bid schedule .pdf
PDF 53 KB Posted
- Attached to
- Repair HVAC system at building 1548 Federal contract opportunity
- Solicitation number
- FA2835-12-R-0016
About this file
Bid Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.pdf | ||
| 1548 HVAC- Site Visit Questions.docx | DOCX document | |
| 1548 HVAC- Site Visit Questions.docx | DOCX document | |
| Wage Determination.pdf | ||
| RFP.pdf | ||
| RFP Cover Letter.pdf | ||
| MXRD 09-0071 Complete Plans.pdf | ||
| MXRD 09-0071 Complete Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
For
HVAC REPAIR FOR BUILDING 1548
FITNESS CERNTER
Hanscom Air Force Base
PROJECT NUMBER: MXRD 09-0071
DATED: 27 July, 2012
BASE BID
Replacement of existing roof top air conditioning unit for the Fitness Center locker rooms and addition of dedicated roof top air conditioning unit for the women’s locker room. The work shall be phased as indicated in contract documents such that one locker room is operating at all times. Modification of the roof structural steel for the support of the new roof top air conditioning units and incidental roof work.
Provide all labor, material, equipment, supervision, quality control, tools, demolition, surveys, cutting and patching, roof penetrations, mechanical, duct modification, structural, electrical, coordination, phasing, testing, commissioning, inspection, start-up and commissioning, training, as built drawings, warrantee, travel, clean up, shop drawings, and performing all effort and operations required for the HVAC repairs as indicated in the RFP drawings, specifications, local state , and federal codes.
OPTION NO. 1
Replacement of carpet tiles in the locker rooms with vinyl sheet composite. Remove and dispose existing carpet tiles, install new vinyl sheet composite, remove and re-install existing lockers and integral base for removal of the carpet tiles and replacement of floor finish, remove and re-install benches, as required for the new floor installation, as built, phasing, clean up, and performing all efforts for the floor replacement as indicated in the RFP technical drawings and specifications.
File details come from the government source that posted it. Updated .