Draft Section L Instruction to Offerors

View the file

Other files

File Type Posted
CHANGE TO Q A —
AFI 13-212 Luke Sup 1.pdf PDF
CHANGE TO Q A —
QUESTIONS AND ANSWERS —
QUESTIONS AND ANSWERS —
Appendix 7 Rev 24 May 10.docx DOCX document
Appendix 4 Rev 24 May 10.docx DOCX document
RFP Amendment 002.doc DOC document
Appendix 5 Rev 25 May 10.docx DOCX document
Amend 001 Attach 3 - Attachment 8 to RFP - Gila Bend CBA —
Amend 001 Attach 1 - Page 1 and 34 of RFP Replacement.pdf PDF
Amend 001.doc DOC document
Amend 001 Attach 2 - Appendix 4 —
Appendix 4 8 Mar 10.docx DOCX document
Appendix 7 8 Mar 10.docx DOCX document
Attachment 5.3 —
Appendix 6 8 Mar 10.docx DOCX document
Attachment 5.4 WD 2005-3007 Rev 9.txt TXT text file
Appendix 1 8 Mar 10.docx DOCX document
Appendix 8 8 Mar 10.docx DOCX document
Attachment 5.2 WD 2005-2023 Rev11 —
Appendix 5 8 Mar 10.docx DOCX document
Attachment 4 - Small Business Subcontracting Checklist.docx DOCX document
Appendix 9 8 Mar 10.docx DOCX document
ACTS PWS —
RFP —
Attachment 5.1 Luke CBA —
Attachment 6 - DD 254.pdf PDF
Attachment 3 - Past and Present Performance Questionnaire.docx DOCX document
Attachment 7 - Site Visit Security Form.pdf PDF
Appendix 2 26 Apr 10.docx DOCX document
Appendix 3 8 Mar 10.docx DOCX document
Attachment 2 - Past Performance Info Sheet.doc DOC document
Attachment 5.3 —
Draft Schedule B.doc DOC document
SSP Attachment 5 - Section M.docx DOCX document
ACTS Industry Q A.docx DOCX document
Industry Question Format.doc DOC document
Appendix 6 28 Jan 10.docx DOCX document
Appendix 9 26 Jan 10.docx DOCX document
Appendix 5 26 Jan 10.docx DOCX document
Appendix 4 25 Jan 10.docx DOCX document
ACTS PWS 28 Jan 10.docx DOCX document
Appendix 2 26 Jan 10.docx DOCX document
Appendix 1 26 Jan 10.docx DOCX document
Appendix 8 26 Jan 10.docx DOCX document
Appendix 3 26 Jan 10.docx DOCX document
Appendix 7 26 Jan 10.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

PROPOSAL PREPARATION INSTRUCTIONS

A. SPECIFIC INSTRUCTIONS:

1. PART I – TECHNICAL PROPOSAL: Limited to no more than 50 pages. All documents shall be prepared using Microsoft Office Suite applications. Offerors shall provide 1 original, 1 electronic copy and 5 copies of the technical proposal.

(a) Subfactor 1 - Quality Control (QC): Describe the organization’s Quality Control Process that would be employed in this effort. The plan must explain the process your company will use to develop a plan to evaluate the quality of operation and maintenance, identify, document and immediately correct deficiencies in the short term and identify and document trends resulting in corrective action and continual process improvement in terms of quality, workmanship, and customer support. Describe/ show in detail:

(i) Describe your proposed QC organization, including lines of authority, and provide a plan that will successfully evaluate compliance, find and document problems and monitor corrective actions ensuring successful and timely problem resolution. Explain how recurring problems will be prevented.

(ii) Describe your system for recording, computing and assessing performance measurement data and monitoring corrective actions to ensure successful and timely problem resolution and compliance with the PWS.

(iii) Describe your approach for continuous process improvement and innovation in terms of quality, price/cost and timeliness.

(iv) Describe your method for Trend Analysis – detail the procedures to identify negative trends, the procedures to implement corrective actions and the procedures to prevent recurrence by site and contract wide.

(v) Describe the documents and records that your company will develop, keep and use as part of the quality plan.

(vi) Describe procedures for making changes and updates to the plan.

(vii) Describe the method for gathering information, evaluating performance based on the requirements of the Performance Work Statement (PWS), and reporting the results to Government Quality Assurance Personnel (QAP).

(b) Subfactor 2 - Workforce and Organizational Structure: Describe and show a graphical representation of the operation, maintenance and logistics/administrative organizational structure for the basic contract period and all option years for each place of performance. Address and show the lines of authority, details of onsite personnel by skill mix, function and numbers. Provide the number of full-time and part time equivalents you plan to use and the rationale and calculations for this number based on the workload projections provided in the PWS. The proposed structure shall include:

(i) A complete staffing/manpower matrix that is consistent with proposed methodology and that provides Full or Part Time Equivalents sufficient to accomplish the projected workload provided in the PWS detailed to the “shop/function” level.

(ii) The number of Full Time Equivalents (FTE)/part-time, temporary staff-year equivalent hires. Provide the rationale and the calculations used to arrive at the proposed FTE level. If the proposal includes fewer FTEs than typically required given the workload projections and PWS requirements, explain how you will achieve the efficiency and still accomplish the workload provided in the PWS.

(iii) Provide detailed job qualifications to include experience, education, and supervisory responsibility for key personnel (branch level or equal and above) positions at each place of performance.

(iv) Provide the staff years programmed to be in the workforce for the basic performance period and each following contract period.

(v) If applicable, describe any teaming arrangements with subcontractors or joint ventures including the organizational relationship between the firms and the responsibilities between the prime and subcontract employees.

(vi) Provide plans for personnel certification in critical areas.

(vii) Identify “one-deep” positions on the organizational chart and explain the plan for backing up these positions.

(c) Subfactor 3 - Understanding the Requirement: Describe the overall approach and methodology for accomplishing work requirements identified in the PWS with the appropriate skills, equipment and materials. Convey the ability to have trained personnel in sufficient number at the right place and at the right time to meet the Government’s desired outcomes. Provide detailed approach to include sound innovations and efficiencies that enhance contract performance and achieve reduction in both contract and Government O&M costs.

(i) Describe an approach for scheduling work so that sufficient skills are available to meet the ACTS O&M and support requirements provided in the PWS.

(ii) Describes the procedures/plans for operations/maintenance scheduling, tracking and completing special inspections, scheduled and unscheduled maintenance while continually meeting equipment availability standards.

(iii) Describe your approach for ensuring maintenance data input and forms required in the PWS are accomplished and that the status indicated on forms and in data systems is accurate.

(d) Subfactor 4: Service Provider Training Program: Describe your company’s approach to develop a robust formal training program for operation, maintenance and personnel. Address both remedial and on-going training. The plan shall:

(i) Describe the training plan and address how you will train, qualify, and certify and maintain currency for employees prior to assuming a position and throughout the life of the contract.

(ii) Identify the position responsible for the overall contractor training program and describe his/her roles and responsibilities.

(e) Subfactor 5: Contractor Transition Plan: Describe your company’s approach that ensures successful performance on the first day of the basic performance period. The approach shall include the following information:

(i) A detailed description that addresses recruiting, training, certifying, and qualifying personnel during the 30-day Phase-In period that results in sufficient numbers of fully qualified employees by contract start date.

(ii) A graphical time-line schedule that addresses start and completion of each event (e.g., interviewing, hiring, human resource actions, training, badging and start work dates). The time-line shall address inventory for transfer of Government equipment and facilities, assumption of work, materials, acquiring GSA lease vehicles, and work procedures.

(iii) A plan that describes the GSA leased vehicles in sufficient number and type that you plan to provide for use in performance of this contract and the timeline for acquiring them.

(f) Small Business Subcontracting Plan (Separate Volume, not included against page count) - Offerors shall provide one original, one electronic copy and one hard copy.

(i) This factor is not considered as a subfactor within the Technical Volume. However, large business prime offerors shall provide a clear, detailed and realistic plan for maximizing participation in the socioeconomic programs in accordance with FAR 52.219-9(d). The proposed SB subcontracting plan must be accepted by the Contracting Officer prior to contract award. If small business subcontract possibilities do not exist or are limited, the offeror’s plan must provide rationale supporting the assertion. Current Government-wide goals for small business participation are provided for general reference only:

Small Business (SB)23% of total contract value
Small Disadvantaged Business (SDB)5% of total subcontracting dollars
Small Disadvantaged Veteran Owned SB3% of total subcontracting goals
Veteran Owned Small Business3% of total subcontracting goals
HUBZone3% of total subcontracting goals
Woman Owned Small Business5% of total subcontracting goals

Offerors should propose goals that are realistically obtainable and provide rationale for the proposed goals.

(ii) Using the AETC Small Business subcontracting checklist that is provided in Section J Attachment 4, each offeror will submit a plan that sufficiently addresses each checklist item.

2. PART II – PRICE PROPOSAL: Offerors shall provide one original, one electronic copy and two hard copies

(a) Complete blocks 13, 15, 16, 17 and 18 of the Request For Proposal (RFP) Section A, SF30. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each firm fixed price contract line item number (CLIN) including all option periods. The extended amount must equal the whole dollar unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K Representations and Certifications shall be submitted as required in the FAR provisions at 52.204-8. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(d) Statement of Compliance with the Service Contract Act - The offeror shall provide a statement that acknowledges that the prices proposed for labor covered by the service contract act were formulated using the current Collective Bargaining Agreement (CBAs) and Local Area Wage Determination (WD) that specify the labor rates and fringe benefit rates for covered contractor personnel. Offeror’s pricing proposal for each CLIN shall demonstrate a logical correlation to the staffing matrix provided in the technical proposal and the wages required in the current CBAs and WDs provided as Attachments 4 and 5 to this RFP.

(f) Submit a letter, signed at the vice-president level or equivalent or higher, that identifies the individual(s) with the authority to obligate or otherwise bind your company to the resulting contract.

(g) Financial Responsibility: In order to determine contractor responsibility, the offerors shall explain how they plan to maintain adequate financial capability for a contract of this magnitude and length. Address fiscal plan for covering unexpected or emergency situations and initial performance costs prior to recoupment in the form of monthly invoice payments. Offerors must provide complete financial statements for one fiscal year and year-to-date financial information through the last quarter available. The year-end financial statements must be certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization. If the offeror intends to rely on internally available working/operation capital, evidence of availability must be submitted. If the offeror plans to rely on financial support from other sources, identify the maximum lines of credit that may be available; include documentation to support the amounts. The maximum lines of credit must be based upon the inclusion of this contract effort.

(h) Accounting System: The resulting contract will utilize cost reimbursable CLIN’s. A contract may only be awarded to an offeror whose accounting system has been determined adequate by the Defense Contract Audit Agency (DCAA) for accumulating and reporting allowable contractor incurred costs. The offeror’s proposal shall identify the name, address and phone number of the prime and major subcontractor’s cognizant DCAA office (if known).

3. PART III – PAST PERFORMANCE INFORMATION: Offerors shall provide one original, one electronic copy and three hard copies

(a) The offeror shall submit a Past and Present Performance Volume containing the following:

(i) Summary Page describing the role of the offeror and each subcontractor, teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Information Sheets on in accordance with paragraph v.

(ii) Past Performance Information Sheets in accordance with paragraph v. below.

(iii) Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner. Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. If applicable, provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor.

(iv) Organization Structure Change History: Many companies have experienced mergers and acquisitions, reorganized their divisions, business groups, subsidiary companies and changed names. If such changes took place during the time of performance of relevant efforts or between conclusion of recent efforts, it is difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company within three years of the RFP issue date. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance.

(v) Past and Present Performance Information Sheets. Submit information on contracts (5 maximum) you consider most relevant compared to the effort described in the PWS that demonstrates your ability to perform the proposed effort. The offeror shall submit Performance Information Sheets in accordance with the format contained in Attachment 2 in Section J. This information is required on the offeror and on any subcontractors, teaming partners, and/or joint venture partners proposed to perform over 20% of the effort based on the total proposed price or who will perform aspects that the offeror considers critical to overall successful performance. Offerors should explain why a subcontractor proposed to perform less than 20% of the effort is considered critical to performance. Each relevant contract shall have been performed during the past three (3) years from the date of issuance of this solicitation and must have a minimum of six (6) months of actual performance from the date this solicitation closes. Each Past Performance Information Sheet for each contract is limited to 8 pages. The Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past and present performance.

(vi) Questionnaires. The Government will send out Past Performance Questionnaires to each of the Points of Contact (POCs) identified in the Past Performance Information Sheets. The POC will be asked to submit completed questionnaires directly to the Government. Once the Past Performance Questionnaires are completed by the POCs, the information contained therein shall be considered sensitive and shall not be released the offeror. The Contracting Officer will indicate or discuss with Offerors in the competitive range any adverse past performance information to which the offeror has not yet had an opportunity to respond. A copy of the past performance questionnaire is provided in Attachment 3 of Section J.

B. General Information/Instructions: Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP (CLINs & PWS) and government standards and regulations pertaining to the PWS.

2. Evaluation Factors for Award in Section M of this RFP.

3. Pages exceeding the page limitations or information varying from that set forth in this Section L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal Volumes I - III shall be as follows:

(a) The proposals will be on 8 1/2” x 11” paper except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.

(b) A page is defined as one face of a sheet of paper containing information.

(c) Typing shall not be less than Times New Roman or Arial, 10 fonts. Spacing shall be 1.5 or double spacing.

(d) Elaborate formats, bindings or color presentations are not desired or required.