ACTS PWS 28 Jan 10.docx

DOCX document 230 KB Posted

Attached to
Air Combat Training System (ACTS)
Solicitation number
FA3002-10-R-0009
Issued by

About this file

Final Draft Performance Work Statement (PWS)

View the file

Other files

File Type Posted
CHANGE TO Q A —
AFI 13-212 Luke Sup 1.pdf PDF
CHANGE TO Q A —
QUESTIONS AND ANSWERS —
QUESTIONS AND ANSWERS —
Appendix 7 Rev 24 May 10.docx DOCX document
Appendix 4 Rev 24 May 10.docx DOCX document
RFP Amendment 002.doc DOC document
Appendix 5 Rev 25 May 10.docx DOCX document
Amend 001 Attach 3 - Attachment 8 to RFP - Gila Bend CBA —
Amend 001 Attach 1 - Page 1 and 34 of RFP Replacement.pdf PDF
Amend 001.doc DOC document
Amend 001 Attach 2 - Appendix 4 —
Appendix 4 8 Mar 10.docx DOCX document
Appendix 7 8 Mar 10.docx DOCX document
Attachment 5.3 —
Appendix 6 8 Mar 10.docx DOCX document
Attachment 5.4 WD 2005-3007 Rev 9.txt TXT text file
Appendix 1 8 Mar 10.docx DOCX document
Appendix 8 8 Mar 10.docx DOCX document
Attachment 5.2 WD 2005-2023 Rev11 —
Appendix 5 8 Mar 10.docx DOCX document
Attachment 4 - Small Business Subcontracting Checklist.docx DOCX document
Appendix 9 8 Mar 10.docx DOCX document
ACTS PWS —
RFP —
Attachment 5.1 Luke CBA —
Attachment 6 - DD 254.pdf PDF
Attachment 3 - Past and Present Performance Questionnaire.docx DOCX document
Attachment 7 - Site Visit Security Form.pdf PDF
Appendix 2 26 Apr 10.docx DOCX document
Appendix 3 8 Mar 10.docx DOCX document
Attachment 2 - Past Performance Info Sheet.doc DOC document
Attachment 5.3 —
Draft Schedule B.doc DOC document
SSP Attachment 5 - Section M.docx DOCX document
SSP Attachment 4 - Section L.docx DOCX document
ACTS Industry Q A.docx DOCX document
Industry Question Format.doc DOC document
Appendix 6 28 Jan 10.docx DOCX document
Appendix 9 26 Jan 10.docx DOCX document
Appendix 5 26 Jan 10.docx DOCX document
Appendix 4 25 Jan 10.docx DOCX document
Appendix 2 26 Jan 10.docx DOCX document
Appendix 1 26 Jan 10.docx DOCX document
Appendix 8 26 Jan 10.docx DOCX document
Appendix 3 26 Jan 10.docx DOCX document
Appendix 7 26 Jan 10.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Combat Training System

OPERATIONS, MAINTENANCE, AND MISSION SUPPORT

PERFORMANCE WORK STATEMENT

Revised 1/28/10 JKG

AIR COMBAT TRAINING SYSTEM F41689-02-D-0044 P00030

ATTACHMENT 1 - PERFORMANCE WORK STATEMENT

i

TABLE OF CONTENTS

Section Title Page

SECTION 1 - DESCRIPTION OF SERVICES

1.1. OVERVIEW....................................................................................................................................................1
1.1.1. Scope........................................................................................................................................................1
1.1.2. Concept....................................................................................................................................................1
1.1.3. PWS Structure.........................................................................................................................................1
1.1.4. ACTS Locations.......................................................................................................................................1
1.1.5. Summary of Expectations.......................................................................................................................1
1.2. PROGRAM MANAGEMENT..................................................................................................................................2
1.2.1. General....................................................................................................................................................2
1.2.1.1. Site Managers............................................................................................................................2
1.2.1.2. Management Work Hours..........................................................................................................2
1.2.1.3. Management Controls................................................................................................................2
1.2.1.4. Government Directed Travel.....................................................................................................2
1.2.1.5. Program Management Reviews.................................................................................................3
1.2.1.6. Meeting Minutes........................................................................................................................3
1.2.1.7. Compliance................................................................................................................................3
1.2.2. Quality Control........................................................................................................................................3
1.2.2.1. General......................................................................................................................................3
1.2.2.2. Quality Control Plan.................................................................................................................3
1.2.3. Personnel.................................................................................................................................................4
1.2.3.1. General......................................................................................................................................5
1.2.3.2. COMSEC Manager....................................................................................................................5
1.2.3.3. Maintenance Personnel.............................................................................................................6
1.2.3.4. Operations Personnel................................................................................................................6
1.2.3.5. Logistics/Administrative Personnel...........................................................................................6
1.2.4. Transition.................................................................................................................................................6
1.2.4.1. Transition Period.......................................................................................................................6
1.2.4.2. Transition Period Task Responsibility.......................................................................................6
1.2.4.3. Transfer of Government Furnished Property............................................................................7
1.2.4.4. Transfer of Contract Data............................................................................................………..7
1.2.4.5. Phase-In and Transition of Contractor......................................................................................7
1.2.4.6. Phase-Out and Transition of Contractor...................................................................................7

SECTION 2 - SITE SPECIFIC PERFORMANCE: LUKE AFB, AZ.............................................................…8

2.1. OVERVIEW

2.1.1. Goals and Objectives...............................................................................................................................8
2.1.2. Employee Work Hours.............................................................................................................................8
2.1.2.1. Gila Bend AFAF Hours of Operation....................................................………………............8
2.1.2.2 Employee Overtime.....................................………………………………...…....…................8
2.2. OPERATIONS.......................................................................................................................................................8
2.2.1. General Requirements.............................................................................................................................9
2.2.2. Operations Support................................................................................................................................9
2.2.2.1. Range Operations Control Center (ROCC) Support..............................………………..........9
2.2.2.2. Manned Range Operations Support............………………………………...…....….............14
2.2.2.3. Mission Planning Support......................................................................................................21
2.2.2.4. Operations Scheduling Support..............................................................................................22
2.2.2.5. General Operations Support...................................................................................................22
2.2.3. Operations Performance......................................................................................................................23
2.2.3.1. Range Support Center.............................................................................................................23
2.2.3.1.1. Hours of Operation................................................................................................23
2.2.3.1.2. Electronic Warfare.................................................................................................23
2.2.3.1.3. Large Scale Target System (LSTSS).....................................................................24
2.2.3.1.4. Moving Target System..........................................................................................26
2.2.3.1.5. Weapon Impact Scoring System/Improved Remote Strafe Scoring System.........26
2.2.3.1.6. ACMI Control Center............................................................................................27
2.2.3.2. Communications Electronics Services....................................................................................28
2.2.3.3. Maintenance Response Times.................................................................................................29
2.2.3.4. Remote Range Unit Support...................................................................................................29
2.2.3.5. General Operations Performance............................................................................................30
2.3. LINK-16 OPERATIONS, MAINTENANCE, AND MISSION SUPPORT....................................................................30
2.3.1. Scope..........................................................................................................................................30
2.3.2. Overview....................................................................................................................................30
2.3.3. Data Link Network Management...............................................................................................31
2.3.4. Maintenance...............................................................................................................................31
2.3.5. Operations..................................................................................................................................31
2.3.6. General Requirements................................................................................................................31

2.4. HELICOPTER LOGISTICS

SECTION 3 - SITE SPECIFIC PERFORMANCE: TYNDALL AFB, FL

3.1. OVERVIEW........................................................................................................................................................32
3.1.1. Goals and Objectives.............................................................................................................................32
3.1.2. Employee Work Hours...........................................................................................................................32
3.1.2.1 Employee Overtime.....................................………………………………...…....…..............32
3.2. OPERATIONS.....................................................................................................................................................32
3.2.1. General Requirements...........................................................................................................................32
3.2.2. Operations Support...............................................................................................................................32
3.2.2.1. Operations Scheduling Support...............................................................................................33
3.2.2.2. ICADS Support.......................................................................................................................34
3.2.2.3. Communications Systems Support.........................................................................................34
3.2.2.4. Post-Activity Support..............................................................................................................34
3.2.2.5. Mission Planning Support.......................................................................................................34
3.2.2.6. General Operations Support....................................................................................................35
3.2.3. Operations Performance.......................................................................................................................35
3.2.3.1. Control and Computation/Live Monitor Operations................................................................36
3.2.3.2. Individual Combat Aircrew Debriefing System Operations....................................................36
3.2.3.3. Airborne Instrumentation Subsystem POD Operations...........................................................36
3.2.3.4. Tracking Instrumentation Subsystem/Remote Range Unit Operations...................................37

3.3. COMMUNICATIONS-ELECTRONICS SERVICES

3.4. LINK-16 OPERATIONS, MAINTENANCE, AND MISSION SUPPORT..................................................................37
3.4.1. Scope...................................................................................................................................................37
3.4.2. Overview.............................................................................................................................................37
3.4.3. Maintenance........................................................................................................................................38
3.4.4. Operations...........................................................................................................................................38
3.4.5. General Requirements.........................................................................................................................38
3.4.6. Information Protection........................................................................................................................39
3.4.7. Deliverables........................................................................................................................................39
3.4.8. Training...............................................................................................................................................39
3.4.9. Travel..................................................................................................................................................39
3.4.10. Invoicing...........................................................................................................................................39

3.5. WEAPONS DUTY OFFICIAL SUPPORT

3.6. WATERCRAFT LOGISTICS...............................................................................................................................40
3.6.1. Watercraft Operations.........................................................................................................................40
3.6.2. Watercraft Maintenance......................................................................................................................40

3.7. CARRABELLE FARM TRACTOR MAINTENANCE

SECTION 4 - SUSTAINMENT

4.1. Goal

4.2. Maintenance Support.......................................................................................................................................43
4.2.1. Scope.....................................................................................................................................................43
4.2.2. Maintenance Performance Standard....................................................................................................43
4.2.3. Maintenance Response Times...............................................................................................................43
4.2.4. Maintenance Management....................................................................................................................43
4.2.5. Maintenance Work Schedule.................................................................................................................44
4.2.6. General Maintenance Requirements.....................................................................................................44
4.2.7. Command Supported Equipment and Spares Plan...............................................................................44
4.2.8. Level of Repair......................................................................................................................................45
4.2.9. Systems Overhaul..................................................................................................................................45
4.2.10. Preventive Maintenance......................................................................................................................46
4.2.11. Corrosion Control...............................................................................................................................47
4.2.12. Damage Repair...................................................................................................................................47
4.2.13. Repairable Assets................................................................................................................................47
4.2.14. TCTO/Command Modifications..........................................................................................................47
4.2.15. Innovative Maintenance Actions.........................................................................................................48
4.2.16. Cannibalization...................................................................................................................................48
4.2.17. Maintenance Documentation..............................................................................................................48
4.2.18. TMDE.................................................................................................................................................49
4.3. Logistics.........................................................................................................................................................50
4.3.1. Scope....................................................................................................................................................50
4.3.2. General................................................................................................................................................50
4.3.3. Materiel Control..................................................................................................................................50
4.3.4. Shipping and Receiving.......................................................................................................................53
4.3.5. Equipment Inventory...........................................................................................................................54
4.3.6. Transportation.....................................................................................................................................55
4.4. TECHNICAL SUPPORT SERVICES......................................................................................................................57
4.4.1. Planning.................................................................................................................................................57
4.4.2. Project Management..............................................................................................................................58
4.4.3. Studies and Analysis..............................................................................................................................58
4.4.4. Integration, Test, and Evaluation..........................................................................................................58
4.4.5. Technical Support of ACTS OMMS.......................................................................................................58
4.4.5.1. Maintenance Support...............................................................................................................58
4.4.5.2. Failure Analysis.......................................................................................................................58
4.4.5.3. Specifications Development....................................................................................................58
4.4.5.4. Acceptance Testing..................................................................................................................58
4.4.6. Technical Support of ACTS Enhancement Projects..............................................................................59
4.4.7. Operational Engineering Support.........................................................................................................59
SECTION 5 -SERVICE SUMMARY............................................................................................................60
5.1. CONTRACTOR PROVIDED METRICS..................................................................................................................60
5.2. GOVERNMENT QUALITY ASSURANCE..............................................................................................................60
5.3. PERFORMANCE EVALUATION...........................................................................................................................60
5.4. PERFORMANCE STANDARDS.............................................................................................................................60
5.4.1. Operational Effectiveness Rate..............................................................................................................61
5.4.1.1. OER Calculation......................................................................................................................61
5.4.1.2. Example Calculation................................................................................................................61
5.4.2. Equipment Availability Rate..................................................................................................................62
5.4.2.1. EAR Calculation......................................................................................................................62
5.4.2.2. Example Calculation................................................................................................................62
5.4.3. Quality Control......................................................................................................................................64
5.4.3.1. QC Standard Calculation.........................................................................................................64
5.4.3.2. Example Calculation................................................................................................................64

SECTION 6 - GOVERNMENT FURNISHED PROPERTY AND SERVICES

6.1. GOVERNMENT FURNISHED PROPERTY AND SERVICES

6.1.1. Government Furnished Facilities..........................................................................................................66
6.1.2. Government Furnished Equipment........................................................................................................66
6.1.3. Government Furnished Materials.........................................................................................................66

6.1.4. Marking and Labeling………………………………………………………………..……………….66

6.2. GOVERNMENT FURNISHED SERVICES

6.2.1. Telephone Service..................................................................................................................................67
6.2.2. Internet Connectivity.............................................................................................................................67
6.2.3. Utilities...................................................................................................................................................67
6.2.4. Postal Services and Installation Distribution........................................................................................67
6.2.5. Security Police and Fire Protection......................................................................................................67
6.2.6. Facility Maintenance.............................................................................................................................67
6.2.7. Custodial Services.................................................................................................................................676.2.8. Refuse Collection...................................................................................................................................68
6.2.9. Tools......................................................................................................................................................68
6.2.10. Insect and Rodent Control...................................................................................................................68
6.2.11. Automated Data Processing Equipment..............................................................................................68
6.2.12. Emergency Medical Services...............................................................................................................68
6.2.12.1. Limitation of Liability..........................................................................................................68
6.2.13. Reproduction and Audiovisual Services..............................................................................................68
6.2.14. Classified Storage................................................................................................................................69
6.2.15. Land Mobile Radio Support.................................................................................................................69
6.2.15.1. LMR Maintenance Support..................................................................................................69

SECTION 7 - GENERAL REQUIREMENTS

7.1. GENERAL SERVICES..........................................................................................................................................70
7.1.1. Vegetation Control................................................................................................................................70
7.1.2. Temporary Storage................................................................................................................................70
7.2. FINANCIAL MANAGEMENT...............................................................................................................................70
7.2.1. General..................................................................................................................................................70
7.2.2. Financial Reporting...............................................................................................................................70
7.3. SECURITY..........................................................................................................................................................71
7.3.1. Security Program...................................................................................................................................71

AIR COMBAT TRAINING SYSTEM

ATTACHMENT 1 - PERFORMANCE WORK STATEMENT

7.3.2. Personnel Security Clearances

iv

7.3.3. Access Control.......................................................................................................................................727.3.4. Intrusion Detection Systems..............................................................................................................….72
7.3.5. Security Incidents Involving Classified..................................................................................................72
7.3.6. Key and Lock Control............................................................................................................................72
7.3.6.1. Key Use, Loss and Duplication..............................................................................................72
7.3.6.2. Lock Combinations................................................................................................................73
7.4. INFORMATION PROTECTION..............................................................................................................................73
7.4.1. General Requirements...........................................................................................................................73
7.4.2. Information Systems Security.................................................................................................................73
7.4.2.1. Computer Systems Security Officer.......................................................................................73
7.4.3. Communications Security......................................................................................................................74
7.4.4. Reporting COMSEC Insecurity.............................................................................................................74
7.5. SAFETY.............................................................................................................................................................74
7.5.1. General..................................................................................................................................................74
7.5.2. Safety Inspections..................................................................................................................................74
7.5.3. Incident Reporting.................................................................................................................................75
7.6. ENVIRONMENTAL.............................................................................................................................................75
7.6.1. Environmental Management..................................................................................................................75
7.6.2. Environmental Publications..................................................................................................................75
7.6.3. Environmental Release..........................................................................................................................75
7.6.4. Hazardous Waste Management Plan.....................................................................................................76
7.6.5. Environmental and Real Estate Permitting...........................................................................................76
7.6.6. Environmental Compliance Assessment and Management Program....................................................76
7.6.7. Training Requirements..........................................................................................................................77
7.6.8. Spill Prevention Contingency and Countermeasures Plan....................................................................77
7.6.9. Hazardous Materials.............................................................................................................................77
7.7. FACILITIES, STRUCTURES, AND SHELTERS........................................................................................................77
7.7.1. Maintenance...........................................................................................................................................77
7.7.2. Facility Management.............................................................................................................................77
7.8. PUBLICATIONS..................................................................................................................................................78
7.8.1. Technical Libraries................................................................................................................................78

AIR COMBAT TRAINING SYSTEM

ATTACHMENT 1 - PERFORMANCE WORK STATEMENT

7.8.1.1. Requirements

v

7.9. EXTERNAL AGENCIES.......................................................................................................................................79
7.9.1. External Agency Support.......................................................................................................................79
7.10. DATA MANAGEMENT.....................................................................................................................................79
7.10.1. General Requirements.........................................................................................................................79
7.10.2. Repository............................................................................................................................................80
7.11. TRAINING........................................................................................................................................................80
7.11.1. Familiarization Training.....................................................................................................................80
7.11.2. Customer Support................................................................................................................................80
7.11.2.1. ACTS Overview...................................................................................................................80
7.11.2.2. Personal Instruction..............................................................................................................81
7.11.2.3. Written Procedures...............................................................................................................81
7.11.2.4. General Assistance...............................................................................................................81

7.12. TOURS AND DEMONSTRATIONS

7.13. CONFIGURATION MANAGEMENT....................................................................................................................81
7.13.1. ACTS Hardware and Software Configuration.....................................................................................81
7.13.2. ACTS Physical Configuration..............................................................................................................82

7.14. CUSTODIAL SERVICES

7.15. STRIKE PLAN…………………………………………………………………………………………..……83

7.15.1. Government Performance of Service During Strikes/Non-Performance……………………………83

7.16. ORGANIZATIONAL CONFLICT OF INTEREST

7.18.1. General

7.18.2. Inclusions

7.18.3. Exclusions

7.17. NON-INTERFERENCE

TABLES

TABLE 1-1 - ACTS LOCATIONS

TABLE 4-1 - TRANSPORTATION OF ACTS EQUIPMENT..........................................................................................57
TABLE 5-1 - SERVICE DELIVERY SUMMARY..........................................................................................................60

APPENDICES

APPENDIX 1................................................................................................................DEFINITIONS AND ABBREVIATIONS APPENDIX 2................................................................................................................................................PUBLICATIONS APPENDIX 3.........................................................................................................SITES, LOCATIONS and MAJOR SYSTEMS APPENDIX 4...........................................................................................................GOVERNMENT FURNISHED PROPERTY APPENDIX 5.............................................................................GOVERNMENT FURNISHED FACILITIES AND STRUCTURES APPENDIX 6............................................................................................................................WORKLOAD INFORMATION APPENDIX 7......................................................……………………………........REPORTS, PLANS AND APPOINTMENTS APPENDIX 8.............................................................................................GOVERNMENT FURNISHED SERVICES MATRIX APPENDIX 9.........................................................................................................................ADDITIONAL INFORMATION vi

REQUIRED APPOINTMENTS, PLANS, AND REPORTS

APPOINTMENT 1: SITE MANAGERS AND ALTERNATES.............................................................................................2
APPOINTMENT 2: COMSEC MANAGER AND ALTERNATE........................................................................................6
APPOINTMENT 3: MATERIEL CONTROL MANAGERS...............................................................................................51
APPOINTMENT 4: ASSET ACCOUNT CUSTODIANS...................................................................................................51
APPOINTMENT 5: ADPE CUSTODIAN......................................................................................................................68
APPOINTMENT 6: COMPUTER SYSTEMS SECURITY OFFICER...................................................................................73
APPOINTMENT 7: FACILITY MANAGER....................................................................................................................77
APPOINTMENT 8: LIBRARY CUSTODIANS................................................................................................................79
PLAN 1: QUALITY CONTROL PLAN..........................................................................................................................4
PLAN 2: PHASE-IN PLAN..........................................................................................................................................7
PLAN 3: PHASE-OUT PLAN.......................................................................................................................................7
PLAN 4: COMMAND SUPPORTED EQUIPMENT AND SPARES MANAGEMENT PLAN..................................................44
PLAN 5: LOCAL WORKCARDS.................................................................................................................................46
PLAN 6: TRANSPORTATION PLAN............................................................................................................................57
PLAN 7: PROJECT PLANS.........................................................................................................................................59
PLAN 8: SECURITY PROGRAM PLAN........................................................................................................................71
PLAN 9: ENVIRONMENTAL MANAGEMENT PLAN....................................................................................................75
PLAN 10: CONFIGURATION MANAGEMENT PLAN...................................................................................................81

PLAN 11: STRIKE PLAN…………………………………………………………..………………………….……..83

REPORT 1: TRAVEL REIMBURSEMENT REQUEST.....................................................................................................2
REPORT 2: TRIP REPORT..........................................................................................................................................3
REPORT 3: MEETING MINUTES................................................................................................................................3
REPORT 4: MONTHLY PERFORMANCE REPORT.......................................................................................................4
REPORT 5: QC CROSSTELL REPORT........................................................................................................................4
REPORT 6: PERSONNEL QUALIFICATIONS SUMMARY..............................................................................................4
REPORT 7: HOST BASE ACCESS LIST......................................................................................................................5

REPORT 8: OVERTIME REQUEST............................................................................................................................8,32

REPORT 9: CRYPTOGRAPHIC ACCESS CERTIFICATE................................................................................................6
REPORT 10: BMGR AIRCRAFT ACTIVITY LOG…………………………………………………………………...12
REPORT 11: BMGR EVENTS LOG………………………………………………………………………………...12

REPORT 12: WATCHDOG REPORT......................................................................................................................28,30,36 REPORT 13: ACTS OPERATIONAL SUMMARY REPORT.......................................................................................30,37 REPORT 14: RANGE ACTIVITY REPORT...............................................................................................................30,37 REPORT 15: (reserved for future use)...................................................................................................................22,35

REPORT 16: ACTS MAINTENANCE ACTIVITY SUMMARY.......................................................................................44
REPORT 17: AUTOMATED EQUIPMENT SYSTEM REPORT........................................................................................44
REPORT 18: SYSTEM OVERHAUL FORECAST...........................................................................................................45
REPORT 19: MISSED PMI REPORT..........................................................................................................................47
REPORT 20: REPAIR DEFICIENCY REPORT..............................................................................................................47
REPORT 21: OPEN PURCHASE REQUEST.................................................................................................................52
REPORT 22: PRODUCT QUALITY DEFICIENCY REPORT...........................................................................................52
REPORT 23: GFP LISTING........................................................................................................................................54
REPORT 24: ANNUAL REPORT OF GOVERNMENT PROPERTY..................................................................................55
REPORT 25: TECHNICAL SUPPORT REPORTS...........................................................................................................58
REPORT 26: PROJECT PROGRESS REPORT...............................................................................................................59
REPORT 27: FINANCIAL REPORT.............................................................................................................................71
REPORT 28: PERSONNEL SECURITY CLEARANCE REPORT......................................................................................71
REPORT 29: COMSEC INSECURITY REPORT..........................................................................................................74
REPORT 30: SAFETY INSPECTION REPORT...............................................................................................................75

REPORT 31: HAZARDOUS RELEASE REPORT

REPORT 32: ACTS HARDWARE AND SOFTWARE CONFIGURATION REPORT

REPORT 33: ACTS PHYSICAL CONFIGURATION REPORT

REPORT 34: WATERCRAFT GROUNDING REPORT....................................................................................................40
REPORT 35: WATERCRAFT OPERATIONS COST AND SUMMARY REPORT................................................................40

AIR COMBAT TRAINING SYSTEM

ATTACHMENT 1 - PERFORMANCE WORK STATEMENT

vii

SECTION 1

DESCRIPTION OF SERVICES

1.1. OVERVIEW

1.1.1. SCOPE

The purpose of this contract is to provide operation, maintenance, sustainment, and technical support for the continual development, testing, and implementation of the Air Combat Training System (ACTS), subsystems, and ancillary equipment located at Luke Air Force Base (AFB), Arizona, and Tyndall AFB, Florida.

1.1.2. CONCEPT

The Government requires quality services that ensure effective training of ACTS users. The performance evaluation methods used by the Government focus on mission support and the quality of programs and services offered to all customers.

1.1.3. PERFORMANCE WORK STATEMENT (PWS) STRUCTURE

The structure of the PWS is intended to logically describe the work required and is not intended to imply a particular management or organizational structure or a management method. The PWS flows from overall contract description of services into 2 sections on site specific performance. The final sections cover overall contract sustainment, service summary, government furnished property/services and finally general requirements.

1.1.4. ACTS LOCATIONS

The following table depicts ACTS locations delineated by 'Primary' and 'Ancillary' location. Ancillary ACTS locations are those locations where ACTS equipment is physically stationed and the contractor has operation/maintenance responsibility. The contractor shall abide by all standards and expectations depicted in this PWS, sections 2 and 3, when providing services at all ACTS locations. NOTE: The addition of the 33rd FW at Eglin AFB, FL as a debrief facility is being contemplated and may be incorporated via a future contract modification.

Luke AFB
Tyndall AFB
Gila Bend AFAF, AZ
Carrabelle, FL

TABLE 1-1 - ACTS LOCATIONS

1.1.5. SUMMARY OF EXPECTATIONS

The Government expects the contractor to support the ACTS missions in a professional manner and provide continuity of operations and well-maintained equipment to safely accommodate all aircrew training needs. The contractor shall furnish all personnel, equipment, tools, materials, transportation, supervision, and other items necessary (unless otherwise noted in this PWS) to perform to the standards identified in the Service Summary (SS).

1.2. PROGRAM MANAGEMENT

1.2.1. GENERAL

The Government and contractor must work together as a team to efficiently utilize ACTS resources and facilitate effective mission support, maintenance and sustainment efforts, and technical support. The contractor shall manage all aspects of ACTS contract performance, and provide careful stewardship of Government resources. The contractor shall provide an organization that is motivated, responsive, properly trained, and consistently functions at a high level of both skill and productivity in performing all contract requirements, foster an atmosphere of high morale, conducive to innovation, teamwork, workforce stability, and maintain a positive working environment.

1.2.1.1. SITE MANAGERS

The contractor shall provide site managers and identify alternates at Luke AFB and Tyndall AFB, respectively. The site managers and alternates shall have direct access to senior management within the contractor's corporate organization to ensure effective support to the ACTS within the corporate structure. The names of site managers and alternates shall be designated in writing to the Contracting Officer (CO) and the Functional Director (FD).

Appointment 1: Site Managers and Alternates

1.2.1.2. MANAGEMENT WORK HOURS

The site managers or alternates shall be available within 30 minutes during scheduled Government duty hours (Monday - Friday) to discuss contract matters with Government personnel. After scheduled duty hours, the manager or designated alternate shall be available within 2 hours. The site managers or alternates shall attend applicable weekly staff meetings as scheduled. Any overtime for management functions shall be performed at no additional cost to the Government.

1.2.1.3. MANAGEMENT CONTROLS

The contractor shall utilize effective cost, schedule, and performance controls to ensure that all contract requirements are consistently met or exceeded. These controls should be invasive and objective enough to ensure the contractor identifies and eliminates deficiencies before they impact ACTS operations.

1.2.1.4. GOVERNMENT DIRECTED TRAVEL

The contractor shall accommodate Government directed travel as required by the FD or Quality Assurance Personnel (QAP). Travel and Per Diem costs shall be reimbursed under the "Reimbursable Expenses" CLINS depicted in Section B for those locations not listed in Appendix 3. All travel directed by the Government will be in direct support of the ACTS mission and will be paid for on a cost reimbursable basis. The contractor shall submit a Travel Reimbursement Request to QAP depicting all reimbursable costs associated with the travel. Travel and Per Diem costs shall be limited to the rates specified in the Joint Travel Regulation (JTR).

Report 1: Travel Reimbursement Request

1.2.1.4.1. TECHNICAL SUPPORT

The contractor shall provide personnel with appropriate technical expertise to attend and support Government meetings, conferences, working groups and other events, as required, to include all presentations and briefings that may be required during attendance. The contractor shall provide a Trip Report for significant trips, visits, conferences, meetings, etc.

Report 2: Trip Report

1.2.1.5. PROGRAM MANAGEMENT REVIEWS

The contracting officer may require the contract manager to meet with the contracting officer, FD, QAP, and other Government personnel as deemed necessary. The contractor may request a meeting with the contracting officer when he or she believes such a meeting is necessary.

1.2.1.6. MEETING MINUTES

The contractor shall record the minutes for meetings with the Government relating to this contract as requested. The contractor shall finalize, publish and distribute meeting minutes to all attendees by close of business (COB) the next duty day.

Report 3: Meeting Minutes

1.2.1.7. COMPLIANCE

The contractor shall ensure that all ACTS activities are accomplished in accordance with (IAW) applicable Government regulations, directives, instructions, and policies, as well as best business practices.

1.2.2. QUALITY CONTROL

1.2.2.1. GENERAL

The contractor's Quality Control (QC) function shall be an independent evaluation entity autonomous of the contractor's site management staff. QC personnel shall not be responsible for performance of any of the services required by the contract other than quality control. The contractor shall establish, implement, adhere to, and update a QC plan and submit to the Government for acceptance. The contractor is responsible for the quality of work and services provided under this contract. The QC plan shall be designed to ensure contractor performance satisfies all requirements of this PWS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .