bid schedule .pdf

PDF 53 KB Posted

Attached to
Repair HVAC system at building 1548 Federal contract opportunity
Solicitation number
FA2835-12-R-0016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC system at building 1548, newest first.
File Type Posted
Notice_of_Award.pdf PDF
1548 HVAC- Site Visit Questions.docx DOCX document
1548 HVAC- Site Visit Questions.docx DOCX document
Wage Determination.pdf PDF
RFP.pdf PDF
RFP Cover Letter.pdf PDF
MXRD 09-0071 Complete Plans.pdf PDF
MXRD 09-0071 Complete Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

For

HVAC REPAIR FOR BUILDING 1548

FITNESS CERNTER

Hanscom Air Force Base

PROJECT NUMBER: MXRD 09-0071

DATED: 27 July, 2012

BASE BID

Replacement of existing roof top air conditioning unit for the Fitness Center locker rooms and addition of dedicated roof top air conditioning unit for the women’s locker room. The work shall be phased as indicated in contract documents such that one locker room is operating at all times. Modification of the roof structural steel for the support of the new roof top air conditioning units and incidental roof work.

Provide all labor, material, equipment, supervision, quality control, tools, demolition, surveys, cutting and patching, roof penetrations, mechanical, duct modification, structural, electrical, coordination, phasing, testing, commissioning, inspection, start-up and commissioning, training, as built drawings, warrantee, travel, clean up, shop drawings, and performing all effort and operations required for the HVAC repairs as indicated in the RFP drawings, specifications, local state , and federal codes.

OPTION NO. 1

Replacement of carpet tiles in the locker rooms with vinyl sheet composite. Remove and dispose existing carpet tiles, install new vinyl sheet composite, remove and re-install existing lockers and integral base for removal of the carpet tiles and replacement of floor finish, remove and re-install benches, as required for the new floor installation, as built, phasing, clean up, and performing all efforts for the floor replacement as indicated in the RFP technical drawings and specifications.