MXRD 09-0071 Complete Plans.pdf
PDF 15 MB Posted
- Attached to
- Repair HVAC system at building 1548 Federal contract opportunity
- Solicitation number
- FA2835-12-R-0016
About this file
MXRD 09-0071 Complete Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.pdf | ||
| 1548 HVAC- Site Visit Questions.docx | DOCX document | |
| 1548 HVAC- Site Visit Questions.docx | DOCX document | |
| MXRD 09-0071 Complete Specifications.pdf | ||
| Wage Determination.pdf | ||
| RFP.pdf | ||
| RFP Cover Letter.pdf | ||
| bid schedule .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering and Design Section
66th Civil Engineering Squadron
Designed for:
USER
FIRE DEPARTMENT
SECURITY POLICE
SAFETY
COMMUNICATION / TELEPHONE
COMMUNICATION / LAN
BIOENVIRONMENTAL
ENVIRONMENTAL
GOVERNMENT REPRESENTATIVE
HANSCOM APPROVAL
UE CONFINIA
PE
NE
TR
A
M
UG
E
OGRAPHIAE SCIENTIAEQ
S
U N I
T E
D
TATES AIR
F O R
C E
ENGINEERI
N
G
UE CONFINIA
PE
NE
TR
A
M
UG
E
OGRAPHIAE SCIENTIAEQ
S
U N I
T E
D
STATES AIR
F O R
C E
ENGINEERI
N
GCIVIL
ELECTRONIC SYSTEMSCENT
E R
E
AIR
FORCEMAT R
I
ELCOMMAND
Department of the Air Force Air Force Materiel Command
Hanscom Air Force Base, MA
DEWBERRY-GOODKIND INC.
280 SUMMER ST.
BOSTON, MA 02110
STRUCTURAL MECHANICAL ELECTRICAL
Project Number: MXRD 09-0071
G-0.01
REPAIR HVAC FOR BLDG. 1548 FITNESS CENTER
Sheet 1 of 23
ARCHITECTURAL
MASSACHUSETTS
VERMONT NEW HAMPSHIRE
CONNECTICUT
RHODE
ISLAND
ATLANTIC OCEAN
BOSTON
BEDFORD
NASHUA
WORCESTER
SPRINGFIELD
HARTFORD
PLYMOUTH
NANTUCKET
MARTHA’S VINYARD
WILMINGTON
BEDFORD
LEXINGTON
ARLINGTON
BOSTON
BROOKLINE
DEDHAM
WEYMOUTH
HINGHAM
QUINCY
FRAMINGHAM
CONCORD
LYNN
SALEM
HANSCOM AFB
4th CLIFF
REC ANNEX
ATLANTIC OCEAN
T
W
S
IE
R R
A
T
T A
N G
O
T
W
J U L
IE
T
T
G O
L F
T
L P
H A
T/W ECHO
T
F
X T
R O
T
T
B R
A V
O
T
C H
A R
L
IE
T/W WHISKEY
T
M
IK
E
T
N
V E
M B
E R
T
T E
L
T/W ROMEO
15005
F O
R B E S
S T
R E E T
T1537
COLONIAL
PLACE
GRIFFISS STREET
ADAMS ROAD
5B
5A
2J
2F
2C
2D
2E1302
M
T1315
1813 1811
14 14
2A
T120515001
15006
15002
15004
T1851
GATE 4
15003
2B
1302K
T1137
T
IN
K E
O P
G R
E N
IE
R E
E T
S C
O
A D
PATRICK
LOOP
BESTIC
DRIVE
HAMILTON
STREET
KIRTLAND
STREET
T2424
ENT
ROAD
POPE
TERRACE
CLARK
CIRCLE
HILL
TERRACELIBERTY
LANE
PRESCOTT
PLACE
LIBERTY
LANE
CONSTITUTION
DRIVE
DAWES
TERRACE
FREEDOM
CIRCLE
HICKAM
LANE
2C110
2F
1102D 11201104
MASSACHUSETTS AVENUE
GATE 2
ANDREW’S
CIRCLE
OFFUTT
ROAD
2E
GATE 3
SOUTH L
AB
PARKING
GARAGE
LINCOLN
SCHOOL
T214
PLAYGROUND
SOCCER FIELD
KATAHDIN HILL
M O
N
P L
Y
O U
N D
P L
O U
N D
PLAY GROUND
PLAY GROUND
ATHLETIC
FIELD
ATHLETIC
FIELD
A T
H L E
T
IC
F
IE
L D
ATHLETIC
FIELD
P L
A Y
G R
O U
N D
P L
A Y
G R
O U
N D
B A S
K E
T B
A L L
C O
U R
T
B A S
K E
T B
A L L
C O
U R
T
O B
S C
U R
E
PLAYGROUND
EQUIPMENT
PLAYGROUND
EQUIPMENT
PLAYGROUND
EQUIPMENT
PLAYGROUND
EQUIPMENT
PLAYGROUND
EQUIPMENT
PLAYGROUND
EQUIPMENT
BASKET
BALL
COURT
MIN.
GOLF
GATE 2
GATE 3
GATE 4
Shawsheen Rive r
NELLIS
TERRACE
K A T
A H
D
IN
IL
L
PLA
YGROUND
B U S
BUS
B U S
B U S
B U S
BUS
B U
S
18251839
T1443
N E
X
IV
8 6 4 2
16 1 4 12
15 13 11 9 7 5 3 1
4 3
4 3 2 1
19 17
8 7 6 5
1 2 3 4
41 43 45 47 49
7 5 3 1
0 2
3 2
4 2
9 2
240524
KELLY
LANE
SCO
TT CIRCLE
HERIT
AGE R
OAD
PATRICK
PLACE
PATTERSON
ROAD
OTI
S
STREET
G R
E N
IE
R
S
T R
E E
T
DOW STREET
1312L
PLAYGROUND
EQUIP.
E G
L
IN
S
T R
E E T
GATE
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
BARKSDALE STREET
ARNO
LD
STREET
V A N
D E N B E
IV
E
CHENNAULT STREET
ROBINS STREET
HUNTER STREET
H A
R T
W E
V
E N
U E
W O
R E E
SCHILLING
CIR
CLE
RANDOLPH
R
OAD
WRIG
HT S
TREET
M A
R R
E T
T
S
T R
E E T
M A
R R
E T
T
S
T R
E E T
A
IR
P O
A D
H A
N S
C
IV
E
H A
N S
C
IV
E
H A
N S
C
IV
E
OLD BEDFORD ROAD
G R
IF
F
IS
R E
E T
K
IR
T L
A N
D
S T
R E
E T
CREDIT
UNION
EGLIN
STREET
BASE PLAN
N
HARTWELL AVE.
GATE
VICINITY PLAN
ROUTE 2A/ VANDENBERG GATE
AND VISITOR CENTER
225 128
INDEX
SHEET DRAWING DRAWING NAME
NUMBER NUMBER
G-0.02
N .T .S
L O
C A
T
IO
N P
L A
N D
R A
W
IN
G I
N D
E X
BLDG 1810
120 GRENIER ST.
BASE CIVIL ENGINEERING
BLDG 1604
BASE CONTRACTING
GENERAL NOTES
1.
THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT
REPRESENTATIVE AT LEAST 21 DAYS PRIOR TO AN INTENDED
SHUTDOWN OF ANY UTILITY. THE CONTRACTOR SHALL NOT
PROCEED WITH ANY UTILITY SHUTDOWN WITHOUT THE APPROVAL
OF THE GOVERNMENT REPRESENTATIVE. UTILITY SHUTDOWNS
SHALL BE CONFINED TO NIGHTS AND/OR WEEKENDS TO THE
FULLEST EXTENT POSSIBLE AND SHALL BE COORDINATED WITH
THE GOVERNMENT REPRESENTATIVE.
2.
3.
4. PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL
COORDINATE WITH THE GOVERNMENT REPRESENTATIVE AND THE
BASE ENERGY MANAGER TO ENSURE THAT PROVISIONS ARE MADE
TO COLLECT ENERGY AND WATER CONSUMPTION DATA AT
APPROPRIATE TIMES BEFORE, DURING AND AFTER THE WORK TO
ALLOW FOR THE ENERGY SAVINGS VERIFICATION.
5.
6.
EXISTING ROOF IS UNDER FIRESTONE WARRANTY UNTIL
6/01/2017. ANY REPAIR OR ALTERATION WORK SHALL BE
PERFORMED BY A FIRESTONE CERTIFIED CONTRACTOR.
THE CONTRACTOR SHALL PROVIDE ALL REQUIRED BARRICADES,
FLAGMEN, SIGNS AND/OR OTHER APPROVED DEVICES
NECESSARY TO PROPERLY PROTECT AND MAINTAIN PEDESTRIAN
AND VEHICULAR TRAFFIC IN ROADS AND PARKING LOTS AT ALL
TIMES DURING CONSTRUCTION.
SAFETY IS OF PARAMOUNT IMPORTANCE DURING THE
CONSTRUCTION OPERATION. PEDESTRIAN AND VEHICLE TRAFFIC
SHALL BE WARNED BY THE USE OF SIGNS, BARRICADES AND
OTHER MEANS. WHERE OPEN TRENCHES WILL INTERSECT EITHER
PEDESTRIAN WALKWAYS OR VEHICLE ROADWAYS, TEMPORARY
BRIDGES SHALL BE ERECTED FOR TRAFFIC MAINTENANCE. ALL
TRENCHES LEFT OPEN DURING NON-WORKING HOURS SHALL BE
ILLUMINATED AND BARRICADED. SECTIONS OF TRENCH THAT
REQUIRE BRIDGING WILL BE PERMITTED A MAXIMUM OF NINE (9)
HOURS FOR THE COMPLETION OF THIS TEMPORARY BRIDGING. AT
THE COMPLETION OF CONSTRUCTION THE CONTRACTOR SHALL
REMOVE ALL TEMPORARY BRIDGING, BARRICADES AND LIGHTING.
BLDG 1548
FITNESS CENTER
DOOR FRAMES ARE KNOWN TO CONTAIN TRACES OF LEAD.
CONTRACTOR SHALL COMPLY WITH MASSACHUSETTS DEP
REGULATIONS WHEN WORKING NEAR DOOR FRAMES.
7. CONTRACTORS SHALL CLEAN WORK AREAS DAILY.
1 G-0.01 COVER SHEET
2 G-0.02 LOCATION PLAN & DRAWING INDEX
3 G-0.03 BUILDING 1548 SITE PLAN
4 A-1.10 ARCHITECTURAL - BUILDING 1548 PLANS & ELEVATIONS
5 A-1.20 ARCHITECTURAL - BUILDING 1548 ROOF PLAN & DETAIL
6 A-1.30 ARCHITECTURAL - BUILDING 1548 ROOF DETAILS
7 S-1.10 STRUCTURAL - BUILDING 1548 ROOF PLAN & DETAILS
8 M-0.01 MECHANICAL - LEGEND & GENERAL NOTES
9 MD-1.10 MECHANICAL - BUILDING 1548 FIRST FLOOR DEMOLITION PLAN
10 MD-1.20 MECHANICAL - BUILDING 1548 SECOND FLOOR DEMOLITION PLAN
11 M-1.10 MECHANICAL - BUILDING 1548 PHASE 1A/1B PLANS
12 M-1.20 MECHANICAL - BUILDING 1548 PHASE 1B/1C PLANS
13 M-1.30 MECHANICAL - BUILDING 1548 PHASE 2A PLANS
14 M-1.40 MECHANICAL - BUILDING 1548 PHASE 2B/2C PLANS
15 M-2.10 MECHANICAL - SCHEDULES I
16 M-3.10 MECHANICAL - DETAILS I
17 M-3.20 CONTROL DETAILS
18 E-0.01 ELECTRICAL - LEGEND & GENERAL NOTES
19 E-1.10 ELECTRICAL - BUILDING 1548 ELECTRICAL PLAN
20 E-1.20 ELECTRICAL - BUILDING 1548 ROOF PLAN
21 E-1.30 ELECTRICAL - PANEL SCHEDULES
22 E-1.40 ELECTRICAL - MISCELLANEOUS SCHEDULES
23 E-1.50 ELECTRICAL - RISER DIAGRAMS
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
EL
ECTRONIC
SYSTEMS
CENT
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
IR
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\AA G0.2 General Sheet PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
U
IL
D
IN
G
F
IT
N E
S S C
E N
T
Property of the United States Air Force - For Official Use Only
P R
O J E
C T N
U M
B E
R
M X
R D
-0
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\AAA G0.03 Laydown Area PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
R
O J E
C T N
U M
B E
R
M X
R D
-0
LIGHT POLE
C H
K
N C
E
ELEC. BOX
G R
A N
IT
R B
GRANITE CURB
E D
V E
M E
N T
MARRETT STREET
TRANS.
ELEC.
B I
L
K
POLE
LIGHT
4 HOLE
SHED
SHED
E
W A
L K
L K
W A
L K
B
IT
C O
N C R E T E
S T E A
M
T R E N C
H
B I
L
K
C O
N C R E T E
C
U R B
S L
CB
CB
CB
CB
CB
CB
CB
S
E
P
C
LAYDOWN AREA NOTES:
1. LAYDOWN AREA INDICATED IS APPROXIMATE. CONTRACTOR SHALL COORDINATE WITH THE
GOVERNMENT REPRESENTATIVE TO ESTABLISH THE REQUIRED LAYDOWN AREA.
2. ALL DISTURBED AREAS SHALL BE RESEEDED AFTER ALL OTHER WORK IS COMPLETE.
BUILDING 1548
3. CONTRACTOR SHALL WATER AND MAINTAIN ALL RESEEDED AREAS AND SHALL APPLY ADDITIONAL
SEED AS NECESSARY UNTIL THE NEW GRASS IS ACCEPTED BY THE GOVERNMENT REPRESENTATIVE.
4. RESTORE AREA TO ORIGINAL CONDITIONS INCLUDING LOAM AND SEED.
5. CONTRACTOR ACCESS TO THE LOCKER ROOMS SHALL BE THROUGH THE REAR DOORS.
PROPOSED LAYDOWN AREA
(COORDINATE WITH HANSCOM
AFB FIRE DEPARTMENT)
6. CONTRACTOR TO MEET WITH THE GOVERNMENT REPRESENTATIVE TO SURVEY INITIAL CONDITIONS
OF THE LANDSCAPING, SIDEWALKS, DRAINAGE, DOORS, SIDING AND OTHER EXTERIOR FEATURES
PRIOR TO THE START OF WORK AND REPAIR ANY DAMAGES AT THE END OF PROJECT.
G-0.03
N
B U
IL
D
IN
G
S
IT
E P
L A
N
A S N
O T
E D
0’ 80’ 120’ 160’
PROPOSED LAYDOWN AREA
SCALE: 1" = 40’-0" G0.03
20’ 40’
SCALE: 1" = 40’-0"
9’-0"
7’-4"
SLOPESLOPE
SLOPESLOPE
11 12
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Arch\plot\A1.10 Building 1548 Plan PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
BLDG 1548
P R
O J E
C T N
U M
B E
R
M X
R D
-0
X’-X" CEILING HEIGHT
HVAC SUPPLY DIFFUSER, SEE
MECHANICAL DRAWINGS
2’x4’ SUSPENDED ACOUSTIC TILE
IN GRID SYSTEM, REFERENCE
NOTES
EXIT SIGN, REFERENCE NOTES
EXISTING CERAMIC FLOOR TILE
EXISTING CARPET TILE
EXISTING/NEW VINYL WALL BASE
NEW VINYL SHEET FLOORING
CT
VB
CPT
VSH
MTH
MTS
EXISTING MARBLE THRESHOLD
EXISTING METAL TRANSITION STRIP
S SPEAKER
SPRINKLER
M OCCUPANCY SENSOR
H.C.
ACT
GC
HANDICAP
ACOUSTICAL CEILING TILE
GENERAL CONTRACTOR
LEGEND
HVAC SUPPLY DIFFUSER, SEE
MECHANICAL DRAWINGS
ELEVATION INDICATOR
DETAIL INDICATOR
DRAWING BLOCK TITLE, TYPICAL
CENTER LINE
DRAWING BLOCK TITLE
1 1/2" = 1’-0"
C4 1 1/2’1/2’0 1’
A-512
D2
CL
C2
CORRIDOR
ROOM NAME AND NUMBER
1 COLUMN GRID
A4
A-201
BUILDING SECTION INDICATOR
9’-0"
9’-0"
9’-0"
9’-0"
9’-0"
9’-0"
9’-0"
9’-0"
9’-0" 9’-0"
8’-0"
8’-0"
7’-0"
7’-0"
8’-0"
9’-0"
7’-4"
7’-4"
7’-4"
9’-0"
7’-4"
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
STEAM MECH.
ROOM
MEN’S
STEAM
MEN’S
SAUNA
MASSAGE
WOMEN’S
TOILET ROOM
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
WOMEN’S L.R.
VESTIBULE
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
9’-0"
9’-0"
9’-0"
9’-0"
SEE NOTES 5, 6 & 7
IM
S
M
M
M
S
S
SM
M
SEE NOTE 10
SEE NOTE 10
SEE NOTES 5, 6, 7,
8 & 9
A A A A A A
A301
A-A
CORRUGATED METAL
MECHANICAL SCREEN
6’-6" ABOVE ROOF
EIFS COLOR #2
EIFS COLOR #1 EIFS COLOR #2
EIFS COLOR #1
EXTERIOR LIGHT
FIXTURE, TYP.GENERATOR ENCLOSURE
METAL COPING. TYP.
BRICK VENEER BASE,
TYP.
STEEL BOOT, TYP.
PAINTED SAME COLOR
AS BRICK BASE. SEE
DETAIL 2/A702
CONTROL JOINT,
TYP,
METAL COPING.
TYP.
AESTHETIC
GROOVE, TYP.
AESTHETIC
GROOVE, TYP.
EXTERIOR LIGHT
FIXTURE, TYP.
EQ. EQ.
EQ.EQ.
EQ. EQ. EQ. EQ. EQ.
METAL SCUPPER BOX AND
DOWNSPOUT, PAINT SAME
COLOR AS ADJACENT EIFS
CONTROL JOINT,
TYP,
A-1.20
+/-27’-9"
EXIST CORRUGATED METAL
MECHANICAL SCREEN TO
BE REMOVED. SEE DETAIL
EXIST CORRUGATED METAL
MECHANICAL SCREEN TO
BE REMOVED. SEE DETAIL
A A
EL. 128.38’
SECOND FLOOR
EL. 143.05’
T.O. MASONRY
EL. 161.05’
T.O. SLAB
FIRST FLOOR
T.O. SLAB
BRICK VENEER
SOLDIER COURSE, TYP.
BRICK VENEER
BASE, TYP.
ALUM. FRAME
METAL COPING.
TYP.
EIFS COLOR #2
METAL COPING. TYP.
GRADE VARIES
SEE CIVIL DWGS.
BRICK VENEER,
ROWLOCK COURSE, TYP.
GENERATOR ENCLOSURE
CONTROL JOINT,
TYP,
CONTROL JOINT,
TYP,
CONTROL JOINT,
TYP,
EQ. EQ.
6’-0"
EQ.
METAL SCUPPER BOX AND
DOWNSPOUT, PAINT SAME
COLOR AS ADJACENT EIFS
CORRUGATED METAL
MECHANICAL SCREEN
6’-6" ABOVE ROOF
UPUP
11 12
18’-6"
A-1.20
EXIST CORRUGATED METAL
MECHANICAL SCREEN TO
BE REMOVED. SEE DETAIL
NOTES:
1. REMOVE AND REINSTALL EXISTING LOCKERS AND INTEGRAL BASE
FOR REMOVAL OF CARPET TILE AND REPLACEMENT OF FLOOR
FINISH. GC TO VERIFY IN FIELD QUANTITY AND LOCATIONS. H.C.
LOCKERS TO BE PLACED IN CURRENT LOCATIONS.
2. REMOVE AND REINSTALL BENCHES AS REQUIRED FOR FLOOR
INSTALLATION.
3. REMOVE CARPET TILE TO BARE CONCRETE SLAB AND WALL BASE
ALONG ALL WALLS. REPLACE WITH SHEET VINYL FLOORING AND
VINYL WALL BASE. REPAIR PAINT DAMAGED WALLS WHERE THE
WALL BASE HAS BEEN REMOVED.
4. EXISTING THRESHOLDS AND TRANSITION STRIPS TO REMAIN.
BUILD UP SUBFLOOR WITH CEMENTITIOUS UNDERLAYMENT AS
REQUIRED TO MAKE SMOOTH AND FLUSH FINISH FLOOR
TRANSITION.
5. REMOVE CEILING GRID, ACT, LIGHTS, DIFFUSERS, CONDUITS,
PIPES, ETC. TO THE EXTENT REQUIRED TO INSTALL NEW HVAC
DUCT WORK AND PLUMBING WORK FROM NEW ROOF TOP UNITS
AND NEW STRUCTURE. CEILING GRID AND ACT TO BE REPLACED
WITH NEW.
6. EXISTING LIGHT FIXTURES TO BE REMOVED, STORED, CLEANED,
REINSTALLED AND RE-LAMPED.
7. INSTALL NEW CEILING GRID AND ACT.
8. REINSTALL LIGHTS, DIFFUSERS, CONDUITS, PIPES, ETC. AFTER ALL
HVAC AND PLUMBING WORK ABOVE IS COMPLETED TO SAME
HEIGHT AS PREVIOUS.
9. CONTRACTOR TO STORE ALL LIGHTS, DIFFUSERS, ETC. IN SAFE
PLACE UNTIL READY FOR REINSTALLATION.
10. REMOVE ALL CEILING MILDEW, PEELING PAINT AND DAMAGED
GYPSUM BOARD. PATCH AND REPLACE FOR SMOOTH TRANSITION
TO ADJACENT CEILING FINISH. REPAINT ENTIRE CEILING AREA
WITH MOLD AND MILDEW RESISTANT PAINT. MATCH EXISTING
PAINT COLOR AND SHEEN.
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
MEN’S
STEAM
MEN’S
SAUNA
MASSAGE
WOMEN’S
TOILET ROOM
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
SEE NOTE 2, TYP.
SEE NOTE 1, TYP.
SEE NOTE 4, TYP.
SEE NOTE 4, TYP.
SEE NOTE 3, TYP.
SEE NOTE 4, TYP.
SEE NOTE 3, TYP.
CT
CT
CT
CT
CT
CT
CT
CT
CT
L
IM
R K
VB
VB
VB
VB
VB
VB
VB
VB
VB VB
VB
VB
VB
VB
VB
CPT VSH/
CPT VSH/
CPT VSH/
CPT VSH/
CPT VSH/
MTS
M T S
MTSMTH
ALL SIDES
TYP.
EXISTING ALUM. THRESHOLD TO REMAIN, TYP.
SEE NOTE 1
VB
SEE NOTE 3
(TYP.)
VESTIBULE
WOMEN’S L.R.
SCALE: 1/8" = 1’-0"
A S N
O T
E D
SCALE: 1/8" = 1’-0"
SCALE: 1/8" = 1’-0"
SCALE: 1/8" = 1’-0"
4SOUTH ELEVATIONWEST ELEVATION
A1.10 A1.10
A1.10 A1.10
N
PARTIAL FIRST FLOOR PLAN PARTIAL FIRST FLOOR CEILING PLAN
B U
IL
D
IN
G
P
L A
N S E
L E
V A
T
IO
N S
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0" A-1.10
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Arch\plot\A1.20 Building 1548 Roof PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
SLOPE
TO DRAIN S
L
O P
E
A
IN
MEMBRANE
ROOFING
SCUPPER,
WALKWAY
PAD, TYP.
METAL COPING
11 12 13
VTR, SEE
PLUMB.
DWGS
INSULATION
CRICKET, TYP.
CORRUGATED METAL
MECHANICAL SCREEN
6’-6" ABOVE ROOF
SCUPPER BOX AND
DOWNSPOUT, TYPICAL
SEE DETAIL C/A702
4’-0" WIDE REMOVABLE
SECTION CORRUGATED METAL
MECHANICAL SCREEN
METAL STAIR
AND HANDRAIL
STEEL LADDER,
TYP. SEE
SECTION B/A142
1’-0"
27’-2"
EDGE OF MECHAINICAL
ROOF SCREEN BRACING
TAPERED
INSULATION,
TYP.
GALV. STEEL CHANNEL
12’-0" +/_ O.C. MAX.
REFER TO STRUC.
DWGS
GALV. STEEL CHANNEL.
REFER TO STRUC.
DWGS
.040" THICK EXTRUDED
ALUMINUM SCREEN
STRINGER, PAINTED
4’-0"
ALUMINUM SLATS SCREEN ATTACHED TO GALV.
STEEL STRUCTURE. PROVIDE MATCHING METAL
CORNER CAP AT EACH CORNER.
GALV. STEEL 45 DEG.
KNEE BRACE. SEE STRU.
DWGS.
PATCH & REPAIR
EIFS @ SCREEN
REMOVAL AREA
OF WALL
PROP. HVAC
UNIT
PROP. HVAC
UNIT
A-1.30
A-1.30
A-1.20
A-1.30A-1.30
NEW WALKWAY
PADS (TYP)
EXIST. LADDER
EXISTING
WALKWAY PADS
NOTE:
EXISTING ROOFING IS UNDER
WARRANTY. ALL ROOFING WORK
TO BE DONE BY CERTIFIED
ROOFING CONTRACTOR.
WARANTY IS TO BE MAINTAINED.
EXIST. HVAC UNIT
TO BE REMOVED
EXIST. EQUIPMENT SCREENING
AND ASSOCIATED BRACING TO
BE REMOVED
SEE SECTION 2
THIS DWG
20x24
20x24 UP
OSHA COMPLIANT STEEL TUBING NON PENETRATING
42"HIGH GUARDRAIL SYSTEM W/BRIGHT YELLOW
POWDER COAT FINISH. PROVIDE A 3’-0"x3’-0" 60MIL
UNCURED EPDM MEMBRANE UNDER EACH BASE.
DRAWING NOTES:
REMOVE EXISTING CURBING. PATCH AND REPAIR
OPENING TO MATCH EXISTING.
A-1.30
ROOF PENETRATION.
SEE STRUC. DWGS.
AND DETAIL
GENERAL NOTE:
1. ALL SCREEN SUPPORTS TO BE WATER TIGHT.
CAP AND SEAL ALL JOINTS.
CUT POST FLUSH TO
CURBING AND PROVIDE
EPDM METAL FLASHING
CUT POST FLUSH TO
CURBING AND PROVIDE
EPDM METAL FLASHING
EXISTING EQUIPMENT SCREEN AND
ASSOCIATED BRACING TO BE REMOVED
TO EXTENT SHOWN.
A-1.20
A S N
O T
E D
SCALE: 1/8" = 1’-0"
N
ROOF PLAN 2EQUIPMENT ROOF SCREEN DETAIL1
A-1.20 A-1.20
B U
IL
D
IN
G
R
O O
F P
L A
N D
E T
A
IL
SCALE: 1 1/2" = 1’-0"
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
METAL CURB
NON-SHRINK GROUT
EXISTING
ROOFING TO
REMAIN
EXIST SEALANT
2’-0"
MOLDED RUBBER WALK PAD
ADHERED TO MEMBRANE IN
ACCORDANCE WITH
MANUFACTURER’S
RECOMMENDATION’S
6"
EXIST. SINGLE-PLY MEMBRANE
ROOFING, FULLY ADHERED
EXIST. PROTECTION BOARD
EXIST. RIGID INSUL, MIN.
R-30, TYP.
EXIST. METAL DECK
EXIST. AIR/VAPOR BARRIER MEMBRANE
ON OVER METAL DECK
ALUMINUM FLASHING
LAP SEALANT
SPLICING CEMENT
PENETRATION
PROTECTION BOARD
FILLER AT PENETRATION
MEMBRANE FLASHING FULLY
ADHERED TO METAL CURB
SINGLE-PLY
MEMBRANE ROOFING,
FULLY ADHERED
1’-0" TYP.
3" MIN., TYP.
VARIES
P.T. WD. BLKG.
AT PERIM.
EXIST. METAL DECK
EXIST STEEL COL. ROOF SCREEN
SUPPORT TO BE REMOVED. CUT
POST FLUSH TO MTL CURBING.
RIGID INSUL, TYP.
AIR/VAPOR BARRIER
MEMBRANE OVER METAL
DECK
2" PRESSURE TREATED PLYWOOD
BLOCKING. FASTEN PLYWOOD TO
EXISTING CURBING. 60 MIL EPDM MEMBRANE
FLASHING
SELF ADHERING RUBERIZED
ASPHALTIC MEMBRANE TO BE
APPLIED OVER PLYWOOD.
MECHANICAL UNIT
METAL CAP FLASHING,
COORDINATE WITH
EQUIPMENT
MANUFACTURER
BONDING ADHESIVE
AND MEMBRANE
FLASHING
FASTENING PLATE
12" O.C. MAX.
SPLICING CEMENT
LAP SEALANT
PREFABRICATED METAL
EQUIPMENT CURB
AROUND PERIMETER
OF OPENING
PROTECTION BOARD
RIGID INSUL, MIN.
R-30, TYP.
AIR/VAPOR BARRIER
MEMBRANE ON OVER
METAL DECK
SINGLE-PLY
MEMBRANE
ROOFING, FULLY
ADHERED
RIGID INSUL.
P.T. WOOD NAILER BY
ROOFING CONTRACTOR
MEMBRANE FLASHING
RETURN (2" MIN)
NEOPRENE PAD
CONT. SEALANT AT
METAL CAP FLASHING
8"
EXISTING METAL
DECK, SEE STRUC.
DWGS
EXISTING STEEL
BEAM, SEE STRUC.
DWGS
2’-0"
EXTENT OF DEMO &
NEW WORK AT
PERIMETER OF UNIT
EXISTING ROOFING
TO REMAIN
NOTE:
ITEMS ON THIS PAGE ARE
PROPOSED UNLESS OTHERWISE
NOTED.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Arch\plot\A1.30 Building 1548 Roof Details PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
A-1.30
A S N
O T
E D
SCALE: 1 1/2" = 1’-0"
SCALE: 1 1/2" = 1’-0"
SCALE: 1 1/2" = 1’-0"
WALKWAY PAD DETAIL
ROOF PENETRATION DETAIL
A-1.20
ROOF TOP EQUIPMENT DETAIL
A-1.20
A-1.20
B U
IL
D
IN
G
R
O O
F D
E T
A
IL
S
0’ 1’
SCALE: 1 1/2" = 1’-0"
2’
8K1
8K1
8K1
8K1
8K1 1
M E
T A
L R
O
59’-4" LOW ROOF AREA
8"
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
RTU 10
11 12 13
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
4’-11"5’-4"
3’-4 2"
3’-6" 5’-0" 4’-4" 4’-4"
X
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
K C
S
S
L O
P E
D
4’-9" 4’-9"
4’-9"
4’-9" 4’-9 2"
REMOVABLE PANEL
ERV1
L1 L1 L1
T.O. JOIST BRG.
EL. 153.05’
T.O. JOIST BRG. EL.
141.05’ AT HIGH POINT
(2)- ROWS HORIZ.
BRIDGING T&B (TYP.)
6’-6" HIGH SCREEN
2" 20 GA.
METALROOF DECK
T.O. JOIST BRG.
EL. 140.38’
AT LOW POINT
EXISTING DRAIN
PIPE
EXIST. WALL REINF.
#6@16" @ 8" CMU
#8@16" @ 12" CMU
EXIST. CMU BEARING WALL
W/ALL CORES
SOLID GROUTED. SEE PLANS.
EXIST. WALL REINF.
#6@16" @ 8" CMU
#8@16" @ 12" CMU
T.O. PARAPET (TYP.)
EXIST. CMU BOND BEAM W/(2)- #6 @
8" & (3)- #6 @ 12".
EXIST. CMU BEARING WALL
W/ALL CORES
SOLID GROUTED. SEE PLANS.
EXIST. CONT. L3x3x3 5/16" DECK SUPPORT W/MECHANICAL
ANCHORS @ 24" O.C.
EXIST. EXTERIOR
FINISH (TYP.) EXIST. 1
2" METAL ROOF
DECK
EXIST. CONT. L7"x4"x
8" W/ CHEMICAL ANCHORS
@ 18" O.C.(MAX.)
METAL DECK SPAN
METAL DECK
B U
IL
D
IN
G
P
L A
N A
N D D
E T
A
IL
ROOF PLAN
SECTION
SECTION
DETAIL
SCALE: 1/8" = 1’-0"
SCALE: 3/4" = 1’-0"
S-1.10
SCALE: 3/4" = 1’-0"
S-1.10SCALE: 3/4" = 1’-0"
A
S-1.10
A S N
O T
E
S-1.10
SCALE: 3/4" = 1’-0"
TYPICAL WALL MOUNT
PROP. L3x3x1/4" x 4" LONG EACH SIDE OF DUCT AT
4’ O.C. W/ (1)- CHEMICAL ANCHORS (T MIN =
5,400 LB, V MIN = 5,800 LB) (TYP).
CONTRACTOR TO MINIMIZE GAP BETWEEN HVAC DUCT
AND EXISTING PIPE. NOT TO EXCEED 3".
CONTRACTOR TO COORDINATE CONNECTION OF
PROPOSED HVAC DUCT TO WALL MOUNT.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Struct\Building\Plot\S1.10 HVAC on Roof PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
S-1.10
PROP. 20KCS3 TO BE PLACED
ADJACENT TO EXISTING JOISTS
(TYP. 3 PER HVAC UNIT, 6 TOTAL)
STEEL BRACING ANGLES
AT HVAC ROOF OPENING,
SEE DETAIL A
ROOF OPENING
TYP. COORDINATE
WITH MECH.
EQUIP. MFG
PHASE 1
PHASE 2
PROP. HVAC UNIT
(SEE MECH DWGS)
(TYP. 2)
EXIST. STEEL FRAME OPENING TO
BE MODIFIED AS REQUIRED TO FIT
NEW UNIT
1/8 1"
(TYP)
PROP. 20KCS3
JOIST
PROP. 38" GUSSET PL. CENTERED UNDER EACH JOIST
W/ (4)- CHEMICAL ANCHORS AT 4" O.C. (T MIN =
5,400 LB, V MIN = 5,800 LB) (TYP).
SEE PLAN
S-1.10
OPENING TO SUIT EQUIPMENT
SEE PLANS FOR LOCATION
L5x5x 4"
L5x5x 4"
L x x
L x x
C/C JOIST
CLIP L6x4x 8"
NOTE:
DETAIL SIMILAR AT EQUIPMENT
SUPPORT ANGLES.
S-1.10
PROP. 20KCS3 TO BE PLACED
ADJACENT TO EXISTING JOISTS
(TYP. 3 PER HVAC UNIT, 6 TOTAL)
STEEL BRACING ANGLES
AT HVAC ROOF OPENING,
SEE DETAIL A
ROOF OPENING
TYP. COORDINATE
WITH MECH.
EQUIP. MFG
PHASE 1
PHASE 2
PROP. HVAC UNIT
(SEE MECH DWGS)
(TYP. 2)
EXIST. STEEL FRAME OPENING TO
BE MODIFIED AS REQUIRED TO FIT
NEW UNIT
M-0.01
N .T .S
L E
G E
N D G
E N
E R
A L N
O T
E S
DN
DN
UP
UP
D
R
DNUP
BDD
FC
10x8
VD
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
EXISTING DUCT TO REMAIN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION,
OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE
OR RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH X DEPTH)
MANUAL VOLUME DAMPER
BACK DRAFT DAMPER
DUCTWORK SYMBOLS
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M0.01 General Notes PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
R
O J E
C T N
U M
B E
R
M X
R D
-0
M.X
M.X
CALL OUT SYMBOLS
SYSTEM OR SERVICE (ie LPS)
SYMBOL DESIGNATES ASSOCIATED
REFER TO DRAWINGS (XXX)
SHEET NUMBER
SECTION DESIGNATION
SHEET NUMBER
DETAIL DESIGNATION
KILOWATT
INSIDE DIAMETER
INCHES
LINEAR FEET
LENGTH
POUND
MINIMUM
MANUFACTURER
MECHANICAL
MAXIMUM
THOUSAND BRITISH THERMAL
NOT APPLICABLE
MOUNTED
ON CENTER
NUMBER
NOT TO SCALE
NOMINAL
NORMALLY OPEN
OUTSIDE DIAMETER
NORMALLY CLOSED
PRESSURE DROP
PHASE
PRESSURE
POUNDS PER CUBIC FOOT
POUNDS PER SQ. IN. GAUGE
REQUIRED
SQUARE FEET
SQUARE
SPECIFICATIONS
SCHEDULE
REVOLUTIONS PER MINUTE
STEEL
STANDARD
TEMPERATURE
TOP OF PIPE
TYPICAL
IN
ID
DIAMETER
DEGREES FAHRENHEIT
DEGREES CELSIUS
AUTOMATIC CONTROL VALVE
L
LF
LB
ACV
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BUILDING
CENTERLINE
BRITISH THERMAL UNIT
CONCRETE
DRAIN
DIMENSION
DIAMETER
BOP
BTU
BTUH
BLDG
CL
CONC
DIM
DIA
D
EACH
EFFICIENCY
DRAWING
ELECTRICAL
ELEVATION
EQUIPMENT
EXHAUST
FEET
FLOOR
FEET PER MINUTE
EFF
EA
DWG
EQUIP
ELEC
EXH
FPM
FT
FLR
DOWNDN
STL
TEMP
TOP
TYP
SQ
SQFT
STD
SPECS
SCH
RPM
REQD
PH
PSIG
PRESS
PD
PCF
OD
OC
N/A
NO.
NTS
NOM
NO
NC
MTD
MIN
MFR
MECH
MBH
MAX
KW
VELOCITY
VENT
WITHOUT
VERTICAL
WITH
WIDTH
WATER GAUGE
WIDE FLANGE
V
W
GAUGE
GALLONS
HEAD
GALLONS PER HOUR
GALLONS PER MINUTE
HEIGHT
GRADE (GROUND LEVEL)
HERTZ
HOUR
GAL
G
HD
GRD
GPH
GPM
H
HZ
HR
W/O
WG
WF
W/
VERT
VEL
REVISION NUMBER
FOR CONTINUATION
UNITS PER HOUR
PER HOUR
CONNECT TO EXISTING
LIMIT OF REMOVAL
PRV PRESSURE REDUCING VALVE
STM STEAM
GENERIC ABBREVIATIONS
HPS HIGH PRESSURE SODIUM
FF FINISHED FLOOR
VITREOUS CLAYVC
CHWS CHILLED WATER SERVICE
MH MANHOLE
MIT MASSACHUSETTS INSTITUTE
OF TECHNOLOGY
RET RETAINING
ADJUSTABLEADJ
APPROX APPROXIMATE
ELEV, EL.
E.W. EACH WAY
CW COLD WATER
GLY GLYCOL
HW HOT WATER
C COMMON
HGS
HGR
HOT WATER GLYCOL SUPPLY
HOT WATER GLYCOL RETURN
HP HORSE POWER
JAN JANITOR
HWR
RM ROOM
MGMT MANAGEMENT
SS STAINLESS STEEL
WTR WATER
HOT WATER RECIRCULATION
SD
SMOKE DETECTOR
11 12 13
B
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
MEN’S
STEAM
MEN’S
SAUNA
MASSAGE
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
WOMEN’S L.R.
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
UP
UP
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\MD1.10 Building 1548 Plan PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
VD
VD
10x6
12x10
VD
VD
VD
VD
VDVD
18x14
24x12 x x x x
SD
x x
26x12 x
12x10
18x12
24x14 x x
VD
VD
VD
9x9 CSD
225 CFM
(TYP 2)
9x9 CSD
190 CFM
10x10
9x9 CSD
220 CFM
x
8x8 ER
100 CFM
10x4
12x12 CSD
300 CFM
12x12 CSD
300 CFM
10x6
220 CFM
12x12 CSD
300 CFM VD
VD
VD
8x8 ER
100 CFM
VD
14x6
18x12
14x12
9x9 CSD
130 CFM
(TYP 2)
12x12 ER
260 CFM
10x10 ER
190 CFM
14x8
VD
VD
VD
10x4
8x10
VD
VD
16x10
14x10
12x10
10x10
9x9 CSD
115 CFM
12x12 ER
300 CFM
(TYP 2)
9x9 CSD
125 CFM
(TYP 2)
14x8
6x6 CSD
75 CFM
6x6 CSD
75 CFM
225 CFM
VD
VD
VD
VD
9x9 CSD
150 CFM
10x6
8x6
10x8
12x8 ER
10x6 ER
100 CFM
(TYP 5)
12x8 ER
225 CFM
VD
10x10
9x9 CSD
125 CFM
(TYP 2)
12x12 ER
300 CFM
(TYP 2)
12x8 ER
225 CFM
VD
VD
VD
9x9 CSD
150 CFM
10x4
VD
10x6
14x6
12x8 ER
225 CFM
12x12 ER
16x8
150 CFM
9x9 CSD
150 CFM
VD
VD
100 CFM
8x8 ER
SUPPLY/RETURN DUCTS UP
THRU ROOF TO RTU-10 TO
BE REMOVED
EXISTING WALL
MTD HEATER
EXISTING WALL
MTD HEATER
REMOVE DUCTWORK TO
EXTENT SHOWN (TYP)
TO
RTU-10
EXIST 2"
GAS
REMOVE THIS SECTION
OF GAS SUPPLY TO
EXISTING RTU-10
N .T .S
N
SCALE: 1/8" = 1’-0"
MD1.1
FIRST FLOOR DEMOLITION PLAN
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
B U
IL
D
IN
G
F
IR
S T F
L O
M O
L
IT
IO
N P
L A
MD-1.10
A
11 12 13
B
N .T .S
B U
IL
D
IN
G
S
E C
O N
D F
L O
O R
D E
M O
L
IT
IO
N P
L A
N
SCALE: 1/8" = 1’-0"
MD1.2
SECOND FLOOR DEMOLITION PLAN
N
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
MD-1.20
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\MD1.20 Building 1548 Plan PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
RTU-10
EXISTING RTU-10 AND ALL
ASSOCIATED DUCT WORK AND
PIPING TO BE REMOVED
EXISTING LOUVERED SCREEN TO
BE REMOVED. SEE STRUCTURAL
DWGS FOR DETAILS AND EXTENT.
ACCESS LADDER
TO HIGH ROOF
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M1.10 Building 1548 Phase1 PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
F E
C A
11 12 13
B
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
MEN’S
STEAM
MEN’S
SAUNA
MASSAGE
WOMEN’S
TOILET ROOM
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
WOMEN’S L.R.
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
VD
VD
10x6
12x10
VD
VD
VD
VD
VDVD
18x14
24x12 x x x x
UP
UP
SD
x x
26x12 x
12x10
18x12
24x14 x
24x12
VD
VD
VD
9x9 CSD
225 CFM
(TYP 2)
9x9 CSD
190 CFM
10x10
9x9 CSD
220 CFM
x
8x8 ER
100 CFM
10x4
12x12 CSD
300 CFM
10x6
220 CFM
12x12 CSD
300 CFM VD
VD
VD
18x12
14x12
9x9 CSD
130 CFM
(TYP 2)
12x12 ER
260 CFM
10x10 ER
190 CFM
14x8
14x8
VD
VD
VD
VD
VD
VD
16x10
14x10
12x10
10x10
9x9 CSD
115 CFM
12x12 ER
300 CFM
(TYP 2)
9x9 CSD
125 CFM
(TYP 2)
14x8
6x6 CSD
75 CFM
6x6 CSD
75 CFM
VD
VD
VD
VD
9x9 CSD
150 CFM
10x6
8x6
10x6 ER
100 CFM
(TYP 5)
12x8 ER
225 CFM
VD
10x10
9x9 CSD
125 CFM
(TYP 2)
12x12 ER
300 CFM
(TYP 2)
12x8 ER
225 CFM
VD
VD
VD
9x9 CSD
150 CFM
10x4
VD
10x6
14x6
12x8 ER
225 CFM
12x12 ER
300 CFM
16x8
9x9 CSD
150 CFM
9x9 CSD
150 CFM
VD
VD
100 CFM
8x8 ER
MTD HEATER
EXISTING GAS
SUPPLY TO
EXISTING RTU-10
H
EMERGENCY DOOREMERGENCY DOOR
CAP
RTU-10
ACCESS LADDER
EXISTING LOUVERED SCREEN TO
BE REMOVED. SEE ARCHITECTURAL
DWGS FOR DETAILS.
PHASING NOTES:
PHASE 1- WOMEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM
THE MEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.
ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.
PHASE 1A- DISCONNECT WOMEN’S LOCKER ROOM AIR CONDITIONING SYSTEM
- REMOVE SECTION OF ACOUSTICAL CEILING TILES IN MEN’S LOCKER ROOM TO ACCESS THE
SUPPLY AND RETURN/EXHAUST DUCT SERVING THE WOMEN’S LOCKER ROOM. LOCKER AND
FLOORS SHALL BE PROTECTED WITH HEAVY DUTY POLYETHYLENE SHEETS.
- CUT AND CAP EXISTING SUPPLY AND EXHAUST DUCT SERVING THE WOMEN’S LOCKER ROOM
ABOVE THE CEILING OF THE MEN’S LOCKER ROOM.
- REBALANCE EXISTING RTU-10 AT 2500 CFM. PROVIDE ADDITIONAL DAMPERS AND/OR SHEAVES
AND BELTS TO ACHIEVE THE NEW AIR RATE.
- DEMOLISH SECTION OF DUCTWORK SERVING THE WOMEN’S LOCKER ROOM ABOVE THE CEILING
OF MEN’S LOCKER ROOM AND PENETRATING THE WALL ISOLATING THE TWO LOCKER ROOMS.
- FILL IN THE 8 INCH BLOCK WALL OPENINGS FOR THE REMOVED DUCTS AND SEAL.
- REINSTALL SECTION OF ACOUSTICAL CEILING TILE IN MEN’S LOCKER ROOM.
- CLEANUP ANY DEBRIS AND MAINTAIN THE MEN’S LOCKER ROOM.
THIS WORK SHALL BE ACCOMPLISHED AT NIGHT DURING THE UNOCCUPIED CYCLE - 8:00 PM TO 5:00 AM.
PHASE 1B - DEMOLISH DUCTWORK AND CEILINGS IN THE WOMEN’S LOCKER ROOM AND INSTALL
NEW STRUCTURAL STEEL TO SUPPORT THE NEW ROOF TOP AIR CONDITIONING UNIT RTU-10A
- DEMOLISH ACOUSTICAL CEILING TILES AND GRID IN THE WOMEN’S LOCKER ROOM, DV LOCKER
ROOM, AND CORRIDOR.
- REMOVE DUCTWORK AS INDICATED.
- INSTALL THE NEW STRUCTURAL STEEL IN THE WOMEN’S LOCKER ROOM.
THIS WORK CAN BE PERFORMED DURING NORMAL WORKING HOURS.
N .T .S
N
SCALE: 1/8" = 1’-0"
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
M-1.10
SCALE: 1/8" = 1’-0"
M4.1
M4.1
PHASE 1B ROOF PLAN
PHASE 1A/1B
M E
C H
A N
IC
A L B
U
IL
D
IN
G
P H
A S
E
A /1
B P
L A
N S
PHASE 1A/1B
FIRST FLOOR DEMOLITION PLAN
C A
11 12 13
B
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
MEN’S
STEAM
MEN’S
WOMEN’S
TOILET ROOM
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
WOMEN’S L.R.
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
VD
VD
10x6
12x10
VD
VD
VD
VD
VDVD
18x14
24x12 x x x x
UP
UP
SD
x x
26x12 x
12x10
18x12
24x14 x
VD
VD
9x9 CSD
225 CFM
(TYP 2)
9x9 CSD
190 CFM
10x10
9x9 CSD
220 CFM
x
8x8 ER
100 CFM
10x4
12x12 CSD
300 CFM
220 CFM
12x12 CSD
300 CFM VD
VD
VD
(TYP 2)
VD
VD
VD
VD
VD
16x10
14x10
12x10
10x10
9x9 CSD
115 CFM
9x9 CSD
125 CFM
(TYP 2)
14x8
VD
VD
VD
VD
VD
VD
9x9 CSD
150 CFM
10x6
8x6
10x6 ER
100 CFM
(TYP 5)
12x8 ER
225 CFM
VD
10x10
9x9 CSD
125 CFM
(TYP 2)
12x8 ER
225 CFM
VD
VD
VD
9x9 CSD
150 CFM
10x4
VD
10x6
14x6
12x8 ER
225 CFM
12x12 ER
300 CFM
16x8
9x9 CSD
150 CFM
9x9 CSD
150 CFM
VD
VD
14x6
14x6
10x4
8x8 ER
100 CFM
8x8 ER
MTD HEATER
12x6
14x8 x
B(250)
26x12
B(270)
B(350)
14x10
24x14
14x8
B(100)
10x6
A(300)
B(350)
12x6
REBALANCE EXISTING
EXHAUST REGISTER TO
275 CFM (TYP 2)
REBALANCE EXISTING
EXHAUST REGISTER TO
275 CFM (TYP 2)
A(350)
2" GAS UP
TO RTU-10A
VALVE
ECUH
CO
T
EMERGENCY DOOR EMERGENCY DOOR
RTU
10A
24x16
EXISTING ACCESS LADDER
2"GAS DN
PHASING NOTES:
PHASE 1 - WOMEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM
THE MEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.
ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.
PHASE 1C- INSTALL NEW ROOF TOP AIR CONDITIONING UNIT RTU-10A INCLUDING
ELECTRICAL AND GAS SERVICE
- INSTALL NEW CURB FOR RTU-10A.
- INSTALL NEW AIR CONDITIONING UNIT RTU-10A.
- RUN NEW CONDUIT AND WIRING FROM THE ELECTRICAL PANEL TO RTU-10A.
- CONNECT GAS LINE ABOVE THE CEILING OF THE MEN’S LOCKER ROOM AND
EXTEND TO RTU-10A.
- INSTALL NEW DUCTWORK AND DIFFUSERS AND REGISTERS.
- INSTALL NEW CONTROLS.
- INSTALL NEW CEILING.
- BALANCE THE AIR DISTRIBUTION SYSTEM AND RTU-10A.
- COMMISSION NEW AIR CONDITIONING UNIT RTU-10A AND CONTROLS.
ALL THE WORK IN AREAS OUTSIDE THE WOMEN’S LOCKER ROOM SHALL BE
ACCOMPLISHED AT NIGHT DURING THE UN-OCCUPIED CYCLE - 8:00 PM TO 5:00 AM.
PHASE 1D - INSTALL NEW FLOORING
- STRIP AND REMOVE EXISTING CARPET.
- REMOVE AND STORE EXISTING LOCKERS.
- INSTALL NEW VYNYL FLOORING.
- WORK CAN BE PERFORMED DURING NORMAL HOURS - 8:00 AM TO 5:00 PM.
1 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN HOLLOW WALL.
2 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN WIRE MOLD.
NOTES:
N .T .S
N
SCALE: 1/8" = 1’-0"
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
M-1.20
SCALE: 1/8" = 1’-0"
M4.2
M4.2
PHASE 1C FIRST FLOOR PLAN
PHASE 1B ROOF PLAN
PHASE 1C
M E
C H
A N
IC
A L B
U
IL
D
IN
G
P H
A S
E
B /1
C P
L A
N S
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M1.20 Building 1548 Phase2 PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
C A
11 12 13
B
VD
VD
10x6
12x10
VD
VD
VD
VD
VDVD
18x14
24x12 x x x x
UP
UP
SD
x x
26x12 x
12x10
18x12
24x14 x
VD
VD
9x9 CSD
225 CFM
(TYP 2)
9x9 CSD
190 CFM
10x10
9x9 CSD
220 CFM
x
8x8 ER
100 CFM
10x4
12x12 CSD
300 CFM
220 CFM
12x12 CSD
300 CFM VD
VD
VD
VD
VD
VD
VD
VD
16x10
14x10
12x10
10x10
9x9 CSD
115 CFM
12x12 ER
300 CFM
(TYP 2)
9x9 CSD
125 CFM
(TYP 2)
14x8
6x6 CSD
75 CFM
VD
VD
VD
VD
VD
VD
9x9 CSD
150 CFM
10x6
8x6
10x6 ER
100 CFM
(TYP 5)
12x8 ER
225 CFM
VD
10x10
9x9 CSD
125 CFM
(TYP 2)
12x12 ER
300 CFM
(TYP 2)
12x8 ER
225 CFM
VD
VD
VD
9x9 CSD
150 CFM
10x4
VD
10x6
14x6
12x8 ER
225 CFM
12x12 ER
300 CFM
16x8
9x9 CSD
150 CFM
9x9 CSD
150 CFM
VD
VD
100 CFM
8x8 ER
MTD HEATER
x
B(250)
26x12
B(270)
24x14
14x8
B(100)
10x6
A(300)
SUPPLY/RETURN DUCTS UP
THRU ROOF TO RTU-10 TO
BE REMOVED
REMOVE THIS SECTION
OF GAS SUPPLY TO
EXISTING RTU-10
A(350)
2" GAS UP
TO RTU-10A
TO REMAIN 2
EMERGENCY DOOR EMERGENCY DOOR
RTU-10
EXISTING RTU-10 AND ALL
ASSOCIATED DUCT WORK AND
PIPING TO BE REMOVED
EXISTING ACCESS LADDER
PHASING NOTES:
PHASE 2- MEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM
THE WOMEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.
ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.
PHASE 2A - DEMOLISH DUCTWORK AND CEILINGS IN THE MEN’S LOCKER ROOM AND INSTALL NEW
STRUCTURAL STEEL TO SUPPORT THE NEW ROOF TOP AIR CONDITIONING UNIT RTU-10
- DEMOLISH EXISTING ROOF TOP UNIT RTU-10.
- DEMOLISH ACOUSTICAL CEILNG TILES AND GRID IN THE MEN’S LOCKER ROOM AND CORRIDOR.
- REMOVE DUCTWORK AS INDICATED.
- INSTALL NEW STRUCTURAL STEEL IN THE MEN’S LOCKER ROOM.
- THIS WORK CAN BE PERFORMED DURING NORMAL WORKING HOURS.
N .T .S
N
SCALE: 1/8" = 1’-0"
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
M-1.30
SCALE: 1/8" = 1’-0"
M4.3
M4.3
PHASE 2A ROOF PLAN
PHASE 2A
M E
C H
A N
IC
A L B
U
IL
D
IN
G
P H
A S
E
A P
L A
N S
PHASE 2A
FIRST FLOOR DEMOLITION PLAN
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M1.30 Building 1548 Phase3 PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M1.40 Building 1548 Phase4 PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
N
P R
O J E
C T N
U M
B E
R
M X
R D
-0
F E
C
A
11 12 13
B
STAIR
B
MEN’S
LOCKER ROOM
MEN’S
SHOWER
MEN’S
TOILET ROOM
WOMEN’S D.V.
LOCKER ROOM
WOMEN’S
LOCKER ROOM
WOMEN’S
SAUNA
WOMEN’S
STEAM
MEN’S
STEAM
MEN’S
WOMEN’S
TOILET ROOM
WOMEN’S
SHOWER
MENS D.V.
LOCKER ROOM
MEN’S L.R.
VESTIBULE
WOMEN’S L.R.
MEN’S
TOILET ROOM
MEN’S L.R.
CORRIDOR
WOMEN’S L.R.
CORRIDOR
VD
VD
10x6
VD
x x
UP
UP
x x
26x12
12x10
18x12
24x14 x
9x9 CSD
225 CFM
(TYP 2)
x
12x6
12x12 CSD
300 CFM
24x14 x
12x10
VD
VD
VD
12x10
10x10
9x9 CSD
125 CFM
(TYP 2)
14x8
VD VD
VD
VD
9x9 CSD
150 CFM
10x6
8x6
10x8 VD
10x6 ER
100 CFM
(TYP 5)
12x8 ER
225 CFM
VD
10x10
9x9 CSD
125 CFM
(TYP 2)
12x8 ER
225 CFM
VD
VD
VD
9x9 CSD
150 CFM
10x6
10x6
14x6
12x8 ER
225 CFM
12x12 ER
300 CFM
16x8
9x9 CSD
150 CFM
9x9 CSD
150 CFM
VD
VD
x
30x14
14x12
A(400)
(TYP 2)
14x8
14x12
A(300)
A(400)
B(500) B(500)
B(500)
B(100)
B(100)
10x6
12x8
B(100)
B(200)
10x6
A(300)
B(250)
26x12
ECUH
ECUH
EXIST RECESSED
UNIT HEATER
EXIST RECESSED
UNIT HEATER
B(270)
SUPPLY/RETURN
DUCTS UP THRU ROOF
TO RTU-10
A(225)
12x8
EXISTING 2"
TO RTU-10A
2" GAS UP
TO RTU-10
2" GAS UP
TO RTU-10A
SD
SD
14x10
24x14 x
A(350)
CO2
CO2
GAS VALVE
EMERGENCY DOOR EMERGENCY DOOR 11 12
RTU
20x24
20x24 EXHAUST DUCT UP TO
GOOSE NECK 3’-0" ABOVE
FINISHED ROOF
2" GAS DOWN
FLEXIBLE
CONNECTION
M-1.40
EXISTING ACCESS LADDER
TO HIGH ROOF
PHASE 2C - INSTALL NEW FLOORING
- STRIP AND REMOVE EXISTING CARPET.
- REMOVE AND STORE EXISTING LOCKERS.
- INSTALL NEW VYNYL FLOORING.
- WORK CAN BE PERFORMED DURING NORMAL HOURS - 8:00 AM TO 5:00 PM.
PHASING NOTES:
PHASE 2- MEN’S LOCKER ROOM NEW AIR CONDITIONING SYSTEM
THE WOMEN’S LOCKER ROOM SHALL BE OPERATIONAL AT ALL TIMES DURING THIS PHASE.
ALL CONTRACTOR ACCESS TO BUILDING 1548 SHALL BE VIA THE EMERGENCY (REAR) DOORS.
PHASE 2B- INSTALL NEW ROOF TOP AIR CONDITIONING UNIT RTU-10 INCLUDING
ELECTRICAL AND GAS SERVICE
- DISCONNECT AND REMOVE EXISTING AIR CONDITIONING UNIT RTU-10.
- INSTALL NEW CURB FOR RTU-10.
- INSTALL NEW AIR CONDITIONING UNIT RTU-10.
- RUN NEW CONDUIT AND WIRING FROM THE ELECTRICAL PANEL TO RTU-10.
- CONNECT GAS LINE ABOVE THE CEILING OF THE MEN’S LOCKER ROOM AND
EXTEND TO RTU-10
- INSTALL NEW DUCTWORK AND DIFFUSERS AND REGISTERS.
- INSTALL NEW CONTROLS.
- INSTALL NEW CEILING.
- BALANCE THE AIR DISTRIBUTION SYSTEM AND RTU-10.
- COMMISSION NEW AIR CONDITIONING UNIT RTU-10 AND CONTROLS.
ALL THE WORK IN AREAS OUTSIDE THE MEN’S LOCKER ROOM SHALL BE ACCOMPLISHED
AT NIGHT DURING THE UN-OCCUPIED CYCLE - 10:00 PM TO 5:00 AM.
3’-0" MIN
FLEXIBLE
CONNECTION
o
ROOF DUCT
SUPPORT (TYP)
20x24
24"x16" RTU-10A EXHAUST
DUCT TERMINATE AT 45
WITH WIRE MESH
DUCT SUPPORT FOR WALL
ATTACHMENT. SEE STRUCTURAL
DWG S1.10
TERMINATE
GOOSENECK WITH
WIRE MESH
1 - CONTROL WIRING FOR THE ROOM SENSOR TO BE RUN IN HOLLOW WALL.
NOTES:
N .T .S
N
SCALE: 1/8" = 1’-0"
0’ 8’4’ 16’ 24’ 32’
SCALE: 1/8" = 1’-0"
M-1.40
SCALE: 1/8" = 1’-0"
M4.4
M4.4
PHASE 2B ROOF PLAN
PHASE 2B/2C
PHASE 2B/2C FIRST FLOOR PLAN
SCALE: 1/8" = 1’-0"
SECTION
A A
M E
C H
A N
IC
A L B
U
IL
D
IN
G
P H
A S
E
B /2
C P
L A
M-2.10
N .T .S
M E
C H
A N
IC
A L S
C H
E D
U L E
S I
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M2.10 SCHEDULES PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
R
O J E
C T N
U M
B E
R
M X
R D
-0
ROWS
PACKAGED ROOFTOP AC UNITS W/HEAT RECOVERY WHEEL
DX COOLING COILSUPPLY AIR FAN
SERVICE
FILTERS
EXT. S.P.
(IN WG)
LOCATION
MEN’S
ROOF
CFM
HP
1.5 5
MOTOR
(CFM)
- MERV 13
O.A.
CAP.
139.3
(MBH)
78.6
EDB
TOTAL
65.7
EWB
54.2
LDB
53.4
LWB
EXHAUST FAN ELECTRICAL
CAPACITY
(CFM)
PRESS.
(IN. WG)
1.5
EXT. STATIC
V
HP
3 480
MOTOR
MCAO Hz
3 60 39.8
RTU
NOTES:
SYMBOL
RTU-10
BASED ON
REMARKS
MANUFACTURER
MODEL NO.
(AS STANDARD)
LOCKER ROOM
COMPRESSORS
NUMBER
2 5.5
EA.
TONNAGE
TYPE
SCROLL
TYPE
REFRIG.
410A
HEATING
201.8
(MBH)
REDUCTION
TONS
REDUCTION
ENERGY RECOVERY WHEEL
77 11
REFRIGERANT RE-HEAT
(MBH)
CAPACITY
LAT
70.5 NAT
GAS TYPE
(MBH)
INPUT
GAS FURNACE
GREENHECK EVR-4
MOC
WOMEN’S
ROOF 2500 1.5 5 - MERV 13 95.6 78.3 65.5 53.5 52.9 62500 1.5 2 480 3 60 26.2RTU-10A
BASED ON
1 -
LOCKER ROOM
2 4 SCROLL 410A 138.779 7.6 56.7 74.5 NAT 200
GREENHECK EVR-3
MOTOR
CEILING UNIT HEATER SCHEDULE (ELECTRIC)
LOCATION BTU/HRTYPE
(KW)
INPUT
CFM
T
AIR
HP RPM
ECUH
MANUFACTURER
(AS STANDARD)
MODEL NO.
ELECTRICAL
V HZ
REMARKS
NOTES:
SYMBOL
30010.2 - -3 - -ECUH-1 277 1 60
RECESSED
CLNG MOUNTED QMARK MODEL: CDF-SE-548
AMPS
10.8 1
PROVIDE WITH WALL MOUNTED THERMOSTAT.
MEN’S
LOCKER ROOM
30010.2 - -3 - -ECUH-2 277 1 60
QMARK MODEL: CDF-SE-548
10.8 1
WOMEN’S
LOCKER ROOM
RECESSED
CLNG MOUNTED
BASED ON
BASED ON
TITUS OMNI
TITUS OMNI
TITUS OMNI
REMARKSMODEL NO.
TITUS OMNI
MAX TP
(IN H2O)CFM
THROW @ MAX
MANUFACTURER
(AS STANDARD)
CFM
MATERIAL
SERVICE
SELECTION
(CFM)
RANGE
RETURN
RETURN
RETURN
150-324
325-499
500-650
0-149 2’x2’ LAY IN
CEILING
2’x2’ LAY IN
2’x2’ LAY IN
2’x2’ LAY IN
CEILING
CEILING
MOUNTING
DIFFUSER, GRILLE & REGISTER SCHEDULE
NC @ MAX
TYPE
B
NECK
SIZE
NOTES:
1 -
RETURN CEILING
TITUS TDC
TITUS TDC
TITUS TDC
--25
SUPPLY
SUPPLY
SUPPLY
250-374
125-249
A 0-124 - -
TITUS TDC--25SUPPLY375-500
2’x2’ LAY IN
CEILING
2’x2’ LAY IN
2’x2’ LAY IN
2’x2’ LAY IN
CEILING
CEILING
CEILING
SUPPLY EXHAUST
MERV 8
MERV 8
UNIT IS TO BE PROVIDED WITH 10 kW ELECTRIC PRE-HEATER.
ALUMINUM
ALUMINUM
ALUMINUM
ALUMINUM
ALUMINUM
ALUMINUM
ALUMINUM
ALUMINUM
UNIT TO BE SINGLE POINT POWER CONNECTION COMPLETE WITH UNIT MOUNTED DISCONNECT.
UNIT SCHEDULED AT NOMINAL CAPACITY. UNIT SHALL BE BALANCED FOR THE AIR RATE INDICATED ON PLANS.
M-3.10
N .T .S
M E
C H
A N
IC
A L D
E T
A
IL
S I
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M3.10 DETAILS PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
R
O J E
C T N
U M
B E
R
M X
R D
-0
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
AIR
FLOW
AIR
FLOW
O W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
ADJUSTABLE
METAL ROD OR
LINKAGE
SUPPLY REGISTER
VOLUME EXTRACTOR; ADJUSTABLE
FROM FULLY CLOSED POSITION
TO CFM NOTED ON FLOOR
PLANS
AIR
FLOW
1/4 W OR 4"
[100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
O W
PROVIDE VOLUME
DAMPER (TYP)
MAIN SUPPLY
DUCT
AIR
FLOW
PROVIDE VOLUME
DAMPER (TYP)
W
STRUCTURE (TYP)
DAMPER
SUPPLY
AIR
DUCT
VOLUME
MAX
5’- 0"
UNDERSIDE OF
SUPPORT FROM
HARD ELBOW
NOTES:
MAXIMUM SAG 1/2" PER FOOT.
LAY-IN CEILING DIFFUSER
CEILING
TAKEOFF DETAIL
SEE RECTANGULAR
TO ROUND BRANCH
METAL DUCT
FLEXIBLE RIGID
NTSSCALE:
CEILING DIFFUSER BRANCH DUCTS
NTSSCALE:
SUPPLY DUCTWORK TAKE-OFFS
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4"
[100mm] MIN.
BRANCH DUCT
VD
NTSSCALE:
EXHAUST OR RETURN BRANCH DUCTWORK
SCALE: NTS
DAMPER
1. "W" EQUALS REGISTER NECK DIMENSION.
RETURN/EXHAUST AIR REGISTER
OF CEILING STRUCTURE.
NOTES:
CEILING
2. HANG FROM ABOVE INDEPENDENT
RETURN/EXHAUST AIR REGISTER DETAIL
RETURN/EXHAUST
AIR DUCT
DUCT-SEE PLANS
FOR SIZES
W
WALL
W
SCALE: NTS
PROVIDE VOLUME
DAMPER (TYP)
SCALE: NTS
TYPICAL ROOF DUCT SUPPORT DETAIL
DUCT
MEMBRANE
ROOF
HIGH-DENSITY
POLYPROPYLENE
UV-RESISTANT
ROOF PAD
ADJUSTABLE, HOT-DIP
GALVANIZED, PERFORATED
STEEL SQUARE TUBE OR
C-CHANNEL FRAME. 11
8"
X 11
8" MINIMUM, 12 GAUGE
(TYP)
RTU - GAS CONNECTION DETAIL
RTU
DRIP LEG
ROOFTOP
UNIT
GAS
SUPPLY
UNION
FLEXIBLE
CONNECTION
COCK
M-3.20
N .T .S
C O
N T
R O
L D
E T
A
IL
S
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
C
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T D
A T
E
D A
T E
C O
N T
R A
C T N
O
SHEET
IDENTIFICATION
D R
A W
N B
Y
E
AIR
FORCEMAT R
I
ELCOMMAND
E R th A
IR
B
A S
E G
R O
U P /C
E C
E
B A
S E C
IV
IL
E
N G
IN
E E
R D
IV
IS
IO
N
H A
N S
C O
M A
F B
M A
D E
P A
R T
M E
N T O
F T
H E A
IR
F
O R
F
O R
C E
M A
T E
R
IE
L C
O M
M A
N D
S C
A L E
2 3 4 5
R:\50040783\50040789\CAD\Mech\Plot\M3.20 CONTROL DETAILS PLOT.dgn
7/27/2012
A N
S I
D
/0
/2
F A -0
-D -0
-0
D E
W B
E R
R Y
K R
F R
R
R O
C C
O R
O S
S I
D E
W B
E R
R Y
H A
N S
C O
M A
IR
F
O R
C E B
A S
E
S
U M
M E
R S
T R
E E
T
B O
S T
O N
M A
T
H F
L O
O R
23SHEET OF
/0
/2
R E
P A
IR
H
V
IL
D
IN
G
F
IT
N E
S S C
E N
T
R
O J E
C T N
U M
B E
R
M X
R D
-0
ITEM DESCRIPTION
EXISTING OPERATOR
WORKSTATIONS BLDG 1810
NETWORK RISER CONTROL SCHEMATIC DIAGRAM
RTU-1 RTU-10 GF-1 GF-2 ATS
GENER
GAS
METER
ELEC
METER
WATER
METER
UNT UNT TEC TEC UNT VMA VMA VMAUNT
N2 CONNECTION
IN EXISTING GYM
BLDG 1548
NEW RTU-10
NETWORK
CONTROLLER
NEW RTU-10A
NETWORK
CONTROLLER
RTU-10A
N2 BUS
RTU-10 AND RTU-10A DIAGRAM
DESCRIPTION
TYPE UNITS TREND ALARM TOTALIZE
SYSTEM
EXHAUST AIR DISCHARGE
VFD-E
PS3
OUTDOOR AIR INTAKE
EXHAUST AIR
EXHAUST
FAN
OADACCT
PS1
OA1
PS2
RETURN AIR INTAKE
SUPPLY AIR
SUPPLY AIR DISCHARGE
VFD-S
SUPPLY
FAN
VFD-W
P R
E H
E
O S
T
C O
N T
R O
L
S2
O U
T D
O
T E
R
C O
O L
IL
H
E H
E A
T
C O
IL
H E
A T
IN
G
S U
N S
O R
E X
H A
U
T E
R S
E N
E R
C O
V E
E E
L
MICROPROCESSOR CONTROLLER
ENERGY WHEEL MOTOR VFD
SUPPLY MOTOR VFD - MODULATING/MULTISPEED/CONSTANT
LONWORKS, BACNET MS/TP, BACNET IP, MODBUS RTU BMS INTERFACE
SUP-SENSOR MODULATING HOT GAS REHEAT TEMPERATURE SENSOR
EXHAUST MOTOR VFD - MODULATING/MULTISPEED/CONSTANT
OUTDOOR AIR DISCHARGE TEMPERATURE SENSOR
SUPPLY DAMPER ACTUATOR
ENERGY WHEEL PRESSURE SENSOR (FROST INDICATOR)
OUTDOOR AIR INTAKE TEMPERATURE SENSOR
ENERGY WHEEL ROTATION SENSOR
D2
OAD
OAI
D1
ACCT AFTER-COOLING COIL TEMPERATURE SENSOR
EXHAUST DAMPER ACTUATOR
PS1
VFD-S
VFD-W
DDC
VFD-E
PS2
PS3
S2
BO-2
BO-1
BO-4
BO-3
BI-6
BI-5
BI-8
BI-7
SOFTWARE BO
SOFTWARE SERIAL
SOFTWARE BO
SOFTWARE BO
SOFTWARE AO
SOFTWARE AI
SOFTWARE SERIAL
SOFTWARE AO
AI-6
AI-5
AO-1
AI-7
AI-2
AI-1
AI-4
AI-3
BI-2
BI-1
BI-4
BI-3
AO-3
AO-2
AO-5
AO-4
SUPPLY FAN COMMAND
EXHAUST FAN COMMAND
PRE-HEAT DEFROST COIL
EXHAUST AIR FILTER - DIRTY
OUTSIDE AIR DAMPER POSITION
EXHAUST AIR DAMPER POSITION
OUTSIDE AIR FILTER - DIRTY
DISCHARGE TEMPERATURE SETPOINT (CALCULATED)
HEATING LOCKOUT COMMAND
COOLING LOCKOUT COMMAND
OCCUPIED COMMAND
RTU-10A FULL COMMUNICATION WITH BMS
ZONE TEMPERATURE SETPOINT
NIGHT SETBACK SETPOINT
RTU-10 FULL COMMUNICATION WITH BMS
EXHAUST FAN STATUS
ENERGY RECOVERY WHEEL PRESSURE DROP
ENERGY RECOVERY WHEEL SPEED
EXHAUST AIR FAN SPEED
ZONE TEMPERATURE
SUPPLY FAN SPEED
MIXED AIR TEMPERATURE
DISCHARGE AIR TEMPERATURE
HEATING OUTPUT
SUPPLY FAN FAILURE
EXHAUST FAN FAILURE
SUPPLY FAN STATUS
EXHAUST FAN SPEED
COOLING OUTPUT
ENERGY RECOVERY WHEEL VFD SPEED CONTROL
SUPPLY FAN SPEED
X
X
X
X
X
X
X
X
X
OFF/ON
OFF/ON
DEG. F
DEG. F
UNOCC/OCC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DEG. F
OPEN/CLOSE
OPEN/CLOSE
OFF/ON
OFF/ON
CLOSE
OFF/ON
START/STOP
CLOSE
OFF/ON
AMPS
AMPS
IN. WG.
DDC
BMS INTERFACE
CONTROL SEQUENCE FOR RTU-10 AND RTU-10A
D1
D2 ZS
ZS
ZS DAMPER LIMIT SWITCH
OUTDOOR AIR FILTERS PRESSURE TRANSDUCER (DIRTY FILTER SENSOR)
EXHAUST AIR FILTERS PRESSURE TRANSDUCER (DIRTY FILTER SENSOR)
PACKAGE ROOF TOP AIR CONDITIONING UNITS RTU-10 AND RTU-10A - POINT LIST
BI-9
FORCE SHUT-DOWN XSTART/STOP
BI-10
SMOKE DETECTOR OFF/ON X
TROUBLE ALARM X
AI-8 CO2 INDICATOR PPM X
MICROPROCESSOR CONTROLLER: CONTROLLER SHALL BE PROVIDED WITH REQUIRED SENSORS AND PROGRAMMING FOR ENERGY RECOVERY UNIT. CONTROLLER
SHALL BE FACTORY PROGRAMMED, MOUNTED AND TESTED. CONTROLLER SHALL HAVE AN LCD READOUT FOR CHANGING SET POINTS AND MONITORING UNIT
OPERATION.
UNIT START COMMAND:
- FACTORY MOUNTED AND WIRED OUTDOOR AIR AND EXHAUST AIR DAMPER ACTUATORS ARE POWERED.
- EXHAUST FAN STARTS AFTER EXHAUST AIR DAMPER LIMIT SWITCH CONTACT IS CLOSED.
- SUPPLY FAN STARTS 5 SECONDS (ADJUSTABLE) AFTER SUPPLY AIR DAMPER LIMIT SWITCH CONTACT IS CLOSED.
- HEATING, COOLING AND WHEEL OPERATION PER BELOW.
UNIT STOP COMMAND (OR DE-ENERGIZED):
- SUPPLY FAN, EXHAUST FAN, TEMPERING OPTIONS AND WHEEL ARE DE-ENERGIZED.
- OUTDOOR AIR AND EXHAUST AIR DAMPER ACTUATORS ARE DE-ENERGIZED AND DAMPERS SPRING RETURN CLOSED.
- SUPPLY DUCT SMOKE DETECTOR.
REMOTE ON/OFF: UNIT DDC SHALL HAVE AN INPUT ALLOWING THE UNIT TO BE STARTED/STOPPED BY THE FACILITY BMS (JOHNSON CONTROLS FACILITY
MANAGEMENT SYSTEM).
OCCUPIED/UNOCCUPIED MODES: SHALL BE BASED ON A 7-DAY SCHEDULE AND SHALL BE SET BY THE BMS.
- OCCUPIED MODE:
1. SUPPLY FAN ON. 2. EXHAUST FAN ON. 3. HEATING PER BELOW. 4. COOLING PER BELOW. 5. WHEEL CONTROL PER BELOW.
- UNOCCUPIED MODE (CYCLE ON ROOM TEMPERATURE AND HUMIDITY):
COOLING SEQUENCE: THE COOLING IS CONTROLLED TO MAINTAIN THE SUPPLY TEMPERATURE SET POINT. THE MECHANICAL COOLING WILL BE LOCKED OUT
WHEN THE OUTSIDE AIR IS < 55
O
F - 2 O
F HYSTERESIS, ADJUSTABLE.
- PACKAGED DX COOLING: DDC WILL PROVIDE A DIGITAL SIGNAL FOR 1 OR 2 STAGES OF COOLING TO MAINTAIN THE SUPPLY AIR SET POINT (ADJ.).
THIS SIGNAL WILL COME WIRED TO THE FACTORY PROVIDED CONDENSING SECTION.
DEHUMIDIFICATION SEQUENCE: THE COOLING IS CONTROLLED TO MAINTAIN THE COOLING-COIL SET POINT. THE DEHUMIDIFICATION SEQUENCE WILL BE
LOCKED OUT WHEN THE OA IS <10 F ABOVE THE COLD-COIL SET POINT. THE MECHANICAL COOLING WILL BE LOCKED OUT WHEN THE OUTSIDE AIR IS
< 55 O
F - 2 O
F HYSTERESIS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .