1548 HVAC- Site Visit Questions.docx
DOCX document 13 KB Posted
- Attached to
- Repair HVAC system at building 1548 Federal contract opportunity
- Solicitation number
- FA2835-12-R-0016
About this file
1548 HVAC Site Visit Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.pdf | ||
| 1548 HVAC- Site Visit Questions.docx | DOCX document | |
| MXRD 09-0071 Complete Plans.pdf | ||
| Wage Determination.pdf | ||
| RFP.pdf | ||
| RFP Cover Letter.pdf | ||
| bid schedule .pdf | ||
| MXRD 09-0071 Complete Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1548 HVAC Site Visit Questions
- Spec. Section 26 05 00.00 2.3 Splices and Connectors – requires that splices in AWG #8 and smaller be done with approved indenter crimp-type connectors and compression tools. Is this going to be required, or will the electrical contractor be allowed to used UL listed, industry standard, approved for the purpose “wire nuts”?
Provide as specified.
- The same section requires that AWG #6 and larger be spliced using bolted clamp-type connectors, and wrapped with insulating tape. Will we be allowed to use the UL listed, pre-insulated type?
Provide as specified.
- Drawing E-0.01 General Note #7 states that EMT shall not be used……provide rigid steel conduit in all areas. Does this include above suspended ceilings and other interior locations?
EMT shall not be used. Provide as specified.
- Drawing E-1.20 Notes 5 & 6 state to reuse existing conduit, but replace existing feeder to RTU-10……..Drawing E-1.30 **Note states to reuse existing feeder. What is to be reused and what is to be replaced?
Dwg E-1-20 is correct, feeder shall be replaced. Disregard note on the dwg E-1-30.
- Form 1442 does not state on line 13 D the number of days we should keep our offer open for, nor can I find this information anywhere in the solicitation. Can you confirm if we should use the standard period of 90 days?
The Offer should be valid until 30 September 2012, due to expiring funds.
- Per the Memorandum For Prospective Offerors dated August 9th, it states that bid proposals can be submitted via email to you directly by September 10th, 2012, 3:00PM but the actual solicitation dated August 9th, states the method of delivery should be an original and 2 copies with the submission date of September 10th 2012, 4:00 PM. Please confirm which delivery method and time we should use?
Electronic Submission is acceptable. Proposals are due by 10 September 2012 at 4:00 PM