DRFP_-FA3002-13-R-0011_13_Aug_14.pdf
PDF 2 MB Posted
- Attached to
- Vance AFB Base Operations Support Federal contract opportunity
- Solicitation number
- FA3002-13-R-0011
About this file
Draft RFP FA3002-13-R-0011
View the file
Other files for this federal contract opportunity
Show all 50
Vance AFB Base Operations Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local t ime
X
A X B
C D
EX
X G F 200 - 203
204 - 216 X H 217 - 225
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 246
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA3002 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 144
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
145 - 150
151 - 167 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 168 - 170 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 171 - 182 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
183 - 198
PART II - CO NTRACT CLAUSES
338 SCONS/PKC(GLORIA M. MARSHALL)
2021 FIRST STREET WEST
JBSA RANDOLPH TX 78150-4302
210-652-7998
210-652-3445FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
08 Aug 2013
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA3002-13-R-0011
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 10 Months O&M (Sustainment)
FFP
Provide professional inspection, maintenance, repair, operations, and minor alterations. (PWS Section 11-1 Para 11.1.2.2. except 11.1.2.2.1.2., 11.1.2.2.1.3., 11.1.2.2.2.1., 11.1.2.2.2.1.5., 11.1.2.2.2.2., 11.1.2.2.4.5. and 11.1.2.2.4.6.)
Period of Performance - 1 Dec 15 - 30 Sep 16
FOB: Destination
SIGNAL CODE: C
NET AMT
0002 10 Months Electrical Distribution System
FFP
Maintain, repair, replace, and operate the electrical distributions, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0003 10 Months Water Distribution
FFP
Maintain, repair, replace, and operate the water distribution and water store tank systems, fire hydrants, real property, accountable RPIE, and associated non- RPIE items. (PWS Section 11-1 Para11.1.2.2.2.1.3.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0004 10 Months Gas Distribution
FFP
Maintain, repair, replace, and operate the gas distribution system, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.4.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0005 10 Months Engineering (Sustainment)
FFP
Manage and provide portfolio optimization. (PWS Section 12-1 except Para 12.1.2.1., 12.1.2.2.6. and 12.1.2.3.4.3.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0006 10 Months Operations Management
FFP
Manage and perform all activities and function related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. (PWS Section 11-1 Para 11.1.2.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0007 10 Months Water (Chilled Water)
FFP
Maintain, repair, and operate the chilled water system. (PWS Section 11-1 Para 11.1.2.2.2.1.5.3.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0008 10 Months Sewer/Waste Water System
FFP
Maintain, repair replace and operate the sewer/WW collection/treatment systems, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0009 10 Months Energy & Utility Management
FFP
Manage all activities and functions related to leading, managing and directing the people and resources dedicated to performing utility and energy management activities. (PWS Section 12-1 Para 12.1.2.2.6.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0010 10 Months Pest Control (Entomology)
FFP
Provide pest control activities. (PWS Section 11-1 Para 11.1.2.2.2.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0011 10 Months Grounds
FFP
Manage and perform grounds maintenance IAW Technical Library Grounds Folder/Vance AFB GM PWS. (PWS Section 11-1 Para 11.1.2.2.1.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0012 10 Months Pavement Clearance
FFP
Provide removal of debris, snow, and ice. (PWS Section 11-1 Para 11.1.2.2.1.3.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0013 10 Months Custodial Services
FFP
Manage and perform custodial services IAW Technical Library Vance AFB Custodial PWS. (PWS Section 11-1 Para 11.1.2.2.4.5.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0014 10 Months
ISWM
FFP
Manage and perform ISWM IAW Technical Library Vance AFB ISWM (Refuse- Recycling) PWS (PWS Section11-1 Para 11.1.2.2.4.6.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0015 10 Months
IGI&S (GEOBASE)
FFP
Manage, collect, maintain, analyze, and display geo-referenced data to support the installation mission. (PWS Section 12-1 Para 12.1.2.3.4.3.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0016 10 Months Installation Engineering Mgmt
FFP
Provide a dedicated CE director. (PWS Section 12-1 Para 12.1.2.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0017 10 Months Real Estate/Real Property
FFP
Provide real estate/real property management and accountability support for all DoD and AF real property under the control of the installation. (PWS Section 10-1 Para 10.1.2.2., 10.1.2.2.1., 10.1.2.6. and 10.1.2.6.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0018 10 Months Fire Emergency Services Mgmt
FFP
Establish and maintain FES programs to ensure the protection of Vance AFB community, personnel, property and the environment, while ensuring firefighter safety. (PWS Section 18-1 Para 18.1.2.1. and 18.1.2.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0019 10 Months Fire Emergency Services Operations
FFP
Respond with appropriate personnel and equipment to all fires, fire alarms, aircraft incidents, automobile accidents, hazardous material incidents, rescues, and miscellaneous fires/emergency situations. (PWS Section 18-1 Para 18.1.2.3. and 18.1.2.5.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0020 10 Months Kegelman AAF
FFP
AAF Delegated Airfield Management Duties (PWS Section 18-1 Para 18.1.2.6.)
A3 Funded
Period of Performance - 1 Dec 15 - 30 Sep 16
0021 10 Months Fire Prevention
FFP
Implement all fire prevention program elements. (PWS Section 18-1 Para 18.1.2.4.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0022 10 Months Family Housing Management
FFP
Provide program management and offer referral services and a full range of relocation assistance. (PWS Section 10-1 Para 10.1.2.6.3. and 10.1.2.4.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
Reserved
0024 10 Months Furnishing Management Office (FMO)
FFP
Management and perform all activities and functions related to leading, managing, and directing people and resources dedicated to performing FMO activities. (PWS Section 10-1 Para 10.1.2.4.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0025 10 Months Environmental
FFP
Manage and provide oversight to ensure compliance, conservation, and pollution prevention. (PWS Section 10-1 Para 10.1.2.5. and 10.1.2.6.2.)
Period of Performance - 1 Dec 15 - 30 Sep 16
Reserved
0027 10 Months CE Financial Management Resources
FFP
Provide Financial Management and support to CE activities. (PWS Section 10-1 Para 10.1.2.1.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0028 10 Months Supply
Provide a broad range of supplies, equipment, mobility bag, clothing, weapons and other materials required in support of the 71 FTW, associated units, and DoD agencies located in the local area. (PWS Section 23-1) INFO CLIN
0029 10 Months Asset Management Program
FFP
IAW PWS Section 23-1, Para 23.1.2.1.
Period of Performance - 1 Dec 15 - 30 Sep 16
0030 10 Months Individual Protective Equipment
FFP
IAW PWS Section 23-1, Para 23.1.2.1.4.
Period of Performance - 1 Dec 15 - 30 Sep 16
0031 10 Months Individual Equipment Function
FFP
IAW PWS Section 23-1, Para 23.1.2.1.5.
Period of Performance - 1 Dec 15 - 30 Sep 16
0032 10 Months Customer Support Program
FFP
IAW PWS Section 23-1, Para 23.1.2.2.
Period of Performance - 1 Dec 15 - 30 Sep 16
0033 10 Months Computer/Systems Operations Program
FFP
IAW PWS Section 23-1, Para 23.1.3.
Period of Performance - 1 Dec 15 - 30 Sep 16
0034 10 Months Comm & IT
Provide support services for telephone, land mobile radio, asset management, plans and programs, performance management, web service management, network and information security, and support services for 71 FTW and authorized users with their IT operations requirements IAW their host-tenant support agreements. (PWS Section 7-1) INFO CLIN
0035 10 Months Basewide Comm & IT Services
FFP
IAW PWS Section 7-1 Para 7.1. except Para 7.1.2.10.1. and 7.1.2.10.2.
Period of Performance - 1 Dec 15 - 30 Sep 16
0036 10 Months Contractor Desktop Support for 71 OG and FOS
FFP
IAW PWS Section 7-1, Para 7.1.2.10.2.
Period of Performance - 1 Dec 15 - 30 Sep 16
0037 10 Months
CIVIL ENGINEERING (CE) COMPUTER SYSTEMS
ADMINISTRATION/FUNCTIONAL SYSTEM ADMINISTRATION SUPPORT
FFP
IAW PWS Section 7-1, Para 7.1.2.10.1.
Period of Performance - 1 Dec 15 - 30 Sep 16
0038 10 Months Visual Information Services
FFP
Provide graphics, photography and video imaging services. (PWS Section 8-1)
Period of Performance - 1 Dec 15 - 30 Sep 16
0039 10 Months Publishing Management
FFP
Provide the administration of the Publications and Forms Management Programs.
(PWS Section 9-1)
Period of Performance - 1 Dec 15 - 30 Sep 16
0040 10 Months Transportation
Provide transportation services which include passenger processing and transportation, cargo movement, vehicle fleet management and maintenance of Vance AFB vehicles. (PWS Section 25-1) INFO CLIN
0041 10 Months Cargo Transportation
FFP
IAW PWS Section 25-1, Para 25.1.2.
Period of Performance - 1 Dec 15 - 30 Sep 16
0042 10 Months Passenger Processing and Transportation
FFP
IAW PWS Section 25-1, Para 25.1.3.
Period of Performance - 1 Dec 15 - 30 Sep 16
0043 10 Months Vehicle Management and Maintenance Support
FFP
IAW PWS Section 25-1, Para 25.1.4.
Period of Performance - 1 Dec 15 - 30 Sep 16
0044 10 Months Community Services
FFP
Provide and promote a broad range of core and enhanced programs and services include Community Services (PWS Section 28-1 Para 28.1.2.3., 28.1.3. and 28.1.18.)
Period of Performance - 1 Dec 15 - 30 Sep 16
0045 10 Months Library
FFP
IAW PWS Section 28-1 Para 28.1.7.
Period of Performance - 1 Dec 15 - 30 Sep 16
0046 10 Months Fitness Center
FFP
IAW PWS Section 28-1 Para 28.1.6.
Period of Performance - 1 Dec 15 - 30 Sep 16
0047 10 Months Outdoor Rec
FFP
IAW PWS Section 28-1 Para 28.1.15. and 28.1.16.
Period of Performance - 1 Dec 15 - 30 Sep 16
0048 10 Months Child &Youth Programs
FFP
IAW PWS Section 28-1 Para 28.1.8.
Period of Performance - 1 Dec 15 - 30 Sep 16
0049 10 Months Child Dev Center & Family Child Care
FFP
IAW PWS Section 28-1 Para 28.1.9.
Period of Performance - 1 Dec 15 - 30 Sep 16
0050 10 Months Youth Center
FFP
IAW PWS Section 28-1 Para 28.1.11. and 28.1.12.
Period of Performance - 1 Dec 15 - 30 Sep 16
0051 10 Months Teen Program
FFP
IAW PWS Section 28-1 Para 28.1.13.
Period of Performance - 1 Dec 15 - 30 Sep 16
0052 10 Months Purchasing
FFP
Purchase and manage all supplies, services and construction (excluding MILCON) as determined by the Government, and necessary for performance of BOS activities. (PWS Section 26-1)
Period of Performance - 1 Dec 15 - 30 Sep 16
0053 Lot Funded Travel/Per Diem
COST
Furnish costs for travel, per diem and fees for conferences, seminars, classes, etc.
as approved by the CO (PWS Section 2-1 Para 2.1.2.1.2.4.) Cost Reimbursable.
Not - To - Exceed (NTE) $58,000.00
Period of Performance - 1 Dec 15 - 30 Sep 16
ESTIMATED COST
0054 Lot Unfunded Local Purchase
COST
This item will be funded by the ACO as needed IAW the procedures in PWS Section 26-1. Cost Reimbursable.
Period of Performance - 1 Dec 15 - 30 Sep 16
0055 Lot Unfunded Wing Non-recurring Services
COST
Perform non-recurring tasks IAW with Special Contract Requirements Section H-
6. Cost Reimbursable.
Period of Performance - 1 Dec 15 - 30 Sep 16
0056 Lot Unfunded Weekend/Holiday Flying Support
COST
Provide base airfield support IAW Special Contract Requirements Section H-15 and PWS Section 2-1 Paragraph 2.1.2.1.2.3.
Period of Performance - 1 Dec 15 - 30 Sep 16
0057 Lot Over and Above
COST
CE Routine DSW and Planned Work IAW Special Contract Requirements Section
H-16. NTE
Period of Performance - 1 Dec 15 - 30 Sep 16
0058 2 Months Mobilization - FFP
FFP
Execute the changeover plan as proposed and negotiated (PWS Section 2-1 Para 2.1.18.)
Period of Performance - 1 Oct 15 - 30 Nov 15
1001 12 Months OPTION O&M (Sustainment)
FFP
Provide professional inspection, maintenance, repair, operations, and minor alterations. (PWS Section 11-1 Para 11.1.2.2. except 11.1.2.2.1.2., 11.1.2.2.1.3., 11.1.2.2.2.1., 11.1.2.2.2.1.5., 11.1.2.2.2.2., 11.1.2.2.4.5. and 11.1.2.2.4.6.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1002 12 Months OPTION Electrical Distribution System
FFP
Maintain, repair, replace, and operate the electrical distributions, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1003 12 Months OPTION Water Distribution
FFP
Maintain, repair, replace, and operate the water distribution and water store tank systems, fire hydrants, real property, accountable RPIE, and associated non- RPIE items. (PWS Section 11-1 Para11.1.2.2.2.1.3.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1004 12 Months OPTION Gas Distribution
FFP
Maintain, repair, replace, and operate the gas distribution system, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.4.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1005 12 Months OPTION Engineering (Sustainment)
FFP
Manage and provide portfolio optimization. (PWS Section 12-1 except Para 12.1.2.1., 12.1.2.2.6. and 12.1.2.3.4.3.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1006 12 Months OPTION Operations Management
FFP
Manage and perform all activities and function related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. (PWS Section 11-1 Para 11.1.2.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1007 12 Months OPTION Water (Chilled Water)
FFP
Maintain, repair, and operate the chilled water system. (PWS Section 11-1 Para 11.1.2.2.2.1.5.3.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1008 12 Months OPTION Sewer/Waste Water System
FFP
Maintain, repair replace and operate the sewer/WW collection/treatment systems, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.2.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1009 12 Months OPTION Energy & Utility Management
FFP
Manage all activities and functions related to leading, managing and directing the people and resources dedicated to performing utility and energy management activities. (PWS Section 12-1 Para 12.1.2.2.6.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1010 12 Months OPTION Pest Control (Entomology)
FFP
Provide pest control activities. (PWS Section 11-1 Para 11.1.2.2.2.2.)
1011 12 Months OPTION Grounds
FFP
1012 12 Months OPTION Pavement Clearance
FFP
Provide removal of debris, snow, and ice. (PWS Section 11-1 Para 11.1.2.2.1.3.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1013 12 Months OPTION Custodial Services
FFP
Manage and perform custodial services IAW Technical Library Vance AFB Custodial PWS. (PWS Section 11-1 Para 11.1.2.2.4.5.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1014 12 Months
OPTION ISWM
FFP
Manage and perform ISWIM IAW Technical Library Vance AFB ISWM (Refuse- Recycling PWS (PWS Section 11-1 para 11.1.2.2.4.6.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1015 12 Months
OPTION IGI&S (GEOBASE)
FFP
Manage, collect, maintain, analyze, and display geo-referenced data to support the installation mission. (PWS Section 12-1 Para 12.1.2.3.4.3.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1016 12 Months OPTION Installation Engineering Mgmt
FFP
Provide a dedicated CE director. (PWS Section 12-1 Para 12.1.2.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1017 12 Months OPTION Real Estate/Real Property
FFP
Provide real estate/real property management and accountability support for all DoD and AF real property under the control of the installation. (PWS Section 10-1 Para 10.1.2.2., 10.1.2.2.1., 10.1.2.6. and 10.1.2.6.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1018 12 Months OPTION Fire Emergency Services Mgmt
FFP
Establish and maintain FES programs to ensure the protection of Vance AFB community, personnel, property and the environment, while ensuring firefighter safety. (PWS Section 18-1 Para 18.1.2.1. and 18.1.2.2.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1019 12 Months OPTION Fire Emergency Services Operations
FFP
Respond with appropriate personnel and equipment to all fires, fire alarms, aircraft incidents, automobile accidents, hazardous material incidents, rescues, and miscellaneous fires/emergency situations. (PWS Section 18-1 Para 18.1.2.3. and 18.1.2.5.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1020 12 Months OPTION Kegelman AAF
FFP
AAF Delegated Airfield Management Duties (PWS Section 18-1 Para 18.1.2.6.)
A3 Funded
Period of Performance - 1 Oct 16 - 30 Sep 17
1021 12 Months OPTION Fire Prevention
FFP
Implement all fire prevention program elements. (PWS Section 18-1 Para 18.1.2.4.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1022 12 Months OPTION Family Housing Management
FFP
Provide program management and offer referral services and a full range of relocation assistance. (PWS Section 10-1 Para 10.1.2.6.3. and 10.1.2.4.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
OPTION RESERVED
1024 12 Months OPTION Furnishing Management Office (FMO)
FFP
Management and perform all activities and functions related to leading, managing, and directing people and resources dedicated to performing FMO activities. (PWS Section 10-1 Para 10.1.2.4.2.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1025 12 Months OPTION Environmental
FFP
Manage and provide oversight to ensure compliance, conservation, and pollution prevention. (PWS Section 10-1 Para 10.1.2.5. and 10.1.2.6.2.)
Period of Performance - 1 Oct 16 - 30 Sep 17
OPTION Reserved
1027 12 Months OPTION CE Financial Management Resources
FFP
Provide Financial Management and support to CE activities. (PWS Section 10-1 Para 10.1.2.1.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1028 12 Months OPTION Supply
Provide a broad range of supplies, equipment, mobility bag, clothing, weapons and
1029 12 Months OPTION Asset Management Program
FFP
IAW PWS Section 23-1, Para 23.1.2.1.
Period of Performance - 1 Oct 16 - 30 Sep 17
1030 12 Months OPTION Individual Protective Equipment
FFP
IAW PWS Section 23-1, Para 23.1.2.1.4.
Period of Performance – 1 Oct 16 - 30 Sep 17
1031 12 Months OPTION Individual Equipment Function
FFP
IAW PWS Section 23-1, Para 23.1.2.1.5.
Period of Performance – 1 Oct 16 - 30 Sep 17
1032 12 Months OPTION Customer Support Program
FFP
IAW PWS Section 23-1, Para 23.1.2.2.
Period of Performance – 1 Oct 16 - 30 Sep 17
1033 12 Months OPTION Computer/Systems Operations Program
FFP
IAW PWS Section 23-1, Para 23.1.3.
Period of Performance – 1 Oct 16 - 30 Sep 17
1034 12 Months OPTION Comm & IT
Provide Base support services for telephone, land mobile radio, asset management, plans and programs, performance management, web service management, network and information security, and support services for 71 FTW and authorized users with their IT operations requirements IAW their host-tenant support agreements(PWS Section 7-1) INFO CLIN
1035 12 Months OPTION Basewide Comm & IT Services
FFP
IAW PWS Section 7-1 Para 7.1 except Para 7.1.2.10.1. and 7.1.2.10.2.
Period of Performance – 1 Oct 16 - 30 Sep 17
1036 12 Months OPTION Contractor Desktop Support for 71 OG and FOS
FFP
IAW PWS Section 7-1 Para 7.1.2.10.2.
Period of Performance – 1 Oct 16 - 30 Sep 17
1037 12 Months
OPTION CIVIL ENGINEERING (CE) COMPUTER SYSTEMS
ADMINISTRATION/FUNCTIONAL SYSTEM ADMINISTRATION SUPPORT
FFP
IAW Section 7-1, Para 7.1.2.10.1.
Period of Performance – 1 Oct 16 - 30 Sep 17
1038 12 Months OPTION Visual Information Services
FFP
Provide graphics, photography and video imaging services. (PWS Section 8-1)
Period of Performance – 1 Oct 16 – 30 Sep 17
1039 12 Months OPTION Publishing Management
FFP
Provide the administration of the Publications and Forms Management Programs.
(PWS Section 9-1)
Period of Performance - 1 Oct 16 - 30 Sep 17
1040 12 Months OPTION Transportation
FFP
Provide transportation services which include passenger processing and transportation, cargo movement, vehicle fleet management and maintenance of Vance AFB vehicles. (PWS Section 25-1) INFO CLIN
Period of Performance - 1 Oct 16 - 30 Sep 17
1041 12 Months OPTION Cargo Transportation
FFP
IAW PWS Section 25-1, Para 25.1.2.
Period of Performance – 1 Oct 16 - 30 Sep 17
1042 12 Months OPTION Passenger Processing and Transportation
FFP
IAW PWS Section 25-1, Para 25.1.3.
Period of Performance – 1 Oct 16 - 30 Sep 17
1043 12 Months OPTION Vehicle Management and Maintenance Support
FFP
IAW PWS Section 25-1, Para 25.1.4.
Period of Performance – 1 Oct 16 - 30 Sep 17
1044 12 Months OPTION Community Services
FFP
Provide and promote a broad range of core and enhanced programs and services include Community Services (PWS Section 28-1 Para 28.1.2.3., 28.1.3. and 28.1.18.)
Period of Performance - 1 Oct 16 - 30 Sep 17
1045 12 Months OPTION Library
FFP
IAW PWS Section 28-1 Para 28.1.7.
Period of Performance - 1 Oct 16 - 30 Sep 17
1046 12 Months OPTION Fitness Center
FFP
IAW PWS Section 28-1 Para 28.1.6.
Period of Performance – 1 Oct 16 - 30 Sep 17
1047 12 Months OPTION Outdoor Rec
FFP
IAW PWS Section 28-1 Para 28.1.15. and 28.1.16.
Period of Performance – 1 Oct 16 - 30 Sep 17
1048 12 Months OPTION Child &Youth Programs - FFP
FFP
IAW PWS Section 28-1 Para 28.1.8.
Period of Performance – 1 Oct 16 - 30 Sep 17
1049 12 Months OPTION Child Dev Center & Family Child Care
FFP
IAW PWS Section 28-1 Para 28.1.9.
Period of Performance – 1 Oct 16 - 30 Sep 17
1050 12 Months OPTION Youth Center
FFP
IAW PWS Section 28-1 Para 28.1.11. and 28.1.12.
Period of Performance – 1 Oct 16 - 30 Sep 17
1051 12 Months OPTION Teen Program
FFP
IAW PWS Section 28-1 Para 28.1.13.
Period of Performance – 1 Oct 16 - 30 Sep 17
1052 12 Months OPTION Purchasing
FFP
Purchase and manage all supplies, services and construction (excluding MILCON) as determined by the Government, and necessary for performance of BOS activities. (PWS Section 26-1)
Period of Performance - 1 Oct 16 - 30 Sep 17
1053 Lot OPTION Funded Travel/Per Diem
COST
Furnish costs for travel, per diem and fees for conferences, seminars, classes, etc.
as approved by the CO (PWS Section 2-1 Para 2.1.2.1.2.4.) Cost Reimbursable.
Not - To - Exceed (NTE) $58,000.00
Period of Performance - 1 Oct 16 - 30 Sep 17
1054 Lot OPTION Unfunded Local Purchase
COST
This item will be funded by the ACO as needed IAW the procedures in PWS Section 26-1. Cost Reimbursable.
Period of Performance - 1 Oct 16 - 30 Sep 17
1055 Lot OPTION Unfunded Wing Non-recurring Svcs
COST
Perform non-recurring tasks IAW with Special Contract Requirements Section H-
6. Cost Reimbursable.
Period of Performance - 1 Oct 16 - 30 Sep 17
1056 Lot OPTION Unfunded Weekend/Holiday Flying Support
COST
Provide base airfield support IAW Special Contract Requirements Section H-15 and PWS Section 2-1 Paragraph 2.1.2.1.2.3.
Period of Performance - 1 Oct 16 - 30 Sep 17
1057 Lot OPTION Over and Above
COST
CE Routine DSW and Planned Work IAW Special Contract Requirements Section
H-16. NTE
Period of Performance – 1 Oct 16 - 30 Sep 17
2001 12 Months OPTION O&M (Sustainment)
FFP
Provide professional inspection, maintenance, repair, operations, and minor alterations. (PWS Section 11-1 Para 11.1.2.2. except 11.1.2.2.1.2., 11.1.2.2.1.3., 11.1.2.2.2.1., 11.1.2.2.2.1.5., 11.1.2.2.2.2., 11.1.2.2.4.5. and 11.1.2.2.4.6.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2002 12 Months OPTION Electrical Distribution System
FFP
Maintain, repair, replace, and operate the electrical distributions, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.1.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2003 12 Months OPTION Water Distribution
FFP
Maintain, repair, replace, and operate the water distribution and water store tank systems, fire hydrants, real property, accountable RPIE, and associated non- RPIE items. (PWS Section 11-1 Para11.1.2.2.2.1.3.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2004 12 Months OPTION Gas Distribution
FFP
Maintain, repair, replace, and operate the gas distribution system, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.4.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2005 12 Months OPTION Engineering (Sustainment)
FFP
Manage and provide portfolio optimization. (PWS Section 12-1 except Para 12.1.2.1., 12.1.2.2.6. and 12.1.2.3.4.3.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2006 12 Months OPTION Operations Management
FFP
Manage and perform all activities and function related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. (PWS Section 11-1 Para 11.1.2.1.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2007 12 Months OPTION Water (Chilled Water)
FFP
Maintain, repair, and operate the chilled water system (PWS Section 11-1 Para 11.1.2.2.2.1.5.3.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2008 12 Months OPTION Sewer/Waste Water System
FFP
Maintain, repair replace and operate the sewer/WW collection/treatment systems, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.2.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2009 12 Months OPTION Energy & Utility Management
FFP
Manage all activities and functions related to leading, managing and directing the people and resources dedicated to performing utility and energy management activities. (PWS Section 12-1 Para 12.1.2.2.6.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2010 12 Months OPTION Pest Control (Entomology)
FFP
Provide pest control activities. (PWS Section 11-1 Para 11.1.2.2.2.2.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2011 12 Months OPTION Grounds
FFP
Period of Performance - 1 Oct 17 – 30 Sep 18
2012 12 Months OPTION Pavement Clearance
FFP
Provide removal of debris, snow, and ice. (PWS Section 11-1 Para 11.1.2.2.1.3.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2013 12 Months OPTION Custodial Services
FFP
Manage and perform custodial services IAW Technical Library Vance AFB Custodial PWS. (PWS Section 11-1 Para 11.1.2.2.4.5.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2014 12 Months
OPTION ISWM
FFP
Manage and perform ISWM IAW Technical Library Vance AFB ISWM (Refuse- Recycling) PWS. (PWS Section 11-1 para 11.1.2.2.4.6.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2015 12 Months
OPTION IGI&S (GEOBASE)
FFP
Manage, collect, maintain, analyze, and display geo-referenced data to support the installation mission. (PWS Section 12-1 Para 12.1.2.3.4.3.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2016 12 Months OPTION Installation Engineering Mgmt
FFP
Provide a dedicated CE director. (PWS Section 12-1 Para 12.1.2.1.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2017 12 Months OPTION Real Estate/Real Property
FFP
Provide real estate/real property management and accountability support for all DoD and AF real property under the control of the installation. (PWS Section 10-1 Para 10.1.2.2. and 10.1.2.2.1.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2018 12 Months OPTION Fire Emergency Services Mgmt
FFP
Establish and maintain FES programs to ensure the protection of Vance AFB community, personnel, property and the environment, while ensuring firefighter safety. (PWS Section 18-1 Para 18.1.2.1. and 18.1.2.2.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2019 12 Months OPTION Fire Emergency Services Operations
FFP
Respond with appropriate personnel and equipment to all fires, fire alarms, aircraft incidents, automobile accidents, hazardous material incidents, rescues, and miscellaneous fires/emergency situations. (PWS Section 18-1 Para 18.1.2.3. and 18.1.2.5.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2020 12 Months OPTION Kegelman AAF
FFP
AAF Delegated Airfield Management Duties (PWS Section 18-1 Para 18.1.2.6.)
A3 Funded
Period of Performance - 1 Oct 17 – 30 Sep 18
2021 12 Months OPTION Fire Prevention
FFP
Implement all fire prevention program elements. (PWS Section 18-1 Para 18.1.2.4.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2022 12 Months OPTION Family Housing Management
FFP
Provide program management and offer referral services and a full range of relocation assistance. (PWS Section 10-1 Para 10.1.2.6.3. and 10.1.2.4.1.)
Period of Performance -1 Oct 17 – 30 Sep 18
2024 12 Months OPTION Furnishing Management Office (FMO)
FFP
Management and perform all activities and functions related to leading, managing, and directing people and resources dedicated to performing FMO activities. (PWS Section 10-1 Para 10.1.2.4.2.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2025 12 Months OPTION Environmental
FFP
Manage and provide oversight to ensure compliance, conservation, and pollution prevention. (PWS Section 10-1 Para 10.1.2.5. and 10.1.2.6.2.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2027 12 Months OPTION CE Financial Management Resources
FFP
Provide Financial Management and support to CE activities. (PWS Section 10-1 Para 10.1.2.1.)
Period of Performance - 1 Oct 17 – 30 Sep 18
2028 12 Months OPTION Supply
Provide a broad range of supplies, equipment, mobility bag, clothing, weapons and
2029 12 Months OPTION Asset Management Program
FFP
IAW PWS Section 23-1, Para 23.1.2.1.
Period of Performance – 1 Oct 17 – 30 Sep 18
2030 12 Months OPTION Individual Protective Equipment
FFP
IAW PWS Section 23-1, Para 23.1.2.1.4.
Period of Performance – 1 Oct 17 – 30 Sep 18
2031 12 Months OPTION Individual Equipment Function
FFP
IAW PWS Section 23-1, Para 23.1.2.1.5.
Period of Performance – 1 Oct 17 – 30 Sep 18
2032 12 Months OPTION Customer Support Program
FFP
IAW PWS Section 23-1, Para 23.1.2.2.
Period of Performance – 1 Oct 17 – 30 Sep 18
2033 12 Months OPTION Computer/Systems Operations Program
FFP
IAW PWS Section 23-1, Para 23.1.3.
Period of Performance – 1 Oct 17 – 30 Sep 18
2034 12 Months OPTION Comm & IT
Provide support services for telephone, land mobile radio, asset management, plans and programs, performance management, web service management, network and information security, and support services for 71 FTW and authorized users with
2035 12 Months OPTION Basewide Comm & IT Services
FFP
IAW PWS Section 7-1 Para 7.1 except Para 7.1.2.10.1. and 7.1.2.10.2.
Period of Performance – 1 Oct 17 – 30 Sep 18
2036 12 Months OPTION Contractor Desktop Support for 71 OG and FOS
FFP
IAW PWS Section 7-1, Para 7.1.2.10.2.
Period of Performance – 1 Oct 17 – 30 Sep 18
2037 12 Months
OPTION CIVIL ENGINEERING (CE) COMPUTER SYSTEMS
ADMINISTRATION/FUNCTIONAL SYSTEM ADMINISTRATION SUPPORT
FFP
IAW Section 7-1, Para 7.1.2.10.1.
Period of Performance – 1 Oct 17 – 30 Sep 18
2038 12 Months OPTION Visual Information Services
FFP
Provide graphics, photography and video imaging services. (PWS Section 8-1)
Period of Performance - 1 Oct 17 – 30 Sep 18
2039 12 Months OPTION Publishing Management
FFP
Provide the administration of the Publications and Forms Management Programs.
(PWS Section 9-1)
Period of Performance – 1 Oct 17 – 30 Sep 18
2040 12 Months OPTION Transportation
FFP
Provide transportation services which include passenger processing and
2041 12 Months OPTION Cargo Transportation
FFP
IAW PWS Section 25-1, Para 25.1.2.
Period of Performance - 1 Oct 17 – 30 Sep 18
2042 12 Months OPTION Passenger Processing and Transportation
FFP
IAW PWS Section 25-1, Para 25.1.3.
Period of Performance - 1 Oct 17 – 30 Sep 18
2043 12 Months OPTION Vehicle Management and Maintenance Support
FFP
IAW PWS Section 25-1, Para 25.1.4.
Period of Performance - 1 Oct 17 – 30 Sep 18
2044 12 Months OPTION Community Services
FFP
Provide and promote a broad range of core and enhanced programs and services include Community Services (PWS Section 28-1 Para 28.1.2.3., 28.1.3. and 28.1.18.)
Period of Performance – 1 Oct 17 – 30 Sep 18
2045 12 Months OPTION Library
FFP
IAW PWS Section 28-1 Para 28.1.7.
Period of Performance - 1 Oct 17 – 30 Sep 18
2046 12 Months OPTION Fitness Center
FFP
IAW PWS Section 28-1 Para 28.1.6.
Period of Performance - 1 Oct 17 – 30 Sep 18
2047 12 Months OPTION Outdoor Rec
FFP
IAW PWS Section 28-1 Para 28.1.15. and 28.1.16.
Period of Performance - 1 Oct 17 – 30 Sep 18
2048 12 Months OPTION Child &Youth Programs - FFP
FFP
IAW PWS Section 28-1 Para 28.1.8.
Period of Performance - 1 Oct 17 – 30 Sep 18
2049 12 Months OPTION Child Dev Center & Family Child Care
FFP
IAW PWS Section 28-1 Para 28.1.9.
Period of Performance - 1 Oct 17 – 30 Sep 18
2050 12 Months OPTION Youth Center
FFP
IAW PWS Section 28-1 Para 28.1.11. and 28.1.12.
Period of Performance - 1 Oct 17 – 30 Sep 18
2051 12 Months OPTION Teen Program
FFP
IAW PWS Section 28-1 Para 28.1.13.
Period of Performance - 1 Oct 17 – 30 Sep 18
2052 12 Months OPTION Purchasing
FFP
Purchase and manage all supplies, services and construction (excluding MILCON) as determined by the Government, and necessary for performance of BOS activities. (PWS Section 26-1)
Period of Performance – 1 Oct 17 – 30 Sep 18
2053 Lot OPTION Funded Travel/Per Diem
COST
Furnish costs for travel, per diem and fees for conferences, seminars, classes, etc.
as approved by the CO (PWS Section 2-1 Para 2.1.2.1.2.4.) Cost Reimbursable.
Not - To - Exceed (NTE) $58,000.00
Period of Performance – 1 Oct 17 – 30 Sep 18
2054 Lot OPTION Unfunded Local Purchase
COST
This item will be funded by the ACO as needed IAW the procedures in PWS Section 26-1. Cost Reimbursable.
Period of Performance – 1 Oct 17 – 30 Sep 18
2055 Lot OPTION Unfunded Wing Nonrecurring Services
COST
Perform non-recurring tasks IAW with Special Contract Requirements Section H-
6. Cost Reimbursable.
Period of Performance – 1 Oct 17 – 30 Sep 18
2056 Lot OPTION Unfunded Weekend/Holiday Flying Support
COST
Provide base airfield support IAW Special Contract Requirements Section H-15 and PWS Section 2-1 Paragraph 2.1.2.1.2.3.
Period of Performance – 1 Oct 17 – 30 Sep 18
2057 Lot OPTION Over and Above
COST
CE Routine DSW and Planned Work IAW Special Contract Requirements Section
H-16. NTE.
Period of Performance - 1 Oct 17 – 30 Sep 18
3001 12 Months OPTION O&M (Sustainment)
FFP
Provide professional inspection, maintenance, repair, operations, and minor alterations. (PWS Section 11-1 Para 11.1.2.2. except 11.1.2.2.1.2., 11.1.2.2.1.3., 11.1.2.2.2.1., 11.1.2.2.2.1.5., 11.1.2.2.2.2., 11.1.2.2.4.5. and 11.1.2.2.4.6.)
Period of Performance - 1 Oct 18 - 30 Sep 19
3002 12 Months OPTION Electrical Distribution System
FFP
Maintain, repair, replace, and operate the electrical distributions, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3003 12 Months OPTION Water Distribution
FFP
Maintain, repair, replace, and operate the water distribution and water store tank systems, fire hydrants, real property, accountable RPIE, and associated non- RPIE items. (PWS Section 11-1 Para11.1.2.2.2.1.3.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3004 12 Months OPTION Gas Distribution
FFP
Maintain, repair, replace, and operate the gas distribution system, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.4.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3005 12 Months OPTION Engineering (Sustainment)
FFP
Manage and provide portfolio optimization. (PWS Section 12-1 execpt Para 12.1.2.1., 12.1.2.2.6. and 12.1.2.3.4.3.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3006 12 Months OPTION Operations Management
FFP
Manage and perform all activities and function related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. (PWS Section 11-1 Para 11.1.2.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3007 12 Months OPTION Water (Chilled Water)
FFP
Maintain, repair, and operate the chilled water system. (PWS Section 11-1 Para 11.1.2.2.2.1.5.3.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3008 12 Months OPTION Sewer/Waste Water System
FFP
Maintain, repair replace and operate the sewer/WW collection/treatment systems, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.2.)
Period of Performance - 1 Oct 18 - 30 Sep 19
3009 12 Months OPTION Energy & Utility Management
FFP
Manage all activities and functions related to leading, managing and directing the people and resources dedicated to performing utility and energy management activities. (PWS Section 12-1 Para 12.1.2.2.6.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3010 12 Months OPTION Pest Control (Entomology)
FFP
Provide pest control activities. (PWS Section 11-1 Para 11.1.2.2.2.2.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3011 12 Months OPTION Grounds
FFP
Manage and perform grounds maintenance IAW Technical Library Grounds Folder/Vance AFB GM PWS. (PWS Section 11-1 Para 11.1.2.2.1.2.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3012 12 Months OPTION Pavement Clearance
FFP
Provide removal of debris, snow, and ice. (PWS Section 11-1 Para 11.1.2.2.1.3.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3013 12 Months OPTION Custodial Services
FFP
Manage and perform custodial services IAW Technical Library Vance AFB Custodial PWS. (PWS Section 11-1 Para 11.1.2.2.4.5.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3014 12 Months
OPTION ISWM
FFP
Manage and perform ISWM IAW Technical Library Vance AFB ISWM (Refuse- Recycling) PWS (PWS Section 11-1 Para 11.1.2.2.4.6.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3015 12 Months
OPTION IGI&S (GEOBASE)
FFP
Manage, collect, maintain, analyze, and display geo-referenced data to support the installation mission. (PWS Section 12-1 Para 12.1.2.3.4.3.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3016 12 Months OPTION Installation Engineering Mgmt
FFP
Provide a dedicated CE director. (PWS Section 12-1 Para 12.1.2.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3017 12 Months OPTION Real Estate/Real Property
FFP
Provide real estate/real property management and accountability support for all DoD and AF real property under the control of the installation. (PWS Section 10-1 Para 10.1.2.2., 10.1.2.2.1., 10.1.2.6., and 10.1.2.6.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3018 12 Months OPTION Fire Emergency Services Mgmt
FFP
Establish and maintain FES programs to ensure the protection of Vance AFB community, personnel, property and the environment, while ensuring firefighter safety. (PWS Section 18-1 Para 18.1.2.1. and 18.1.2.2.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3019 12 Months OPTION Fire Emergency Services Operations
FFP
Respond with appropriate personnel and equipment to all fires, fire alarms, aircraft incidents, automobile accidents, hazardous material incidents, rescues, and miscellaneous fires/emergency situations. (PWS Section 18-1 Para 18.1.2.3. and 18.1.2.5.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3020 12 Months OPTION Kegelman AAF
FFP
AAF Delegated Airfield Management Duties (PWS Section 18-1 Para 18.1.2.6.)
A3 Funded
Period of Performance – 1 Oct 18 – 30 Sep 19
3021 12 Months OPTION Fire Prevention
FFP
Implement all fire prevention program elements. (PWS Section 18-1 Para 18.1.2.4.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3022 12 Months OPTION Family Housing Management
FFP
Provide program management and offer referral services and a full range of relocation assistance. (PWS Section 10-1 Para 10.1.2.6.3. and 10.1.2.4.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
OPTION RESERVED
3024 12 Months OPTION Furnishing Management Office (FMO)
FFP
Management and perform all activities and functions related to leading, managing, and directing people and resources dedicated to performing FMO activities. (PWS Section 10-1 Para 10.1.2.4.2.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3025 12 Months OPTION Environmental
FFP
Manage and provide oversight to ensure compliance, conservation, and pollution prevention. (PWS Section 10-1 Para 10.1.2.5. and 10.1.2.6.2.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3027 12 Months OPTION CE Financial Management Resources
FFP
Provide Financial Management and support to CE activities. (PWS Section 10-1 Para 10.1.2.1.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3028 12 Months OPTION Supply
Provide a broad range of supplies, equipment, mobility bag, clothing, weapons and
3029 12 Months OPTION Asset Management Program
FFP
IAW PWS Section 23-1, Para 23.1.2.1.
Period of Performance – 1 Oct 18 – 30 Sep 19
3030 12 Months OPTION Individual Protective Equipment
FFP
IAW PWS Section 23-1, Para 23.1.2.1.4.
Period of Performance – 1 Oct 18 – 30 Sep 19
3031 12 Months OPTION Individual Equipment Function
FFP
IAW PWS Section 23-1, Para 23.1.2.1.5.
Period of Performance – 1 Oct 18 – 30 Sep 19
3032 12 Months OPTION Customer Support Program
FFP
IAW PWS Section 23-1, Para 23.1.2.2.
Period of Performance – 1 Oct 18 – 30 Sep 19
3033 12 Months OPTION Computer/Systems Operations Program
FFP
IAW PWS Section 23-1, Para 23.1.3.
Period of Performance – 1 Oct 18 – 30 Sep 19
3034 12 Months OPTION Comm & IT
Provide support services for telephone, land mobile radio, asset management, plans and programs, performance management, web service management, network and information security, and support services for 71 FTW and authorized users with
3035 12 Months OPTION Basewide Comm & IT Services
FFP
IAW PWS Section 7-1 Para 7.1 except Para 7.1.2.10.1 and 7.1.2.10.2.
Period of Performance – 1 Oct 18 – 30 Sep 19
3036 12 Months OPTION Contractor Desktop Support for 71 OG and FOS
FFP
IAW PWS Section 7-1, Para 7.1.2.10.2.
Period of Performance – 1 Oct 18 – 30 Sep 19
3037 12 Months
OPTION CIVIL ENGINEERING (CE) COMPUTER SYSTEMS
ADMINISTRATION/FUNCTIONAL SYSTEM ADMINISTRATION SUPPORT
FFP
IAW PWS Section 7-1 Para 7.1.2.10.1.
Period of Performance – 1 Oct 18 – 30 Sep 19
3038 12 Months OPTION Visual Information Services
FFP
Provide graphics, photography and video imaging services. (PWS Section 8-1)
Period of Performance – 1 Oct 18 – 30 Sep 19
3039 12 Months OPTION Publishing Management
FFP
Provide the administration of the Publications and Forms Management Programs.
(PWS Section 9-1)
Period of Performance – 1 Oct 18 – 30 Sep 19
3040 12 Months OPTION Transportation
Provide transportation services which include passenger processing and
3041 12 Months OPTION Cargo Transportation
FFP
IAW PWS Section 25-1, Para 25.1.2.
Period of Performance – 1 Oct 18 – 30 Sep 19
3042 12 Months OPTION Passenger Processing and Transportation
FFP
IAW PWS Section 25-1, Para 25.1.3.
Period of Performance – 1 Oct 18 – 30 Sep 19
3043 12 Months OPTION Vehicle Management and Maintenance Support
FFP
IAW PWS Section 25-1, Para 25.1.4.
Period of Performance – 1 Oct 18 – 30 Sep 19
3044 12 Months OPTION Community Services
FFP
Provide and promote a broad range of core and enhanced programs and services include Community Services (PWS Section 28-1 Para 28.1.2.3., 28.1.3. and 28.1.18.)
Period of Performance – 1 Oct 18 – 30 Sep 19
3045 12 Months OPTION Library
FFP
IAW PWS Section 28-1 Para 28.1.7.
Period of Performance – 1 Oct 18 – 30 Sep 19
3046 12 Months OPTION Fitness Center
FFP
IAW PWS Section 28-1 Para 28.1.6.
Period of Performance – 1 Oct 18 – 30 Sep 19
3047 12 Months OPTION Outdoor Rec
FFP
IAW PWS Section 28-1 Para 28.1.15. and 28.1.16.
Period of Performance – 1 Oct 18 – 30 Sep 19
3048 12 Months OPTION Child &Youth Programs
FFP
IAW PWS Section 28-1 Para 28.1.8.
Period of Performance – 1 Oct 18 – 30 Sep 19
3049 12 Months OPTION Child Dev Center & Family Child Care
FFP
IAW PWS 28-1 Para 28.1.9.
Period of Performance – 1 Oct 18 – 30 Sep 19
3050 12 Months OPTION Youth Center
FFP
IAW PWS 28-1 Para 28.1.11. and 28.1.12.
Period of Performance – 1 Oct 18 – 30 Sep 19
3051 12 Months OPTION Teen Program
FFP
IAW PWS Section 28-1 Para 28.1.13.
Period of Performance – 1 Oct 18 – 30 Sep 19
3052 12 Months OPTION Purchasing
FFP
Purchase and manage all supplies, services and construction (excluding MILCON) as determined by the Government, and necessary for performance of BOS activities. (PWS Section 26-1)
Period of Performance – 1 Oct 18 – 30 Sep 19
3053 Lot OPTION Funded Travel/Per Diem
COST
Furnish costs for travel, per diem and fees for conferences, seminars, classes, etc.
as approved by the CO (PWS Section 2-1 Para 2.1.2.1.2.4.) Cost Reimbursable.
Not - To - Exceed (NTE) $58,000.00.
Period of Performance – 1 Oct 18 – 30 Sep 19
3054 Lot OPTION Unfunded Local Purchase
COST
This item will be funded by the ACO as needed IAW the procedures in PWS Section 26-1. Cost Reimbursable.
Period of Performance – 1 Oct 18 – 30 Sep 19
3055 Lot OPTION Unfunded Wing Non-recurring Services
COST
Perform non-recurring tasks IAW with Special Contract Requirements Section H-
6. Cost Reimbursable.
Period of Performance – 1 Oct 18 – 30 Sep 19
3056 Lot OPTION Unfunded Weekend/Holiday Flying Support
COST
Provide base airfield support IAW Special Contract Requirements Section H-15 and PWS Section 2-1 Paragraph 2.1.2.1.2.3.
Period of Performance – 1 Oct 18 – 30 Sep 19
3057 Lot OPTION Over and Above
COST
CE Routine DSW and Planned Work IAW Special Contract Requirements Section
H-16. NTE
Period of Performance - 1 Oct 18 – 30 Sep 19
4001 12 Months OPTION O&M (Sustainment)
FFP
Provide professional inspection, maintenance, repair, operations, and minor alterations. (PWS Section 11-1 Para 11.1.2.2. except 11.1.2.2.1.2., 11.1.2.2.1.3., 11.1.2.2.2.1., 11.1.2.2.2.1.5., 11.1.2.2.2.2., 11.1.2.2.4.5. and 11.1.2.2.4.6.)
Period of Performance - 1 Oct 19 - 30 Sep 20
4002 12 Months OPTION Electrical Distribution System
FFP
Maintain, repair, replace, and operate the electrical distributions, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.1.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4003 12 Months OPTION Water Distribution
FFP
Maintain, repair, replace, and operate the water distribution and water store tank systems, fire hydrants, real property, accountable RPIE, and associated non- RPIE items. (PWS Section 11-1 Para11.1.2.2.2.1.3.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4004 12 Months OPTION Gas Distribution
FFP
Maintain, repair, replace, and operate the gas distribution system, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.4.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4005 12 Months OPTION Engineering (Sustainment)
FFP
Manage and provide portfolio optimization. (PWS Section 12-1 execpt Para 12.1.2.1., 12.1.2.2.6. and 12.1.2.3.4.3.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4006 12 Months OPTION Operations Management
FFP
Manage and perform all activities and function related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. (PWS Section 11-1 Para 11.1.2.1.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4007 12 Months OPTION Water (Chilled Water)
FFP
Maintain, repair, and operate the chilled water system (PWS Section 11-1 Para 11.1.2.2.2.1.5.3.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4008 12 Months OPTION Sewer/Waste Water System
FFP
Maintain, repair replace and operate the sewer/WW collection/treatment systems, real property, accountable RPIE, and associated non-RPIE items. (PWS Section 11-1 Para 11.1.2.2.2.1.2.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4009 12 Months OPTION Energy & Utility Management
FFP
Manage all activities and functions related to leading, managing and directing the people and resources dedicated to performing utility and energy management activities. (PWS Section 12-1 Para 12.1.2.2.6.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4010 12 Months OPTION Pest Control (Entomology)
FFP
Provide pest control activities. (PWS Section 11-1 Para 11.1.2.2.2.2.)
Period of Performance – 1 Oct 19 – 30 Sep 20
4011 12 Months OPTION Grounds
FFP
Manage and perform grounds maintenance IAW Technical Library Grounds…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .