MXRD 09-0071 Complete Plans.pdf

PDF 15 MB Posted

Attached to
Repair HVAC system at building 1548 Federal contract opportunity
Solicitation number
FA2835-12-R-0016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

MXRD 09-0071 Complete Plans

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC system at building 1548, newest first.
File Type Posted
Notice_of_Award.pdf PDF
1548 HVAC- Site Visit Questions.docx DOCX document
1548 HVAC- Site Visit Questions.docx DOCX document
MXRD 09-0071 Complete Specifications.pdf PDF
Wage Determination.pdf PDF
RFP.pdf PDF
RFP Cover Letter.pdf PDF
bid schedule .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineering and Design Section

66th Civil Engineering Squadron

Designed for:

USER

FIRE DEPARTMENT

SECURITY POLICE

SAFETY

COMMUNICATION / TELEPHONE

COMMUNICATION / LAN

BIOENVIRONMENTAL

ENVIRONMENTAL

GOVERNMENT REPRESENTATIVE

HANSCOM APPROVAL

UE CONFINIA

PE

NE

TR

A

M

UG

E

OGRAPHIAE SCIENTIAEQ

S

U N I

T E

D

TATES AIR

F O R

C E

ENGINEERI

N

G

UE CONFINIA

PE

NE

TR

A

M

UG

E

OGRAPHIAE SCIENTIAEQ

S

U N I

T E

D

STATES AIR

F O R

C E

ENGINEERI

N

GCIVIL

ELECTRONIC SYSTEMSCENT

E R

E

AIR

FORCEMAT R

I

ELCOMMAND

Department of the Air Force Air Force Materiel Command

Hanscom Air Force Base, MA

DEWBERRY-GOODKIND INC.

280 SUMMER ST.

BOSTON, MA 02110

STRUCTURAL MECHANICAL ELECTRICAL

Project Number: MXRD 09-0071

G-0.01

REPAIR HVAC FOR BLDG. 1548 FITNESS CENTER

Sheet 1 of 23

ARCHITECTURAL

MASSACHUSETTS

VERMONT NEW HAMPSHIRE

CONNECTICUT

RHODE

ISLAND

ATLANTIC OCEAN

BOSTON

BEDFORD

NASHUA

WORCESTER

SPRINGFIELD

HARTFORD

PLYMOUTH

NANTUCKET

MARTHA’S VINYARD

WILMINGTON

BEDFORD

LEXINGTON

ARLINGTON

BOSTON

BROOKLINE

DEDHAM

WEYMOUTH

HINGHAM

QUINCY

FRAMINGHAM

CONCORD

LYNN

SALEM

HANSCOM AFB

4th CLIFF

REC ANNEX

ATLANTIC OCEAN

T

W

S

IE

R R

A

T

T A

N G

O

T

W

J U L

IE

T

T

G O

L F

T

L P

H A

T/W ECHO

T

F

X T

R O

T

T

B R

A V

O

T

C H

A R

L

IE

T/W WHISKEY

T

M

IK

E

T

N

V E

M B

E R

T

T E

L

T/W ROMEO

15005

F O

R B E S

S T

R E E T

T1537

COLONIAL

PLACE

GRIFFISS STREET

ADAMS ROAD

5B

5A

2J

2F

2C

2D

2E1302

M

T1315

1813 1811

14 14

2A

T120515001

15006

15002

15004

T1851

GATE 4

15003

2B

1302K

T1137

T

IN

K E

O P

G R

E N

IE

R E

E T

S C

O

A D

PATRICK

LOOP

BESTIC

DRIVE

HAMILTON

STREET

KIRTLAND

STREET

T2424

ENT

ROAD

POPE

TERRACE

CLARK

CIRCLE

HILL

TERRACELIBERTY

LANE

PRESCOTT

PLACE

LIBERTY

LANE

CONSTITUTION

DRIVE

DAWES

TERRACE

FREEDOM

CIRCLE

HICKAM

LANE

2C110

2F

1102D 11201104

MASSACHUSETTS AVENUE

GATE 2

ANDREW’S

CIRCLE

OFFUTT

ROAD

2E

GATE 3

SOUTH L

AB

PARKING

GARAGE

LINCOLN

SCHOOL

T214

PLAYGROUND

SOCCER FIELD

KATAHDIN HILL

M O

N

P L

Y

O U

N D

P L

O U

N D

PLAY GROUND

PLAY GROUND

ATHLETIC

FIELD

ATHLETIC

FIELD

A T

H L E

T

IC

F

IE

L D

ATHLETIC

FIELD

P L

A Y

G R

O U

N D

P L

A Y

G R

O U

N D

B A S

K E

T B

A L L

C O

U R

T

B A S

K E

T B

A L L

C O

U R

T

O B

S C

U R

E

PLAYGROUND

EQUIPMENT

PLAYGROUND

EQUIPMENT

PLAYGROUND

EQUIPMENT

PLAYGROUND

EQUIPMENT

PLAYGROUND

EQUIPMENT

PLAYGROUND

EQUIPMENT

BASKET

BALL

COURT

MIN.

GOLF

GATE 2

GATE 3

GATE 4

Shawsheen Rive r

NELLIS

TERRACE

K A T

A H

D

IN

IL

L

PLA

YGROUND

B U S

BUS

B U S

B U S

B U S

BUS

B U

S

18251839

T1443

N E

X

IV

8 6 4 2

16 1 4 12

15 13 11 9 7 5 3 1

4 3

4 3 2 1

19 17

8 7 6 5

1 2 3 4

41 43 45 47 49

7 5 3 1

0 2

3 2

4 2

9 2

240524

KELLY

LANE

SCO

TT CIRCLE

HERIT

AGE R

OAD

PATRICK

PLACE

PATTERSON

ROAD

OTI

S

STREET

G R

E N

IE

R

S

T R

E E

T

DOW STREET

1312L

PLAYGROUND

EQUIP.

E G

L

IN

S

T R

E E T

GATE

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

BARKSDALE STREET

ARNO

LD

STREET

V A N

D E N B E

IV

E

CHENNAULT STREET

ROBINS STREET

HUNTER STREET

H A

R T

W E

V

E N

U E

W O

R E E

SCHILLING

CIR

CLE

RANDOLPH

R

OAD

WRIG

HT S

TREET

M A

R R

E T

T

S

T R

E E T

M A

R R

E T

T

S

T R

E E T

A

IR

P O

A D

H A

N S

C

IV

E

H A

N S

C

IV

E

H A

N S

C

IV

E

OLD BEDFORD ROAD

G R

IF

F

IS

R E

E T

K

IR

T L

A N

D

S T

R E

E T

CREDIT

UNION

EGLIN

STREET

BASE PLAN

N

HARTWELL AVE.

GATE

VICINITY PLAN

ROUTE 2A/ VANDENBERG GATE

AND VISITOR CENTER

225 128

INDEX

SHEET DRAWING DRAWING NAME

NUMBER NUMBER

G-0.02

N .T .S

L O

C A

T

IO

N P

L A

N D

R A

W

IN

G I

N D

E X

BLDG 1810

120 GRENIER ST.

BASE CIVIL ENGINEERING

BLDG 1604

BASE CONTRACTING

GENERAL NOTES

1.

THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT

REPRESENTATIVE AT LEAST 21 DAYS PRIOR TO AN INTENDED

SHUTDOWN OF ANY UTILITY. THE CONTRACTOR SHALL NOT

PROCEED WITH ANY UTILITY SHUTDOWN WITHOUT THE APPROVAL

OF THE GOVERNMENT REPRESENTATIVE. UTILITY SHUTDOWNS

SHALL BE CONFINED TO NIGHTS AND/OR WEEKENDS TO THE

FULLEST EXTENT POSSIBLE AND SHALL BE COORDINATED WITH

THE GOVERNMENT REPRESENTATIVE.

2.

3.

4. PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL

COORDINATE WITH THE GOVERNMENT REPRESENTATIVE AND THE

BASE ENERGY MANAGER TO ENSURE THAT PROVISIONS ARE MADE

TO COLLECT ENERGY AND WATER CONSUMPTION DATA AT

APPROPRIATE TIMES BEFORE, DURING AND AFTER THE WORK TO

ALLOW FOR THE ENERGY SAVINGS VERIFICATION.

5.

6.

EXISTING ROOF IS UNDER FIRESTONE WARRANTY UNTIL

6/01/2017. ANY REPAIR OR ALTERATION WORK SHALL BE

PERFORMED BY A FIRESTONE CERTIFIED CONTRACTOR.

THE CONTRACTOR SHALL PROVIDE ALL REQUIRED BARRICADES,

FLAGMEN, SIGNS AND/OR OTHER APPROVED DEVICES

NECESSARY TO PROPERLY PROTECT AND MAINTAIN PEDESTRIAN

AND VEHICULAR TRAFFIC IN ROADS AND PARKING LOTS AT ALL

TIMES DURING CONSTRUCTION.

SAFETY IS OF PARAMOUNT IMPORTANCE DURING THE

CONSTRUCTION OPERATION. PEDESTRIAN AND VEHICLE TRAFFIC

SHALL BE WARNED BY THE USE OF SIGNS, BARRICADES AND

OTHER MEANS. WHERE OPEN TRENCHES WILL INTERSECT EITHER

PEDESTRIAN WALKWAYS OR VEHICLE ROADWAYS, TEMPORARY

BRIDGES SHALL BE ERECTED FOR TRAFFIC MAINTENANCE. ALL

TRENCHES LEFT OPEN DURING NON-WORKING HOURS SHALL BE

ILLUMINATED AND BARRICADED. SECTIONS OF TRENCH THAT

REQUIRE BRIDGING WILL BE PERMITTED A MAXIMUM OF NINE (9)

HOURS FOR THE COMPLETION OF THIS TEMPORARY BRIDGING. AT

THE COMPLETION OF CONSTRUCTION THE CONTRACTOR SHALL

REMOVE ALL TEMPORARY BRIDGING, BARRICADES AND LIGHTING.

BLDG 1548

FITNESS CENTER

DOOR FRAMES ARE KNOWN TO CONTAIN TRACES OF LEAD.

CONTRACTOR SHALL COMPLY WITH MASSACHUSETTS DEP

REGULATIONS WHEN WORKING NEAR DOOR FRAMES.

7. CONTRACTORS SHALL CLEAN WORK AREAS DAILY.

1 G-0.01 COVER SHEET

2 G-0.02 LOCATION PLAN & DRAWING INDEX

3 G-0.03 BUILDING 1548 SITE PLAN

4 A-1.10 ARCHITECTURAL - BUILDING 1548 PLANS & ELEVATIONS

5 A-1.20 ARCHITECTURAL - BUILDING 1548 ROOF PLAN & DETAIL

6 A-1.30 ARCHITECTURAL - BUILDING 1548 ROOF DETAILS

7 S-1.10 STRUCTURAL - BUILDING 1548 ROOF PLAN & DETAILS

8 M-0.01 MECHANICAL - LEGEND & GENERAL NOTES

9 MD-1.10 MECHANICAL - BUILDING 1548 FIRST FLOOR DEMOLITION PLAN

10 MD-1.20 MECHANICAL - BUILDING 1548 SECOND FLOOR DEMOLITION PLAN

11 M-1.10 MECHANICAL - BUILDING 1548 PHASE 1A/1B PLANS

12 M-1.20 MECHANICAL - BUILDING 1548 PHASE 1B/1C PLANS

13 M-1.30 MECHANICAL - BUILDING 1548 PHASE 2A PLANS

14 M-1.40 MECHANICAL - BUILDING 1548 PHASE 2B/2C PLANS

15 M-2.10 MECHANICAL - SCHEDULES I

16 M-3.10 MECHANICAL - DETAILS I

17 M-3.20 CONTROL DETAILS

18 E-0.01 ELECTRICAL - LEGEND & GENERAL NOTES

19 E-1.10 ELECTRICAL - BUILDING 1548 ELECTRICAL PLAN

20 E-1.20 ELECTRICAL - BUILDING 1548 ROOF PLAN

21 E-1.30 ELECTRICAL - PANEL SCHEDULES

22 E-1.40 ELECTRICAL - MISCELLANEOUS SCHEDULES

23 E-1.50 ELECTRICAL - RISER DIAGRAMS

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

EL

ECTRONIC

SYSTEMS

CENT

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

IR

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\AA G0.2 General Sheet PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

U

IL

D

IN

G

F

IT

N E

S S C

E N

T

Property of the United States Air Force - For Official Use Only

P R

O J E

C T N

U M

B E

R

M X

R D

-0

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\AAA G0.03 Laydown Area PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

R

O J E

C T N

U M

B E

R

M X

R D

-0

LIGHT POLE

C H

K

N C

E

ELEC. BOX

G R

A N

IT

R B

GRANITE CURB

E D

V E

M E

N T

MARRETT STREET

TRANS.

ELEC.

B I

L

K

POLE

LIGHT

4 HOLE

SHED

SHED

E

W A

L K

L K

W A

L K

B

IT

C O

N C R E T E

S T E A

M

T R E N C

H

B I

L

K

C O

N C R E T E

C

U R B

S L

CB

CB

CB

CB

CB

CB

CB

S

E

P

C

LAYDOWN AREA NOTES:

1. LAYDOWN AREA INDICATED IS APPROXIMATE. CONTRACTOR SHALL COORDINATE WITH THE

GOVERNMENT REPRESENTATIVE TO ESTABLISH THE REQUIRED LAYDOWN AREA.

2. ALL DISTURBED AREAS SHALL BE RESEEDED AFTER ALL OTHER WORK IS COMPLETE.

BUILDING 1548

3. CONTRACTOR SHALL WATER AND MAINTAIN ALL RESEEDED AREAS AND SHALL APPLY ADDITIONAL

SEED AS NECESSARY UNTIL THE NEW GRASS IS ACCEPTED BY THE GOVERNMENT REPRESENTATIVE.

4. RESTORE AREA TO ORIGINAL CONDITIONS INCLUDING LOAM AND SEED.

5. CONTRACTOR ACCESS TO THE LOCKER ROOMS SHALL BE THROUGH THE REAR DOORS.

PROPOSED LAYDOWN AREA

(COORDINATE WITH HANSCOM

AFB FIRE DEPARTMENT)

6. CONTRACTOR TO MEET WITH THE GOVERNMENT REPRESENTATIVE TO SURVEY INITIAL CONDITIONS

OF THE LANDSCAPING, SIDEWALKS, DRAINAGE, DOORS, SIDING AND OTHER EXTERIOR FEATURES

PRIOR TO THE START OF WORK AND REPAIR ANY DAMAGES AT THE END OF PROJECT.

G-0.03

N

B U

IL

D

IN

G

S

IT

E P

L A

N

A S N

O T

E D

0’ 80’ 120’ 160’

PROPOSED LAYDOWN AREA

SCALE: 1" = 40’-0" G0.03

20’ 40’

SCALE: 1" = 40’-0"

9’-0"

7’-4"

SLOPESLOPE

SLOPESLOPE

11 12

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Arch\plot\A1.10 Building 1548 Plan PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

BLDG 1548

P R

O J E

C T N

U M

B E

R

M X

R D

-0

X’-X" CEILING HEIGHT

HVAC SUPPLY DIFFUSER, SEE

MECHANICAL DRAWINGS

2’x4’ SUSPENDED ACOUSTIC TILE

IN GRID SYSTEM, REFERENCE

NOTES

EXIT SIGN, REFERENCE NOTES

EXISTING CERAMIC FLOOR TILE

EXISTING CARPET TILE

EXISTING/NEW VINYL WALL BASE

NEW VINYL SHEET FLOORING

CT

VB

CPT

VSH

MTH

MTS

EXISTING MARBLE THRESHOLD

EXISTING METAL TRANSITION STRIP

S SPEAKER

SPRINKLER

M OCCUPANCY SENSOR

H.C.

ACT

GC

HANDICAP

ACOUSTICAL CEILING TILE

GENERAL CONTRACTOR

LEGEND

HVAC SUPPLY DIFFUSER, SEE

MECHANICAL DRAWINGS

ELEVATION INDICATOR

DETAIL INDICATOR

DRAWING BLOCK TITLE, TYPICAL

CENTER LINE

DRAWING BLOCK TITLE

1 1/2" = 1’-0"

C4 1 1/2’1/2’0 1’

A-512

D2

CL

C2

CORRIDOR

ROOM NAME AND NUMBER

1 COLUMN GRID

A4

A-201

BUILDING SECTION INDICATOR

9’-0"

9’-0"

9’-0"

9’-0"

9’-0"

9’-0"

9’-0"

9’-0"

9’-0" 9’-0"

8’-0"

8’-0"

7’-0"

7’-0"

8’-0"

9’-0"

7’-4"

7’-4"

7’-4"

9’-0"

7’-4"

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

STEAM MECH.

ROOM

MEN’S

STEAM

MEN’S

SAUNA

MASSAGE

WOMEN’S

TOILET ROOM

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

WOMEN’S L.R.

VESTIBULE

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

9’-0"

9’-0"

9’-0"

9’-0"

SEE NOTES 5, 6 & 7

IM

S

M

M

M

S

S

SM

M

SEE NOTE 10

SEE NOTE 10

SEE NOTES 5, 6, 7,

8 & 9

A A A A A A

A301

A-A

CORRUGATED METAL

MECHANICAL SCREEN

6’-6" ABOVE ROOF

EIFS COLOR #2

EIFS COLOR #1 EIFS COLOR #2

EIFS COLOR #1

EXTERIOR LIGHT

FIXTURE, TYP.GENERATOR ENCLOSURE

METAL COPING. TYP.

BRICK VENEER BASE,

TYP.

STEEL BOOT, TYP.

PAINTED SAME COLOR

AS BRICK BASE. SEE

DETAIL 2/A702

CONTROL JOINT,

TYP,

METAL COPING.

TYP.

AESTHETIC

GROOVE, TYP.

AESTHETIC

GROOVE, TYP.

EXTERIOR LIGHT

FIXTURE, TYP.

EQ. EQ.

EQ.EQ.

EQ. EQ. EQ. EQ. EQ.

METAL SCUPPER BOX AND

DOWNSPOUT, PAINT SAME

COLOR AS ADJACENT EIFS

CONTROL JOINT,

TYP,

A-1.20

+/-27’-9"

EXIST CORRUGATED METAL

MECHANICAL SCREEN TO

BE REMOVED. SEE DETAIL

EXIST CORRUGATED METAL

MECHANICAL SCREEN TO

BE REMOVED. SEE DETAIL

A A

EL. 128.38’

SECOND FLOOR

EL. 143.05’

T.O. MASONRY

EL. 161.05’

T.O. SLAB

FIRST FLOOR

T.O. SLAB

BRICK VENEER

SOLDIER COURSE, TYP.

BRICK VENEER

BASE, TYP.

ALUM. FRAME

METAL COPING.

TYP.

EIFS COLOR #2

METAL COPING. TYP.

GRADE VARIES

SEE CIVIL DWGS.

BRICK VENEER,

ROWLOCK COURSE, TYP.

GENERATOR ENCLOSURE

CONTROL JOINT,

TYP,

CONTROL JOINT,

TYP,

CONTROL JOINT,

TYP,

EQ. EQ.

6’-0"

EQ.

METAL SCUPPER BOX AND

DOWNSPOUT, PAINT SAME

COLOR AS ADJACENT EIFS

CORRUGATED METAL

MECHANICAL SCREEN

6’-6" ABOVE ROOF

UPUP

11 12

18’-6"

A-1.20

EXIST CORRUGATED METAL

MECHANICAL SCREEN TO

BE REMOVED. SEE DETAIL

NOTES:

1. REMOVE AND REINSTALL EXISTING LOCKERS AND INTEGRAL BASE

FOR REMOVAL OF CARPET TILE AND REPLACEMENT OF FLOOR

FINISH. GC TO VERIFY IN FIELD QUANTITY AND LOCATIONS. H.C.

LOCKERS TO BE PLACED IN CURRENT LOCATIONS.

2. REMOVE AND REINSTALL BENCHES AS REQUIRED FOR FLOOR

INSTALLATION.

3. REMOVE CARPET TILE TO BARE CONCRETE SLAB AND WALL BASE

ALONG ALL WALLS. REPLACE WITH SHEET VINYL FLOORING AND

VINYL WALL BASE. REPAIR PAINT DAMAGED WALLS WHERE THE

WALL BASE HAS BEEN REMOVED.

4. EXISTING THRESHOLDS AND TRANSITION STRIPS TO REMAIN.

BUILD UP SUBFLOOR WITH CEMENTITIOUS UNDERLAYMENT AS

REQUIRED TO MAKE SMOOTH AND FLUSH FINISH FLOOR

TRANSITION.

5. REMOVE CEILING GRID, ACT, LIGHTS, DIFFUSERS, CONDUITS,

PIPES, ETC. TO THE EXTENT REQUIRED TO INSTALL NEW HVAC

DUCT WORK AND PLUMBING WORK FROM NEW ROOF TOP UNITS

AND NEW STRUCTURE. CEILING GRID AND ACT TO BE REPLACED

WITH NEW.

6. EXISTING LIGHT FIXTURES TO BE REMOVED, STORED, CLEANED,

REINSTALLED AND RE-LAMPED.

7. INSTALL NEW CEILING GRID AND ACT.

8. REINSTALL LIGHTS, DIFFUSERS, CONDUITS, PIPES, ETC. AFTER ALL

HVAC AND PLUMBING WORK ABOVE IS COMPLETED TO SAME

HEIGHT AS PREVIOUS.

9. CONTRACTOR TO STORE ALL LIGHTS, DIFFUSERS, ETC. IN SAFE

PLACE UNTIL READY FOR REINSTALLATION.

10. REMOVE ALL CEILING MILDEW, PEELING PAINT AND DAMAGED

GYPSUM BOARD. PATCH AND REPLACE FOR SMOOTH TRANSITION

TO ADJACENT CEILING FINISH. REPAINT ENTIRE CEILING AREA

WITH MOLD AND MILDEW RESISTANT PAINT. MATCH EXISTING

PAINT COLOR AND SHEEN.

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

MEN’S

STEAM

MEN’S

SAUNA

MASSAGE

WOMEN’S

TOILET ROOM

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

SEE NOTE 2, TYP.

SEE NOTE 1, TYP.

SEE NOTE 4, TYP.

SEE NOTE 4, TYP.

SEE NOTE 3, TYP.

SEE NOTE 4, TYP.

SEE NOTE 3, TYP.

CT

CT

CT

CT

CT

CT

CT

CT

CT

L

IM

R K

VB

VB

VB

VB

VB

VB

VB

VB

VB VB

VB

VB

VB

VB

VB

CPT VSH/

CPT VSH/

CPT VSH/

CPT VSH/

CPT VSH/

MTS

M T S

MTSMTH

ALL SIDES

TYP.

EXISTING ALUM. THRESHOLD TO REMAIN, TYP.

SEE NOTE 1

VB

SEE NOTE 3

(TYP.)

VESTIBULE

WOMEN’S L.R.

SCALE: 1/8" = 1’-0"

A S N

O T

E D

SCALE: 1/8" = 1’-0"

SCALE: 1/8" = 1’-0"

SCALE: 1/8" = 1’-0"

4SOUTH ELEVATIONWEST ELEVATION

A1.10 A1.10

A1.10 A1.10

N

PARTIAL FIRST FLOOR PLAN PARTIAL FIRST FLOOR CEILING PLAN

B U

IL

D

IN

G

P

L A

N S E

L E

V A

T

IO

N S

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0" A-1.10

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Arch\plot\A1.20 Building 1548 Roof PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

SLOPE

TO DRAIN S

L

O P

E

A

IN

MEMBRANE

ROOFING

SCUPPER,

WALKWAY

PAD, TYP.

METAL COPING

11 12 13

VTR, SEE

PLUMB.

DWGS

INSULATION

CRICKET, TYP.

CORRUGATED METAL

MECHANICAL SCREEN

6’-6" ABOVE ROOF

SCUPPER BOX AND

DOWNSPOUT, TYPICAL

SEE DETAIL C/A702

4’-0" WIDE REMOVABLE

SECTION CORRUGATED METAL

MECHANICAL SCREEN

METAL STAIR

AND HANDRAIL

STEEL LADDER,

TYP. SEE

SECTION B/A142

1’-0"

27’-2"

EDGE OF MECHAINICAL

ROOF SCREEN BRACING

TAPERED

INSULATION,

TYP.

GALV. STEEL CHANNEL

12’-0" +/_ O.C. MAX.

REFER TO STRUC.

DWGS

GALV. STEEL CHANNEL.

REFER TO STRUC.

DWGS

.040" THICK EXTRUDED

ALUMINUM SCREEN

STRINGER, PAINTED

4’-0"

ALUMINUM SLATS SCREEN ATTACHED TO GALV.

STEEL STRUCTURE. PROVIDE MATCHING METAL

CORNER CAP AT EACH CORNER.

GALV. STEEL 45 DEG.

KNEE BRACE. SEE STRU.

DWGS.

PATCH & REPAIR

EIFS @ SCREEN

REMOVAL AREA

OF WALL

PROP. HVAC

UNIT

PROP. HVAC

UNIT

A-1.30

A-1.30

A-1.20

A-1.30A-1.30

NEW WALKWAY

PADS (TYP)

EXIST. LADDER

EXISTING

WALKWAY PADS

NOTE:

EXISTING ROOFING IS UNDER

WARRANTY. ALL ROOFING WORK

TO BE DONE BY CERTIFIED

ROOFING CONTRACTOR.

WARANTY IS TO BE MAINTAINED.

EXIST. HVAC UNIT

TO BE REMOVED

EXIST. EQUIPMENT SCREENING

AND ASSOCIATED BRACING TO

BE REMOVED

SEE SECTION 2

THIS DWG

20x24

20x24 UP

OSHA COMPLIANT STEEL TUBING NON PENETRATING

42"HIGH GUARDRAIL SYSTEM W/BRIGHT YELLOW

POWDER COAT FINISH. PROVIDE A 3’-0"x3’-0" 60MIL

UNCURED EPDM MEMBRANE UNDER EACH BASE.

DRAWING NOTES:

REMOVE EXISTING CURBING. PATCH AND REPAIR

OPENING TO MATCH EXISTING.

A-1.30

ROOF PENETRATION.

SEE STRUC. DWGS.

AND DETAIL

GENERAL NOTE:

1. ALL SCREEN SUPPORTS TO BE WATER TIGHT.

CAP AND SEAL ALL JOINTS.

CUT POST FLUSH TO

CURBING AND PROVIDE

EPDM METAL FLASHING

CUT POST FLUSH TO

CURBING AND PROVIDE

EPDM METAL FLASHING

EXISTING EQUIPMENT SCREEN AND

ASSOCIATED BRACING TO BE REMOVED

TO EXTENT SHOWN.

A-1.20

A S N

O T

E D

SCALE: 1/8" = 1’-0"

N

ROOF PLAN 2EQUIPMENT ROOF SCREEN DETAIL1

A-1.20 A-1.20

B U

IL

D

IN

G

R

O O

F P

L A

N D

E T

A

IL

SCALE: 1 1/2" = 1’-0"

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

METAL CURB

NON-SHRINK GROUT

EXISTING

ROOFING TO

REMAIN

EXIST SEALANT

2’-0"

MOLDED RUBBER WALK PAD

ADHERED TO MEMBRANE IN

ACCORDANCE WITH

MANUFACTURER’S

RECOMMENDATION’S

6"

EXIST. SINGLE-PLY MEMBRANE

ROOFING, FULLY ADHERED

EXIST. PROTECTION BOARD

EXIST. RIGID INSUL, MIN.

R-30, TYP.

EXIST. METAL DECK

EXIST. AIR/VAPOR BARRIER MEMBRANE

ON OVER METAL DECK

ALUMINUM FLASHING

LAP SEALANT

SPLICING CEMENT

PENETRATION

PROTECTION BOARD

FILLER AT PENETRATION

MEMBRANE FLASHING FULLY

ADHERED TO METAL CURB

SINGLE-PLY

MEMBRANE ROOFING,

FULLY ADHERED

1’-0" TYP.

3" MIN., TYP.

VARIES

P.T. WD. BLKG.

AT PERIM.

EXIST. METAL DECK

EXIST STEEL COL. ROOF SCREEN

SUPPORT TO BE REMOVED. CUT

POST FLUSH TO MTL CURBING.

RIGID INSUL, TYP.

AIR/VAPOR BARRIER

MEMBRANE OVER METAL

DECK

2" PRESSURE TREATED PLYWOOD

BLOCKING. FASTEN PLYWOOD TO

EXISTING CURBING. 60 MIL EPDM MEMBRANE

FLASHING

SELF ADHERING RUBERIZED

ASPHALTIC MEMBRANE TO BE

APPLIED OVER PLYWOOD.

MECHANICAL UNIT

METAL CAP FLASHING,

COORDINATE WITH

EQUIPMENT

MANUFACTURER

BONDING ADHESIVE

AND MEMBRANE

FLASHING

FASTENING PLATE

12" O.C. MAX.

SPLICING CEMENT

LAP SEALANT

PREFABRICATED METAL

EQUIPMENT CURB

AROUND PERIMETER

OF OPENING

PROTECTION BOARD

RIGID INSUL, MIN.

R-30, TYP.

AIR/VAPOR BARRIER

MEMBRANE ON OVER

METAL DECK

SINGLE-PLY

MEMBRANE

ROOFING, FULLY

ADHERED

RIGID INSUL.

P.T. WOOD NAILER BY

ROOFING CONTRACTOR

MEMBRANE FLASHING

RETURN (2" MIN)

NEOPRENE PAD

CONT. SEALANT AT

METAL CAP FLASHING

8"

EXISTING METAL

DECK, SEE STRUC.

DWGS

EXISTING STEEL

BEAM, SEE STRUC.

DWGS

2’-0"

EXTENT OF DEMO &

NEW WORK AT

PERIMETER OF UNIT

EXISTING ROOFING

TO REMAIN

NOTE:

ITEMS ON THIS PAGE ARE

PROPOSED UNLESS OTHERWISE

NOTED.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Arch\plot\A1.30 Building 1548 Roof Details PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

A-1.30

A S N

O T

E D

SCALE: 1 1/2" = 1’-0"

SCALE: 1 1/2" = 1’-0"

SCALE: 1 1/2" = 1’-0"

WALKWAY PAD DETAIL

ROOF PENETRATION DETAIL

A-1.20

ROOF TOP EQUIPMENT DETAIL

A-1.20

A-1.20

B U

IL

D

IN

G

R

O O

F D

E T

A

IL

S

0’ 1’

SCALE: 1 1/2" = 1’-0"

2’

8K1

8K1

8K1

8K1

8K1 1

M E

T A

L R

O

59’-4" LOW ROOF AREA

8"

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

RTU 10

11 12 13

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

4’-11"5’-4"

3’-4 2"

3’-6" 5’-0" 4’-4" 4’-4"

X

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

K C

S

S

L O

P E

D

4’-9" 4’-9"

4’-9"

4’-9" 4’-9 2"

REMOVABLE PANEL

ERV1

L1 L1 L1

T.O. JOIST BRG.

EL. 153.05’

T.O. JOIST BRG. EL.

141.05’ AT HIGH POINT

(2)- ROWS HORIZ.

BRIDGING T&B (TYP.)

6’-6" HIGH SCREEN

2" 20 GA.

METALROOF DECK

T.O. JOIST BRG.

EL. 140.38’

AT LOW POINT

EXISTING DRAIN

PIPE

EXIST. WALL REINF.

#6@16" @ 8" CMU

#8@16" @ 12" CMU

EXIST. CMU BEARING WALL

W/ALL CORES

SOLID GROUTED. SEE PLANS.

EXIST. WALL REINF.

#6@16" @ 8" CMU

#8@16" @ 12" CMU

T.O. PARAPET (TYP.)

EXIST. CMU BOND BEAM W/(2)- #6 @

8" & (3)- #6 @ 12".

EXIST. CMU BEARING WALL

W/ALL CORES

SOLID GROUTED. SEE PLANS.

EXIST. CONT. L3x3x3 5/16" DECK SUPPORT W/MECHANICAL

ANCHORS @ 24" O.C.

EXIST. EXTERIOR

FINISH (TYP.) EXIST. 1

2" METAL ROOF

DECK

EXIST. CONT. L7"x4"x

8" W/ CHEMICAL ANCHORS

@ 18" O.C.(MAX.)

METAL DECK SPAN

METAL DECK

B U

IL

D

IN

G

P

L A

N A

N D D

E T

A

IL

ROOF PLAN

SECTION

SECTION

DETAIL

SCALE: 1/8" = 1’-0"

SCALE: 3/4" = 1’-0"

S-1.10

SCALE: 3/4" = 1’-0"

S-1.10SCALE: 3/4" = 1’-0"

A

S-1.10

A S N

O T

E

S-1.10

SCALE: 3/4" = 1’-0"

TYPICAL WALL MOUNT

PROP. L3x3x1/4" x 4" LONG EACH SIDE OF DUCT AT

4’ O.C. W/ (1)- CHEMICAL ANCHORS (T MIN =

5,400 LB, V MIN = 5,800 LB) (TYP).

CONTRACTOR TO MINIMIZE GAP BETWEEN HVAC DUCT

AND EXISTING PIPE. NOT TO EXCEED 3".

CONTRACTOR TO COORDINATE CONNECTION OF

PROPOSED HVAC DUCT TO WALL MOUNT.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Struct\Building\Plot\S1.10 HVAC on Roof PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

S-1.10

PROP. 20KCS3 TO BE PLACED

ADJACENT TO EXISTING JOISTS

(TYP. 3 PER HVAC UNIT, 6 TOTAL)

STEEL BRACING ANGLES

AT HVAC ROOF OPENING,

SEE DETAIL A

ROOF OPENING

TYP. COORDINATE

WITH MECH.

EQUIP. MFG

PHASE 1

PHASE 2

PROP. HVAC UNIT

(SEE MECH DWGS)

(TYP. 2)

EXIST. STEEL FRAME OPENING TO

BE MODIFIED AS REQUIRED TO FIT

NEW UNIT

1/8 1"

(TYP)

PROP. 20KCS3

JOIST

PROP. 38" GUSSET PL. CENTERED UNDER EACH JOIST

W/ (4)- CHEMICAL ANCHORS AT 4" O.C. (T MIN =

5,400 LB, V MIN = 5,800 LB) (TYP).

SEE PLAN

S-1.10

OPENING TO SUIT EQUIPMENT

SEE PLANS FOR LOCATION

L5x5x 4"

L5x5x 4"

L x x

L x x

C/C JOIST

CLIP L6x4x 8"

NOTE:

DETAIL SIMILAR AT EQUIPMENT

SUPPORT ANGLES.

S-1.10

PROP. 20KCS3 TO BE PLACED

ADJACENT TO EXISTING JOISTS

(TYP. 3 PER HVAC UNIT, 6 TOTAL)

STEEL BRACING ANGLES

AT HVAC ROOF OPENING,

SEE DETAIL A

ROOF OPENING

TYP. COORDINATE

WITH MECH.

EQUIP. MFG

PHASE 1

PHASE 2

PROP. HVAC UNIT

(SEE MECH DWGS)

(TYP. 2)

EXIST. STEEL FRAME OPENING TO

BE MODIFIED AS REQUIRED TO FIT

NEW UNIT

M-0.01

N .T .S

L E

G E

N D G

E N

E R

A L N

O T

E S

DN

DN

UP

UP

D

R

DNUP

BDD

FC

10x8

VD

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

EXISTING DUCT TO REMAIN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

(WALL TYPE)

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

(WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION

FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION,

OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE

OR RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH X DEPTH)

MANUAL VOLUME DAMPER

BACK DRAFT DAMPER

DUCTWORK SYMBOLS

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M0.01 General Notes PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

R

O J E

C T N

U M

B E

R

M X

R D

-0

M.X

M.X

CALL OUT SYMBOLS

SYSTEM OR SERVICE (ie LPS)

SYMBOL DESIGNATES ASSOCIATED

REFER TO DRAWINGS (XXX)

SHEET NUMBER

SECTION DESIGNATION

SHEET NUMBER

DETAIL DESIGNATION

KILOWATT

INSIDE DIAMETER

INCHES

LINEAR FEET

LENGTH

POUND

MINIMUM

MANUFACTURER

MECHANICAL

MAXIMUM

THOUSAND BRITISH THERMAL

NOT APPLICABLE

MOUNTED

ON CENTER

NUMBER

NOT TO SCALE

NOMINAL

NORMALLY OPEN

OUTSIDE DIAMETER

NORMALLY CLOSED

PRESSURE DROP

PHASE

PRESSURE

POUNDS PER CUBIC FOOT

POUNDS PER SQ. IN. GAUGE

REQUIRED

SQUARE FEET

SQUARE

SPECIFICATIONS

SCHEDULE

REVOLUTIONS PER MINUTE

STEEL

STANDARD

TEMPERATURE

TOP OF PIPE

TYPICAL

IN

ID

DIAMETER

DEGREES FAHRENHEIT

DEGREES CELSIUS

AUTOMATIC CONTROL VALVE

L

LF

LB

ACV

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BUILDING

CENTERLINE

BRITISH THERMAL UNIT

CONCRETE

DRAIN

DIMENSION

DIAMETER

BOP

BTU

BTUH

BLDG

CL

CONC

DIM

DIA

D

EACH

EFFICIENCY

DRAWING

ELECTRICAL

ELEVATION

EQUIPMENT

EXHAUST

FEET

FLOOR

FEET PER MINUTE

EFF

EA

DWG

EQUIP

ELEC

EXH

FPM

FT

FLR

DOWNDN

STL

TEMP

TOP

TYP

SQ

SQFT

STD

SPECS

SCH

RPM

REQD

PH

PSIG

PRESS

PD

PCF

OD

OC

N/A

NO.

NTS

NOM

NO

NC

MTD

MIN

MFR

MECH

MBH

MAX

KW

VELOCITY

VENT

WITHOUT

VERTICAL

WITH

WIDTH

WATER GAUGE

WIDE FLANGE

V

W

GAUGE

GALLONS

HEAD

GALLONS PER HOUR

GALLONS PER MINUTE

HEIGHT

GRADE (GROUND LEVEL)

HERTZ

HOUR

GAL

G

HD

GRD

GPH

GPM

H

HZ

HR

W/O

WG

WF

W/

VERT

VEL

REVISION NUMBER

FOR CONTINUATION

UNITS PER HOUR

PER HOUR

CONNECT TO EXISTING

LIMIT OF REMOVAL

PRV PRESSURE REDUCING VALVE

STM STEAM

GENERIC ABBREVIATIONS

HPS HIGH PRESSURE SODIUM

FF FINISHED FLOOR

VITREOUS CLAYVC

CHWS CHILLED WATER SERVICE

MH MANHOLE

MIT MASSACHUSETTS INSTITUTE

OF TECHNOLOGY

RET RETAINING

ADJUSTABLEADJ

APPROX APPROXIMATE

ELEV, EL.

E.W. EACH WAY

CW COLD WATER

GLY GLYCOL

HW HOT WATER

C COMMON

HGS

HGR

HOT WATER GLYCOL SUPPLY

HOT WATER GLYCOL RETURN

HP HORSE POWER

JAN JANITOR

HWR

RM ROOM

MGMT MANAGEMENT

SS STAINLESS STEEL

WTR WATER

HOT WATER RECIRCULATION

SD

SMOKE DETECTOR

11 12 13

B

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

MEN’S

STEAM

MEN’S

SAUNA

MASSAGE

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

WOMEN’S L.R.

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

UP

UP

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\MD1.10 Building 1548 Plan PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

VD

VD

10x6

12x10

VD

VD

VD

VD

VDVD

18x14

24x12 x x x x

SD

x x

26x12 x

12x10

18x12

24x14 x x

VD

VD

VD

9x9 CSD

225 CFM

(TYP 2)

9x9 CSD

190 CFM

10x10

9x9 CSD

220 CFM

x

8x8 ER

100 CFM

10x4

12x12 CSD

300 CFM

12x12 CSD

300 CFM

10x6

220 CFM

12x12 CSD

300 CFM VD

VD

VD

8x8 ER

100 CFM

VD

14x6

18x12

14x12

9x9 CSD

130 CFM

(TYP 2)

12x12 ER

260 CFM

10x10 ER

190 CFM

14x8

VD

VD

VD

10x4

8x10

VD

VD

16x10

14x10

12x10

10x10

9x9 CSD

115 CFM

12x12 ER

300 CFM

(TYP 2)

9x9 CSD

125 CFM

(TYP 2)

14x8

6x6 CSD

75 CFM

6x6 CSD

75 CFM

225 CFM

VD

VD

VD

VD

9x9 CSD

150 CFM

10x6

8x6

10x8

12x8 ER

10x6 ER

100 CFM

(TYP 5)

12x8 ER

225 CFM

VD

10x10

9x9 CSD

125 CFM

(TYP 2)

12x12 ER

300 CFM

(TYP 2)

12x8 ER

225 CFM

VD

VD

VD

9x9 CSD

150 CFM

10x4

VD

10x6

14x6

12x8 ER

225 CFM

12x12 ER

16x8

150 CFM

9x9 CSD

150 CFM

VD

VD

100 CFM

8x8 ER

SUPPLY/RETURN DUCTS UP

THRU ROOF TO RTU-10 TO

BE REMOVED

EXISTING WALL

MTD HEATER

EXISTING WALL

MTD HEATER

REMOVE DUCTWORK TO

EXTENT SHOWN (TYP)

TO

RTU-10

EXIST 2"

GAS

REMOVE THIS SECTION

OF GAS SUPPLY TO

EXISTING RTU-10

N .T .S

N

SCALE: 1/8" = 1’-0"

MD1.1

FIRST FLOOR DEMOLITION PLAN

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

B U

IL

D

IN

G

F

IR

S T F

L O

M O

L

IT

IO

N P

L A

MD-1.10

A

11 12 13

B

N .T .S

B U

IL

D

IN

G

S

E C

O N

D F

L O

O R

D E

M O

L

IT

IO

N P

L A

N

SCALE: 1/8" = 1’-0"

MD1.2

SECOND FLOOR DEMOLITION PLAN

N

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

MD-1.20

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\MD1.20 Building 1548 Plan PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

RTU-10

EXISTING RTU-10 AND ALL

ASSOCIATED DUCT WORK AND

PIPING TO BE REMOVED

EXISTING LOUVERED SCREEN TO

BE REMOVED. SEE STRUCTURAL

DWGS FOR DETAILS AND EXTENT.

ACCESS LADDER

TO HIGH ROOF

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M1.10 Building 1548 Phase1 PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

F E

C A

11 12 13

B

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

MEN’S

STEAM

MEN’S

SAUNA

MASSAGE

WOMEN’S

TOILET ROOM

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

WOMEN’S L.R.

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

VD

VD

10x6

12x10

VD

VD

VD

VD

VDVD

18x14

24x12 x x x x

UP

UP

SD

x x

26x12 x

12x10

18x12

24x14 x

24x12

VD

VD

VD

9x9 CSD

225 CFM

(TYP 2)

9x9 CSD

190 CFM

10x10

9x9 CSD

220 CFM

x

8x8 ER

100 CFM

10x4

12x12 CSD

300 CFM

10x6

220 CFM

12x12 CSD

300 CFM VD

VD

VD

18x12

14x12

9x9 CSD

130 CFM

(TYP 2)

12x12 ER

260 CFM

10x10 ER

190 CFM

14x8

14x8

VD

VD

VD

VD

VD

VD

16x10

14x10

12x10

10x10

9x9 CSD

115 CFM

12x12 ER

300 CFM

(TYP 2)

9x9 CSD

125 CFM

(TYP 2)

14x8

6x6 CSD

75 CFM

6x6 CSD

75 CFM

VD

VD

VD

VD

9x9 CSD

150 CFM

10x6

8x6

10x6 ER

100 CFM

(TYP 5)

12x8 ER

225 CFM

VD

10x10

9x9 CSD

125 CFM

(TYP 2)

12x12 ER

300 CFM

(TYP 2)

12x8 ER

225 CFM

VD

VD

VD

9x9 CSD

150 CFM

10x4

VD

10x6

14x6

12x8 ER

225 CFM

12x12 ER

300 CFM

16x8

9x9 CSD

150 CFM

9x9 CSD

150 CFM

VD

VD

100 CFM

8x8 ER

MTD HEATER

EXISTING GAS

SUPPLY TO

EXISTING RTU-10

H

EMERGENCY DOOREMERGENCY DOOR

CAP

RTU-10

ACCESS LADDER

EXISTING LOUVERED SCREEN TO

BE REMOVED. SEE ARCHITECTURAL

DWGS FOR DETAILS.

PHASING NOTES:

PHASE 1- WOMEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM

THE MEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.

ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.

PHASE 1A- DISCONNECT WOMEN’S LOCKER ROOM AIR CONDITIONING SYSTEM

- REMOVE SECTION OF ACOUSTICAL CEILING TILES IN MEN’S LOCKER ROOM TO ACCESS THE

SUPPLY AND RETURN/EXHAUST DUCT SERVING THE WOMEN’S LOCKER ROOM. LOCKER AND

FLOORS SHALL BE PROTECTED WITH HEAVY DUTY POLYETHYLENE SHEETS.

- CUT AND CAP EXISTING SUPPLY AND EXHAUST DUCT SERVING THE WOMEN’S LOCKER ROOM

ABOVE THE CEILING OF THE MEN’S LOCKER ROOM.

- REBALANCE EXISTING RTU-10 AT 2500 CFM. PROVIDE ADDITIONAL DAMPERS AND/OR SHEAVES

AND BELTS TO ACHIEVE THE NEW AIR RATE.

- DEMOLISH SECTION OF DUCTWORK SERVING THE WOMEN’S LOCKER ROOM ABOVE THE CEILING

OF MEN’S LOCKER ROOM AND PENETRATING THE WALL ISOLATING THE TWO LOCKER ROOMS.

- FILL IN THE 8 INCH BLOCK WALL OPENINGS FOR THE REMOVED DUCTS AND SEAL.

- REINSTALL SECTION OF ACOUSTICAL CEILING TILE IN MEN’S LOCKER ROOM.

- CLEANUP ANY DEBRIS AND MAINTAIN THE MEN’S LOCKER ROOM.

THIS WORK SHALL BE ACCOMPLISHED AT NIGHT DURING THE UNOCCUPIED CYCLE - 8:00 PM TO 5:00 AM.

PHASE 1B - DEMOLISH DUCTWORK AND CEILINGS IN THE WOMEN’S LOCKER ROOM AND INSTALL

NEW STRUCTURAL STEEL TO SUPPORT THE NEW ROOF TOP AIR CONDITIONING UNIT RTU-10A

- DEMOLISH ACOUSTICAL CEILING TILES AND GRID IN THE WOMEN’S LOCKER ROOM, DV LOCKER

ROOM, AND CORRIDOR.

- REMOVE DUCTWORK AS INDICATED.

- INSTALL THE NEW STRUCTURAL STEEL IN THE WOMEN’S LOCKER ROOM.

THIS WORK CAN BE PERFORMED DURING NORMAL WORKING HOURS.

N .T .S

N

SCALE: 1/8" = 1’-0"

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

M-1.10

SCALE: 1/8" = 1’-0"

M4.1

M4.1

PHASE 1B ROOF PLAN

PHASE 1A/1B

M E

C H

A N

IC

A L B

U

IL

D

IN

G

P H

A S

E

A /1

B P

L A

N S

PHASE 1A/1B

FIRST FLOOR DEMOLITION PLAN

C A

11 12 13

B

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

MEN’S

STEAM

MEN’S

WOMEN’S

TOILET ROOM

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

WOMEN’S L.R.

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

VD

VD

10x6

12x10

VD

VD

VD

VD

VDVD

18x14

24x12 x x x x

UP

UP

SD

x x

26x12 x

12x10

18x12

24x14 x

VD

VD

9x9 CSD

225 CFM

(TYP 2)

9x9 CSD

190 CFM

10x10

9x9 CSD

220 CFM

x

8x8 ER

100 CFM

10x4

12x12 CSD

300 CFM

220 CFM

12x12 CSD

300 CFM VD

VD

VD

(TYP 2)

VD

VD

VD

VD

VD

16x10

14x10

12x10

10x10

9x9 CSD

115 CFM

9x9 CSD

125 CFM

(TYP 2)

14x8

VD

VD

VD

VD

VD

VD

9x9 CSD

150 CFM

10x6

8x6

10x6 ER

100 CFM

(TYP 5)

12x8 ER

225 CFM

VD

10x10

9x9 CSD

125 CFM

(TYP 2)

12x8 ER

225 CFM

VD

VD

VD

9x9 CSD

150 CFM

10x4

VD

10x6

14x6

12x8 ER

225 CFM

12x12 ER

300 CFM

16x8

9x9 CSD

150 CFM

9x9 CSD

150 CFM

VD

VD

14x6

14x6

10x4

8x8 ER

100 CFM

8x8 ER

MTD HEATER

12x6

14x8 x

B(250)

26x12

B(270)

B(350)

14x10

24x14

14x8

B(100)

10x6

A(300)

B(350)

12x6

REBALANCE EXISTING

EXHAUST REGISTER TO

275 CFM (TYP 2)

REBALANCE EXISTING

EXHAUST REGISTER TO

275 CFM (TYP 2)

A(350)

2" GAS UP

TO RTU-10A

VALVE

ECUH

CO

T

EMERGENCY DOOR EMERGENCY DOOR

RTU

10A

24x16

EXISTING ACCESS LADDER

2"GAS DN

PHASING NOTES:

PHASE 1 - WOMEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM

THE MEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.

ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.

PHASE 1C- INSTALL NEW ROOF TOP AIR CONDITIONING UNIT RTU-10A INCLUDING

ELECTRICAL AND GAS SERVICE

- INSTALL NEW CURB FOR RTU-10A.

- INSTALL NEW AIR CONDITIONING UNIT RTU-10A.

- RUN NEW CONDUIT AND WIRING FROM THE ELECTRICAL PANEL TO RTU-10A.

- CONNECT GAS LINE ABOVE THE CEILING OF THE MEN’S LOCKER ROOM AND

EXTEND TO RTU-10A.

- INSTALL NEW DUCTWORK AND DIFFUSERS AND REGISTERS.

- INSTALL NEW CONTROLS.

- INSTALL NEW CEILING.

- BALANCE THE AIR DISTRIBUTION SYSTEM AND RTU-10A.

- COMMISSION NEW AIR CONDITIONING UNIT RTU-10A AND CONTROLS.

ALL THE WORK IN AREAS OUTSIDE THE WOMEN’S LOCKER ROOM SHALL BE

ACCOMPLISHED AT NIGHT DURING THE UN-OCCUPIED CYCLE - 8:00 PM TO 5:00 AM.

PHASE 1D - INSTALL NEW FLOORING

- STRIP AND REMOVE EXISTING CARPET.

- REMOVE AND STORE EXISTING LOCKERS.

- INSTALL NEW VYNYL FLOORING.

- WORK CAN BE PERFORMED DURING NORMAL HOURS - 8:00 AM TO 5:00 PM.

1 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN HOLLOW WALL.

2 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN WIRE MOLD.

NOTES:

N .T .S

N

SCALE: 1/8" = 1’-0"

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

M-1.20

SCALE: 1/8" = 1’-0"

M4.2

M4.2

PHASE 1C FIRST FLOOR PLAN

PHASE 1B ROOF PLAN

PHASE 1C

M E

C H

A N

IC

A L B

U

IL

D

IN

G

P H

A S

E

B /1

C P

L A

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M1.20 Building 1548 Phase2 PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

C A

11 12 13

B

VD

VD

10x6

12x10

VD

VD

VD

VD

VDVD

18x14

24x12 x x x x

UP

UP

SD

x x

26x12 x

12x10

18x12

24x14 x

VD

VD

9x9 CSD

225 CFM

(TYP 2)

9x9 CSD

190 CFM

10x10

9x9 CSD

220 CFM

x

8x8 ER

100 CFM

10x4

12x12 CSD

300 CFM

220 CFM

12x12 CSD

300 CFM VD

VD

VD

VD

VD

VD

VD

VD

16x10

14x10

12x10

10x10

9x9 CSD

115 CFM

12x12 ER

300 CFM

(TYP 2)

9x9 CSD

125 CFM

(TYP 2)

14x8

6x6 CSD

75 CFM

VD

VD

VD

VD

VD

VD

9x9 CSD

150 CFM

10x6

8x6

10x6 ER

100 CFM

(TYP 5)

12x8 ER

225 CFM

VD

10x10

9x9 CSD

125 CFM

(TYP 2)

12x12 ER

300 CFM

(TYP 2)

12x8 ER

225 CFM

VD

VD

VD

9x9 CSD

150 CFM

10x4

VD

10x6

14x6

12x8 ER

225 CFM

12x12 ER

300 CFM

16x8

9x9 CSD

150 CFM

9x9 CSD

150 CFM

VD

VD

100 CFM

8x8 ER

MTD HEATER

x

B(250)

26x12

B(270)

24x14

14x8

B(100)

10x6

A(300)

SUPPLY/RETURN DUCTS UP

THRU ROOF TO RTU-10 TO

BE REMOVED

REMOVE THIS SECTION

OF GAS SUPPLY TO

EXISTING RTU-10

A(350)

2" GAS UP

TO RTU-10A

TO REMAIN 2

EMERGENCY DOOR EMERGENCY DOOR

RTU-10

EXISTING RTU-10 AND ALL

ASSOCIATED DUCT WORK AND

PIPING TO BE REMOVED

EXISTING ACCESS LADDER

PHASING NOTES:

PHASE 2- MEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM

THE WOMEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.

ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.

PHASE 2A - DEMOLISH DUCTWORK AND CEILINGS IN THE MEN’S LOCKER ROOM AND INSTALL NEW

STRUCTURAL STEEL TO SUPPORT THE NEW ROOF TOP AIR CONDITIONING UNIT RTU-10

- DEMOLISH EXISTING ROOF TOP UNIT RTU-10.

- DEMOLISH ACOUSTICAL CEILNG TILES AND GRID IN THE MEN’S LOCKER ROOM AND CORRIDOR.

- REMOVE DUCTWORK AS INDICATED.

- INSTALL NEW STRUCTURAL STEEL IN THE MEN’S LOCKER ROOM.

- THIS WORK CAN BE PERFORMED DURING NORMAL WORKING HOURS.

N .T .S

N

SCALE: 1/8" = 1’-0"

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

M-1.30

SCALE: 1/8" = 1’-0"

M4.3

M4.3

PHASE 2A ROOF PLAN

PHASE 2A

M E

C H

A N

IC

A L B

U

IL

D

IN

G

P H

A S

E

A P

L A

N S

PHASE 2A

FIRST FLOOR DEMOLITION PLAN

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M1.30 Building 1548 Phase3 PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M1.40 Building 1548 Phase4 PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

N

P R

O J E

C T N

U M

B E

R

M X

R D

-0

F E

C

A

11 12 13

B

STAIR

B

MEN’S

LOCKER ROOM

MEN’S

SHOWER

MEN’S

TOILET ROOM

WOMEN’S D.V.

LOCKER ROOM

WOMEN’S

LOCKER ROOM

WOMEN’S

SAUNA

WOMEN’S

STEAM

MEN’S

STEAM

MEN’S

WOMEN’S

TOILET ROOM

WOMEN’S

SHOWER

MENS D.V.

LOCKER ROOM

MEN’S L.R.

VESTIBULE

WOMEN’S L.R.

MEN’S

TOILET ROOM

MEN’S L.R.

CORRIDOR

WOMEN’S L.R.

CORRIDOR

VD

VD

10x6

VD

x x

UP

UP

x x

26x12

12x10

18x12

24x14 x

9x9 CSD

225 CFM

(TYP 2)

x

12x6

12x12 CSD

300 CFM

24x14 x

12x10

VD

VD

VD

12x10

10x10

9x9 CSD

125 CFM

(TYP 2)

14x8

VD VD

VD

VD

9x9 CSD

150 CFM

10x6

8x6

10x8 VD

10x6 ER

100 CFM

(TYP 5)

12x8 ER

225 CFM

VD

10x10

9x9 CSD

125 CFM

(TYP 2)

12x8 ER

225 CFM

VD

VD

VD

9x9 CSD

150 CFM

10x6

10x6

14x6

12x8 ER

225 CFM

12x12 ER

300 CFM

16x8

9x9 CSD

150 CFM

9x9 CSD

150 CFM

VD

VD

x

30x14

14x12

A(400)

(TYP 2)

14x8

14x12

A(300)

A(400)

B(500) B(500)

B(500)

B(100)

B(100)

10x6

12x8

B(100)

B(200)

10x6

A(300)

B(250)

26x12

ECUH

ECUH

EXIST RECESSED

UNIT HEATER

EXIST RECESSED

UNIT HEATER

B(270)

SUPPLY/RETURN

DUCTS UP THRU ROOF

TO RTU-10

A(225)

12x8

EXISTING 2"

TO RTU-10A

2" GAS UP

TO RTU-10

2" GAS UP

TO RTU-10A

SD

SD

14x10

24x14 x

A(350)

CO2

CO2

GAS VALVE

EMERGENCY DOOR EMERGENCY DOOR 11 12

RTU

20x24

20x24 EXHAUST DUCT UP TO

GOOSE NECK 3’-0" ABOVE

FINISHED ROOF

2" GAS DOWN

FLEXIBLE

CONNECTION

M-1.40

EXISTING ACCESS LADDER

TO HIGH ROOF

PHASE 2C - INSTALL NEW FLOORING

- STRIP AND REMOVE EXISTING CARPET.

- REMOVE AND STORE EXISTING LOCKERS.

- INSTALL NEW VYNYL FLOORING.

- WORK CAN BE PERFORMED DURING NORMAL HOURS - 8:00 AM TO 5:00 PM.

PHASING NOTES:

PHASE 2- MEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM

THE WOMEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.

ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.

PHASE 2B- INSTALL NEW ROOF TOP AIR CONDITIONING UNIT RTU-10 INCLUDING

ELECTRICAL AND GAS SERVICE

- DISCONNECT AND REMOVE EXISTING AIR CONDITIONING UNIT RTU-10.

- INSTALL NEW CURB FOR RTU-10.

- INSTALL NEW AIR CONDITIONING UNIT RTU-10.

- RUN NEW CONDUIT AND WIRING FROM THE ELECTRICAL PANEL TO RTU-10.

- CONNECT GAS LINE ABOVE THE CEILING OF THE MEN’S LOCKER ROOM AND

EXTEND TO RTU-10

- INSTALL NEW DUCTWORK AND DIFFUSERS AND REGISTERS.

- INSTALL NEW CONTROLS.

- INSTALL NEW CEILING.

- BALANCE THE AIR DISTRIBUTION SYSTEM AND RTU-10.

- COMMISSION NEW AIR CONDITIONING UNIT RTU-10 AND CONTROLS.

ALL THE WORK IN AREAS OUTSIDE THE MEN’S LOCKER ROOM SHALL BE ACCOMPLISHED

AT NIGHT DURING THE UN-OCCUPIED CYCLE - 10:00 PM TO 5:00 AM.

3’-0" MIN

FLEXIBLE

CONNECTION

o

ROOF DUCT

SUPPORT (TYP)

20x24

24"x16" RTU-10A EXHAUST

DUCT TERMINATE AT 45

WITH WIRE MESH

DUCT SUPPORT FOR WALL

ATTACHMENT. SEE STRUCTURAL

DWG S1.10

TERMINATE

GOOSENECK WITH

WIRE MESH

1 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN HOLLOW WALL.

NOTES:

N .T .S

N

SCALE: 1/8" = 1’-0"

0’ 8’4’ 16’ 24’ 32’

SCALE: 1/8" = 1’-0"

M-1.40

SCALE: 1/8" = 1’-0"

M4.4

M4.4

PHASE 2B ROOF PLAN

PHASE 2B/2C

PHASE 2B/2C FIRST FLOOR PLAN

SCALE: 1/8" = 1’-0"

SECTION

A A

M E

C H

A N

IC

A L B

U

IL

D

IN

G

P H

A S

E

B /2

C P

L A

M-2.10

N .T .S

M E

C H

A N

IC

A L S

C H

E D

U L E

S I

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M2.10 SCHEDULES PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

R

O J E

C T N

U M

B E

R

M X

R D

-0

ROWS

PACKAGED ROOFTOP AC UNITS W/HEAT RECOVERY WHEEL

DX COOLING COILSUPPLY AIR FAN

SERVICE

FILTERS

EXT. S.P.

(IN WG)

LOCATION

MEN’S

ROOF

CFM

HP

1.5 5

MOTOR

(CFM)

- MERV 13

O.A.

CAP.

139.3

(MBH)

78.6

EDB

TOTAL

65.7

EWB

54.2

LDB

53.4

LWB

EXHAUST FAN ELECTRICAL

CAPACITY

(CFM)

PRESS.

(IN. WG)

1.5

EXT. STATIC

V

HP

3 480

MOTOR

MCAO Hz

3 60 39.8

RTU

NOTES:

SYMBOL

RTU-10

BASED ON

REMARKS

MANUFACTURER

MODEL NO.

(AS STANDARD)

LOCKER ROOM

COMPRESSORS

NUMBER

2 5.5

EA.

TONNAGE

TYPE

SCROLL

TYPE

REFRIG.

410A

HEATING

201.8

(MBH)

REDUCTION

TONS

REDUCTION

ENERGY RECOVERY WHEEL

77 11

REFRIGERANT RE-HEAT

(MBH)

CAPACITY

LAT

70.5 NAT

GAS TYPE

(MBH)

INPUT

GAS FURNACE

GREENHECK EVR-4

MOC

WOMEN’S

ROOF 2500 1.5 5 - MERV 13 95.6 78.3 65.5 53.5 52.9 62500 1.5 2 480 3 60 26.2RTU-10A

BASED ON

1 -

LOCKER ROOM

2 4 SCROLL 410A 138.779 7.6 56.7 74.5 NAT 200

GREENHECK EVR-3

MOTOR

CEILING UNIT HEATER SCHEDULE (ELECTRIC)

LOCATION BTU/HRTYPE

(KW)

INPUT

CFM

T

AIR

HP RPM

ECUH

MANUFACTURER

(AS STANDARD)

MODEL NO.

ELECTRICAL

V HZ

REMARKS

NOTES:

SYMBOL

30010.2 - -3 - -ECUH-1 277 1 60

RECESSED

CLNG MOUNTED QMARK MODEL: CDF-SE-548

AMPS

10.8 1

PROVIDE WITH WALL MOUNTED THERMOSTAT.

MEN’S

LOCKER ROOM

30010.2 - -3 - -ECUH-2 277 1 60

QMARK MODEL: CDF-SE-548

10.8 1

WOMEN’S

LOCKER ROOM

RECESSED

CLNG MOUNTED

BASED ON

BASED ON

TITUS OMNI

TITUS OMNI

TITUS OMNI

REMARKSMODEL NO.

TITUS OMNI

MAX TP

(IN H2O)CFM

THROW @ MAX

MANUFACTURER

(AS STANDARD)

CFM

MATERIAL

SERVICE

SELECTION

(CFM)

RANGE

RETURN

RETURN

RETURN

150-324

325-499

500-650

0-149 2’x2’ LAY IN

CEILING

2’x2’ LAY IN

2’x2’ LAY IN

2’x2’ LAY IN

CEILING

CEILING

MOUNTING

DIFFUSER, GRILLE & REGISTER SCHEDULE

NC @ MAX

TYPE

B

NECK

SIZE

NOTES:

1 -

RETURN CEILING

TITUS TDC

TITUS TDC

TITUS TDC

--25

SUPPLY

SUPPLY

SUPPLY

250-374

125-249

A 0-124 - -

TITUS TDC--25SUPPLY375-500

2’x2’ LAY IN

CEILING

2’x2’ LAY IN

2’x2’ LAY IN

2’x2’ LAY IN

CEILING

CEILING

CEILING

SUPPLY EXHAUST

MERV 8

MERV 8

UNIT IS TO BE PROVIDED WITH 10 kW ELECTRIC PRE-HEATER.

ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM

UNIT TO BE SINGLE POINT POWER CONNECTION COMPLETE WITH UNIT MOUNTED DISCONNECT.

UNIT SCHEDULED AT NOMINAL CAPACITY. UNIT SHALL BE BALANCED FOR THE AIR RATE INDICATED ON PLANS.

M-3.10

N .T .S

M E

C H

A N

IC

A L D

E T

A

IL

S I

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M3.10 DETAILS PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

R

O J E

C T N

U M

B E

R

M X

R D

-0

AIR SPLIT DUCT TAKE-OFF

PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

AIR

FLOW

AIR

FLOW

O W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

ADJUSTABLE

METAL ROD OR

LINKAGE

SUPPLY REGISTER

VOLUME EXTRACTOR; ADJUSTABLE

FROM FULLY CLOSED POSITION

TO CFM NOTED ON FLOOR

PLANS

AIR

FLOW

1/4 W OR 4"

[100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

O W

PROVIDE VOLUME

DAMPER (TYP)

MAIN SUPPLY

DUCT

AIR

FLOW

PROVIDE VOLUME

DAMPER (TYP)

W

STRUCTURE (TYP)

DAMPER

SUPPLY

AIR

DUCT

VOLUME

MAX

5’- 0"

UNDERSIDE OF

SUPPORT FROM

HARD ELBOW

NOTES:

MAXIMUM SAG 1/2" PER FOOT.

LAY-IN CEILING DIFFUSER

CEILING

TAKEOFF DETAIL

SEE RECTANGULAR

TO ROUND BRANCH

METAL DUCT

FLEXIBLE RIGID

NTSSCALE:

CEILING DIFFUSER BRANCH DUCTS

NTSSCALE:

SUPPLY DUCTWORK TAKE-OFFS

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4"

[100mm] MIN.

BRANCH DUCT

VD

NTSSCALE:

EXHAUST OR RETURN BRANCH DUCTWORK

SCALE: NTS

DAMPER

1. "W" EQUALS REGISTER NECK DIMENSION.

RETURN/EXHAUST AIR REGISTER

OF CEILING STRUCTURE.

NOTES:

CEILING

2. HANG FROM ABOVE INDEPENDENT

RETURN/EXHAUST AIR REGISTER DETAIL

RETURN/EXHAUST

AIR DUCT

DUCT-SEE PLANS

FOR SIZES

W

WALL

W

SCALE: NTS

PROVIDE VOLUME

DAMPER (TYP)

SCALE: NTS

TYPICAL ROOF DUCT SUPPORT DETAIL

DUCT

MEMBRANE

ROOF

HIGH-DENSITY

POLYPROPYLENE

UV-RESISTANT

ROOF PAD

ADJUSTABLE, HOT-DIP

GALVANIZED, PERFORATED

STEEL SQUARE TUBE OR

C-CHANNEL FRAME. 11

8"

X 11

8" MINIMUM, 12 GAUGE

(TYP)

RTU - GAS CONNECTION DETAIL

RTU

DRIP LEG

ROOFTOP

UNIT

GAS

SUPPLY

UNION

FLEXIBLE

CONNECTION

COCK

M-3.20

N .T .S

C O

N T

R O

L D

E T

A

IL

S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

C

A

B

M A

R K

A P

P R

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T D

A T

E

D A

T E

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D R

A W

N B

Y

E

AIR

FORCEMAT R

I

ELCOMMAND

E R th A

IR

B

A S

E G

R O

U P /C

E C

E

B A

S E C

IV

IL

E

N G

IN

E E

R D

IV

IS

IO

N

H A

N S

C O

M A

F B

M A

D E

P A

R T

M E

N T O

F T

H E A

IR

F

O R

F

O R

C E

M A

T E

R

IE

L C

O M

M A

N D

S C

A L E

2 3 4 5

R:\50040783\50040789\CAD\Mech\Plot\M3.20 CONTROL DETAILS PLOT.dgn

7/27/2012

A N

S I

D

/0

/2

F A -0

-D -0

-0

D E

W B

E R

R Y

K R

F R

R

R O

C C

O R

O S

S I

D E

W B

E R

R Y

H A

N S

C O

M A

IR

F

O R

C E B

A S

E

S

U M

M E

R S

T R

E E

T

B O

S T

O N

M A

T

H F

L O

O R

23SHEET OF

/0

/2

R E

P A

IR

H

V

IL

D

IN

G

F

IT

N E

S S C

E N

T

R

O J E

C T N

U M

B E

R

M X

R D

-0

ITEM DESCRIPTION

EXISTING OPERATOR

WORKSTATIONS BLDG 1810

NETWORK RISER CONTROL SCHEMATIC DIAGRAM

RTU-1 RTU-10 GF-1 GF-2 ATS

GENER

GAS

METER

ELEC

METER

WATER

METER

UNT UNT TEC TEC UNT VMA VMA VMAUNT

N2 CONNECTION

IN EXISTING GYM

BLDG 1548

NEW RTU-10

NETWORK

CONTROLLER

NEW RTU-10A

NETWORK

CONTROLLER

RTU-10A

N2 BUS

RTU-10 AND RTU-10A DIAGRAM

DESCRIPTION

TYPE UNITS TREND ALARM TOTALIZE

SYSTEM

EXHAUST AIR DISCHARGE

VFD-E

PS3

OUTDOOR AIR INTAKE

EXHAUST AIR

EXHAUST

FAN

OADACCT

PS1

OA1

PS2

RETURN AIR INTAKE

SUPPLY AIR

SUPPLY AIR DISCHARGE

VFD-S

SUPPLY

FAN

VFD-W

P R

E H

E

O S

T

C O

N T

R O

L

S2

O U

T D

O

T E

R

C O

O L

IL

H

E H

E A

T

C O

IL

H E

A T

IN

G

S U

N S

O R

E X

H A

U

T E

R S

E N

E R

C O

V E

E E

L

MICROPROCESSOR CONTROLLER

ENERGY WHEEL MOTOR VFD

SUPPLY MOTOR VFD - MODULATING/MULTISPEED/CONSTANT

LONWORKS, BACNET MS/TP, BACNET IP, MODBUS RTU BMS INTERFACE

SUP-SENSOR MODULATING HOT GAS REHEAT TEMPERATURE SENSOR

EXHAUST MOTOR VFD - MODULATING/MULTISPEED/CONSTANT

OUTDOOR AIR DISCHARGE TEMPERATURE SENSOR

SUPPLY DAMPER ACTUATOR

ENERGY WHEEL PRESSURE SENSOR (FROST INDICATOR)

OUTDOOR AIR INTAKE TEMPERATURE SENSOR

ENERGY WHEEL ROTATION SENSOR

D2

OAD

OAI

D1

ACCT AFTER-COOLING COIL TEMPERATURE SENSOR

EXHAUST DAMPER ACTUATOR

PS1

VFD-S

VFD-W

DDC

VFD-E

PS2

PS3

S2

BO-2

BO-1

BO-4

BO-3

BI-6

BI-5

BI-8

BI-7

SOFTWARE BO

SOFTWARE SERIAL

SOFTWARE BO

SOFTWARE BO

SOFTWARE AO

SOFTWARE AI

SOFTWARE SERIAL

SOFTWARE AO

AI-6

AI-5

AO-1

AI-7

AI-2

AI-1

AI-4

AI-3

BI-2

BI-1

BI-4

BI-3

AO-3

AO-2

AO-5

AO-4

SUPPLY FAN COMMAND

EXHAUST FAN COMMAND

PRE-HEAT DEFROST COIL

EXHAUST AIR FILTER - DIRTY

OUTSIDE AIR DAMPER POSITION

EXHAUST AIR DAMPER POSITION

OUTSIDE AIR FILTER - DIRTY

DISCHARGE TEMPERATURE SETPOINT (CALCULATED)

HEATING LOCKOUT COMMAND

COOLING LOCKOUT COMMAND

OCCUPIED COMMAND

RTU-10A FULL COMMUNICATION WITH BMS

ZONE TEMPERATURE SETPOINT

NIGHT SETBACK SETPOINT

RTU-10 FULL COMMUNICATION WITH BMS

EXHAUST FAN STATUS

ENERGY RECOVERY WHEEL PRESSURE DROP

ENERGY RECOVERY WHEEL SPEED

EXHAUST AIR FAN SPEED

ZONE TEMPERATURE

SUPPLY FAN SPEED

MIXED AIR TEMPERATURE

DISCHARGE AIR TEMPERATURE

HEATING OUTPUT

SUPPLY FAN FAILURE

EXHAUST FAN FAILURE

SUPPLY FAN STATUS

EXHAUST FAN SPEED

COOLING OUTPUT

ENERGY RECOVERY WHEEL VFD SPEED CONTROL

SUPPLY FAN SPEED

X

X

X

X

X

X

X

X

X

OFF/ON

OFF/ON

DEG. F

DEG. F

UNOCC/OCC

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

DEG. F

OPEN/CLOSE

OPEN/CLOSE

OFF/ON

OFF/ON

CLOSE

OFF/ON

START/STOP

CLOSE

OFF/ON

AMPS

AMPS

IN. WG.

DDC

BMS INTERFACE

CONTROL SEQUENCE FOR RTU-10 AND RTU-10A

D1

D2 ZS

ZS

ZS DAMPER LIMIT SWITCH

OUTDOOR AIR FILTERS PRESSURE TRANSDUCER (DIRTY FILTER SENSOR)

EXHAUST AIR FILTERS PRESSURE TRANSDUCER (DIRTY FILTER SENSOR)

PACKAGE ROOF TOP AIR CONDITIONING UNITS RTU-10 AND RTU-10A - POINT LIST

BI-9

FORCE SHUT-DOWN XSTART/STOP

BI-10

SMOKE DETECTOR OFF/ON X

TROUBLE ALARM X

AI-8 CO2 INDICATOR PPM X

MICROPROCESSOR CONTROLLER: CONTROLLER SHALL BE PROVIDED WITH REQUIRED SENSORS AND PROGRAMMING FOR ENERGY RECOVERY UNIT. CONTROLLER

SHALL BE FACTORY PROGRAMMED, MOUNTED AND TESTED. CONTROLLER SHALL HAVE AN LCD READOUT FOR CHANGING SET POINTS AND MONITORING UNIT

OPERATION.

UNIT START COMMAND:

- FACTORY MOUNTED AND WIRED OUTDOOR AIR AND EXHAUST AIR DAMPER ACTUATORS ARE POWERED.

- EXHAUST FAN STARTS AFTER EXHAUST AIR DAMPER LIMIT SWITCH CONTACT IS CLOSED.

- SUPPLY FAN STARTS 5 SECONDS (ADJUSTABLE) AFTER SUPPLY AIR DAMPER LIMIT SWITCH CONTACT IS CLOSED.

- HEATING, COOLING AND WHEEL OPERATION PER BELOW.

UNIT STOP COMMAND (OR DE-ENERGIZED):

- SUPPLY FAN, EXHAUST FAN, TEMPERING OPTIONS AND WHEEL ARE DE-ENERGIZED.

- OUTDOOR AIR AND EXHAUST AIR DAMPER ACTUATORS ARE DE-ENERGIZED AND DAMPERS SPRING RETURN CLOSED.

- SUPPLY DUCT SMOKE DETECTOR.

REMOTE ON/OFF: UNIT DDC SHALL HAVE AN INPUT ALLOWING THE UNIT TO BE STARTED/STOPPED BY THE FACILITY BMS (JOHNSON CONTROLS FACILITY

MANAGEMENT SYSTEM).

OCCUPIED/UNOCCUPIED MODES: SHALL BE BASED ON A 7-DAY SCHEDULE AND SHALL BE SET BY THE BMS.

- OCCUPIED MODE:

1. SUPPLY FAN ON. 2. EXHAUST FAN ON. 3. HEATING PER BELOW. 4. COOLING PER BELOW. 5. WHEEL CONTROL PER BELOW.

- UNOCCUPIED MODE (CYCLE ON ROOM TEMPERATURE AND HUMIDITY):

COOLING SEQUENCE: THE COOLING IS CONTROLLED TO MAINTAIN THE SUPPLY TEMPERATURE SET POINT. THE MECHANICAL COOLING WILL BE LOCKED OUT

WHEN THE OUTSIDE AIR IS < 55

O

F - 2 O

F HYSTERESIS, ADJUSTABLE.

- PACKAGED DX COOLING: DDC WILL PROVIDE A DIGITAL SIGNAL FOR 1 OR 2 STAGES OF COOLING TO MAINTAIN THE SUPPLY AIR SET POINT (ADJ.).

THIS SIGNAL WILL COME WIRED TO THE FACTORY PROVIDED CONDENSING SECTION.

DEHUMIDIFICATION SEQUENCE: THE COOLING IS CONTROLLED TO MAINTAIN THE COOLING-COIL SET POINT. THE DEHUMIDIFICATION SEQUENCE WILL BE

LOCKED OUT WHEN THE OA IS <10 F ABOVE THE COLD-COIL SET POINT. THE MECHANICAL COOLING WILL BE LOCKED OUT WHEN THE OUTSIDE AIR IS

< 55 O

F - 2 O

F HYSTERESIS,…