Requirements
Written solution briefs must be sent via e-mail submission by 11:59 P.M. (CDT) on 1 JUNE 2019, with subject line stating “#DoDIDNOW SOLUTION BRIEF” to CSO.questions@gmail.com. Solution briefs received after the specified due date and time will be discarded and not be evaluated by the Government.
3.2 Written Solution Brief Requirements
3.2.1 Content of Solution Brief
The written Solution Briefs should not exceed five (5) single page written pages (Solution briefs can be double sided, but cannot exceed two double sided pages, and one single sides page) using 12-point font or, alternatively, Solution Briefs may take the form of briefing slides which should not exceed fifteen (15) slides unless otherwise stated on the subject AoI. Any pages or slides submitted beyond this limitation will be removed and not evaluated.
The written solution brief shall include and/or address the following:
3.2.1.1 Title Page (does not count against page limit)
● At a minimum, please include company name, DUNS and CAGE Code, solution name, solicitation number, date of submission, point of contact name, email address, phone number, and company address. This page will not count towards the page/slide limitation.
3.2.1.3. Executive Summary/Company Description
● Describe your commercial customer base and provide some examples of past contracts or sales of this service/solution from within the last two years.
● Describe your company – e.g. How long has it been in operation? Where is it located and headquartered, multiple locations, sales/R&D in U.S. and other countries? Number of current employees? Is your firm actively registered with www.SAM.gov or in process of being registered?
● Describe the management team – e.g. Who are they? What is their background and history and qualifications (previous startups, etc.)?
● Include other relevant corporate information, as applicable.
3.2.1.2. Solution/Technology Concept
● Describe the unique aspects of your technology/solution and the proposed work as it relates to this published AoI. Identify whether the effort includes the pilot or demonstration of existing commercial technology (identified as commercially ready and viable technology), or the development of a new technology or process to training/learning.
3.2.1.3 Company Viability
● Provide a brief overview of the company. Provide a summary of current fundraising to date and/or a summary of the top line (gross sales/revenues) and balance sheet. Provide a summary of product commercialization and go-to-market strategy.
4. Evaluation of Phase 1 – Solution Briefs
4.1 General
The Solution Brief shall be evaluated against the published AETC CSO evaluation criteria.
The general AETC CSO https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cvie w=1 Phase 1 evaluation criteria shall be used to evaluate and rate the proposed solution brief. The AETC CSO evaluation criteria are listed below in order of importance from top to bottom. If a solution brief does not meet the first or second evaluation criterion, the solution brief will not be further considered for Phase 2- Pitch Presentation. Upon conclusion of this round of Solution Brief evaluations, the Government will select solutions(s) to further develop and submit a detailed pitch presentation NOTE: The Government reserves the right to forgo Phase 2 and go directly to Phase 3.
5. Evaluation of Phase 2 - Pitch
5.1 General
The Pitch presentation shall be evaluated against the published AETC CSO evaluation criteria.
The general AETC CSO Phase 2 evaluation criteria shall be used to evaluate and rate the proposed pitch presentation.
The AETC CSO https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cvie w=1 evaluation criteria are listed in order of importance from top to bottom. If a pitch does not meet the first or second evaluation criterion, the solution brief will not be further considered for Phase 3- Request for Prototype Proposal (RPP). NOTE: The Government reserves the right to forgo Phase 2 and go directly to Phase 3.
6. Evaluation of Phase 3 - RPP
6.1 General
Upon conclusion of evaluation of the pitch presentations, the Government will select and invite those AoI participants meeting the Phase II criteria to further develop and submit a detailed technical and price proposals. The proposal shall consist of a title page and two parts:
● Volume 1: Technical Proposal
● Volume 2: Price Volume
The submitted proposal shall be evaluated against the published AETC CSO evaluation criteria.
The general AETC CSO https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cvi ew=1 Phase 3 evaluation criteria shall be used to evaluate and rate the Phase 3 proposal submittal. The AETC CSO evaluation criteria are listed in order of importance from top to bottom. If a proposal does not meet any of the first 3 proposal adequacy items in AETC CSO Section 3.4 (items 1-3) basis of evaluation, the proposal will be disqualified from a Phase 3 award. If AETC decides to pursue a prototype OT, then the proposal must meet the proposal adequacy items in AETC CSO Section 3.4 (items 4-8) basis of evaluation to be considered. If not, that proposal will be disqualified from a Phase 3 award.
6.1.1. In addition to the AETC CSO Phase 3 Basis of Evaluation, the following factor will also be used to evaluate and rate Phase 3 Basis of Evaluation (item 1).
a. Application digital design quality, innovative methodologies to accomplish set goal, ease of consumer use, capstone approach and management plan, and company’s past performance and credentials.
6.2 Technical Proposal Solution (Volume One)
Each selected AoI participant invited to Phase 3 must submit a technical proposal solution as part of their final proposal that identifies the work to be performed and the deliverables. Provide a detailed project schedule that outlines the various phases of required learning objectives within the stipulated period of performance. The AoI participant must provide a technical volume that includes a Statement of Proposed Work (SOPW) with the https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 https://www.fbo.gov/index?s=opportunity&mode=form&id=538f662154e57ca1d8a7ee773089cb00&tab=core&_cview=1 following tabbed sections:
● Section 1 - Background
● Section 2 – Planned objectives, timelines, and milestone schedule
● Section 3 - Approach to solution completion
● Section 4 - Tools and software applicable to develop and provide desired solution
● Section 5 - Period and place of performance
● Section 6 - Proposed direct and ancillary hardware/software required for execution
● Section 7 – Application, implementation, recommendation, and post implementation support plan
Please Note: The proposals must identify any proprietary information or associated intellectual property.
6.3 Price Volume (Part Two)
6.3.1. In addition to the instructions found in AETC CSO Section 3.4, Price Proposal, this AoI requires the following:
a. Basic Period: The offeror shall submit Price Volume with a firm-fixed price proposal roll-up to successfully implement and complete the proposed prototype. Breakdown of labor, materials and other than direct costs (ODC) shall be submitted. Within the price volume include price per operating platform (iOS, Android, etc… if applicable), and price breakdown for each major feature for this contract. Price per operating system and features shall be inclusive of all required labor, equipment, material and software for a turnkey solution.
b. Option Price to Scale:: The offeror shall also submit a priced, firm-fixed price Option(s), for expansion of the prototype solution to support all AETC ID Card holders.
(Option price must assume scaling program to accommodate 100 initial test subjects. Eventually up to 100,000 JBSA users)l)
7. AoI Open Period – This AoI shall close at 11:59 P.M.; 16 JUNE 2019
8. Point of contact
AoI questions can be sent to:
Program Manager: SMSgt Gregory Morris gregory.morris.2@us.af.mil
Contracting Specialist: Capt Jessica Steinhoff jessica.steinhoff@us.af.mil
**Companies are advised that any Prototype Other Transaction Agreement (OTA) awarded in response to this
Area of Interest may result in the award of a follow-on production contract or transaction without the use of competitive procedures. The follow-on production contact or transaction will be available for use by one or more organizations in the Department of Defense and, as a result, the magnitude of the follow-on production contract or agreement could be significantly larger than that of the prototype OTA. As such, any Prototype
Other Transaction Agreement will include the following statement relative to the potential for follow-on production: "In accordance with 10 U.S.C. 2371b(f), and upon a determination that the prototype project for this transaction has been successfully completed, this competitively awarded prototype OTA may result in the award of a follow-on production contract or transaction without the use of competitive procedures mailto:gregory.morris.2@us.af.mil
| 1. General Information |
| 2. AoI Constraints |
| 3. PHASE 1 – Solution Brief Submission Requirements |
| 3.2 Written Solution Brief Requirements |
| 3.2.1.1 Title Page (does not count against page limit) |
| 3.2.1.3. Executive Summary/Company Description |
| 3.2.1.2. Solution/Technology Concept |
| 3.2.1.3 Company Viability |
| 4. Evaluation of Phase 1 – Solution Briefs |
| 5. Evaluation of Phase 2 - Pitch |
| 6. Evaluation of Phase 3 - RPP |
| 6.2 Technical Proposal Solution (Volume One) |
| 6.3 Price Volume (Part Two) |
| 8. Point of contact |
File details come from the government source that posted it.