RFI.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Morgue Refrigerator Federal contract opportunity
- Solicitation number
- FA2823-21-Q-6027
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AS-BUILT DRAWINGS.pdf | ||
| OM1036-R116-SL - Rev C.pdf | ||
| Questions and Government Response.pdf | ||
| SOW - Morgue.docx | DOCX document | |
| Site Pictures.docx | DOCX document | |
| COMBO.docx | DOCX document | |
| 52.204-24 (Unsigned).pdf | ||
| Clauses and Provisions.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Eglin Master RFI Log
| Last Updated: | 23-Aug-21 | |||
| Pre-Proposal RFI Log | ||||
| FA2823-21-Q-6027, Replace Morgue Refrigerator | Contract No. TBD | |||
| RFI # | RFI Description | Date Sent to USAF | Date of Response | Response |
| 1 | With the amount of utilities in the hospital, can as-built drawings of the room, morgue, and all utilities in the area be provided? | 6-Aug-21 | Yes, Facility Manager has Provided Attachments | |
| 2 | Please provide the routing of the power to the HVAC unit (identified in RED); this line is on a dedicated circuit and back-up power for lock-out/tag-out safety requirements. | 6-Aug-21 | Electrical power for morgue cooler is fed from the |
basement, panel BLEQ1, circuit breaker 9.
Schematics have been provided.
| 3 | Will the existing morgue be considered medical waste or can it be recycled? | 6-Aug-21 | Not considered medical waste. Cleaning procedures by Pathology will be performed before removal. |
| 4 | Will the equipment and furnishings in the room be moved out by the Gov’t during preparation, installation, and testing of the new equipment? | 6-Aug-21 | Pathology lab will move anything not fixed to the walls or floor. Autopsy table in the middle of the room is bolted down and cannot be moved. |
| 5 | Please provide a contact in 96 CEG (either the hospital shops or CEN) who will oversee the project. | 6-Aug-21 | POC will be from MDG. Medical Maintenance (Mr. Kevin Francis) and Facility Manager (Mr. Terry Trier) |
| 6 | Will as-builts be required as part of close-out? Same with a DD 1354? | 6-Aug-21 | Yes, as-built ins will be required. |
A DD 1354 will not be required.
| 7 | Please provide the cut sheets and any installation instructions for the new equipment currently stored on-site. | 6-Aug-21 | Installation Instructions Provided |
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 | |||
| 13 | |||
| 14 | |||
| 15 | |||
| 16 | |||
| 17 | |||
| 18 | |||
| 19 | |||
| 20 | |||
| 21 | |||
| 22 | |||
| 23 | |||
| 24 | |||
| 25 | |||
| 26 | |||
| 27 | |||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | |||
| 32 | |||
| 33 | |||
| 34 | |||
| 35 | |||
| 36 | |||
| 37 | |||
| 38 | |||
| 39 | |||
| 40 | |||
| 41 | |||
| 42 | |||
| 43 | |||
| 44 | |||
| 45 | |||
| 46 | |||
| 47 | |||
| 48 | |||
| 49 | |||
| 50 | |||
| 51 | |||
| 52 | |||
| 53 | |||
| 54 | |||
| 55 | |||
| 56 | |||
| 57 | |||
| 58 | |||
| 59 | |||
| 60 | |||
| 61 | |||
| 62 | |||
| 63 | |||
| 64 | |||
| 65 | |||
| 66 | |||
| 67 | |||
| 68 | |||
| 69 | |||
| 70 | |||
| 71 | |||
| 72 | |||
| 73 | |||
| 74 | |||
| 75 | |||
| 76 |
&8Dawson 900 Fort. Street Mall, Suite 1700 Honolulu, HI 96813
File details come from the government source that posted it. Updated .