MACSPO IDIQ FY23 SEED Project RFIs Question and Answers.pdf
PDF 126 KB Posted
- Attached to
- Multiple Award Contract for Small Purchase Orders (MACSPO) Indefinite Delivery/Indefinite Quantity (IDIQ) Hanscom Air Force Base, MA Federal contract opportunity
- Solicitation number
- FA283522R0021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDED RFI QUESTIONS AND ANSWERS 3 OCT 22 MACSPO IDIQ FY23 SEED Project.pdf | ||
| SEED Project - Fair Opportunity Proposal Request (FOPR) 31 Aug 2022.pdf | ||
| Ordering Procedures (3 May 22).pdf | ||
| MACSPO IDIQ Statement of Work 7 Dec 2021.pdf | ||
| Solicitation - FA283522R0021.pdf | ||
| Section L - Instructions Conditions and Notices to Offeror 6 Jun 22.pdf | ||
| SEED Project SOW Bldg 1210 31 Mar 22.pdf | ||
| SEED B1210 Drawings.pdf | ||
| fair_opportunity_exception_justification_Redacted.pdf | ||
| Hanscom AFB Contractor Environmental Guide (Apr 21).pdf | ||
| Section M - Evaluation Factors For Award (7 Jun 22).pdf | ||
| Wage Determination 12 Aug 22.pdf | ||
| Installation Facilities Standards (IFS) Material Selections.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
MACSPO IDIQ FY23 - SEED PROJECT, Building 1210
Site Visit 21 Sep 2022
Questions and Answers
1.Q: If we have to provide price proposal for Seed project “install new shower stall in locker room” at B1210 in the SF1442 section 17 or in the proposal letter?
A: Proposal Letter (not in Section 17). Only provide a price proposal for the SEED project.
2.Q: Do we have to provide any price in solicitation section B “supplies or services & prices or costs”.
A: No, only provide a price proposal for the SEED project
3.Q: Plans call to remove and reinstall one smoke detector. What is the process for shutting down the fire alarm panel?
A: Contact CE and we will get ahold of techs to shut down alarms
4.Q: Plans call for a new exhaust fan through the roof. There is an existing exhaust fan through the roof in the ladies’ room 11 feet away. Can we tie into the existing exhaust for the ladies’ room?
A: Yes
5.Q: Statement of work calls for new water lines to be run from the mechanical room. Can we tie into the existing hot and cold-water lines at the ladies’ bathroom?
A: No
6.Q: Will off hours work be needed for the shutdowns to the heat and water?
A: No
7.Q: Will the shower base need to be ADA compliant?
A: No
8.Q: What is the makeup of the existing exterior wall for the infill at the windows?
A: CMU
9.Q: What is the color of the Drivit exterior wall? Fading of the existing will make it hard to match. Should that side of the building be painted to blend the patch?
A: Paint to match
10.Q: Is the precast sill being removed? Will a new precast sill be required?
A: Yes, sill being removed and no precast sill be required
11.Q: Shower walls don’t seem to have finish on both sides, are walls required on the outside of the shower walls to provide a finish side?
A: No outside will be tiled
12.Q: Will the base provide guidance on locations of valves and where equipment needs to be purged after the heater is installed?
A: No