Attachment 5 Pricing Schedule.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
CONSTRUCT CONCRETE TARGETS Federal contract opportunity
Solicitation number
FA282320R0025
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT CONCRETE TARGETS, newest first.
File Type Posted
Amendment 4.pdf PDF
Updated Questions and Answers Amendment 3.docx DOCX document
Questions and Answers Amendment 3.docx DOCX document
Amendment 03.pdf PDF
Attachment 7 Section M 9 Feb 21.pdf PDF
Amendment 0002.pdf PDF
Attachment 2 20-TA-C74-01 Drawings.pdf PDF
RFI 9.30 Q&As.xlsx XLSX spreadsheet
Q and A Construct Concrete Target_Round 2.pdf PDF
Attachment L2-FRQ.pdf PDF
Attachment L4 Consent Form.pdf PDF
Attachment L3 Information Sheets.pdf PDF
Attachment 6 Section L.pdf PDF
Attachment L1 Bonds Checklist.pdf PDF
Amendment 1.pdf PDF
RFIs Construct Concrete Target.pdf PDF
Attachment L6 Cover Letter.pdf PDF
Attachment L5 - PPQ.docx DOCX document
Solicitation - FA282320R0025.pdf PDF
Attachment 5 Pricing Schedule.pdf PDF
Attachment 3 WD Okaloosa Heavy.pdf PDF
Attachment 7 Section M_090820.pdf PDF
Attachment 2 20-TA-C74-01 Drawings.pdf PDF
Attachment 4 WD Walton Heavy.pdf PDF
Attachment 1 C-VE-20-01 Specifications.pdf PDF
Attachment 6 Section L.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BIDDING SCHEDULE “A”
Furnish all plant, labor, materials and equipment, and perform all operations in connection with Construct Concrete Targets at Eglin AFB FL, in accordance with Specification No. C-VE-20-01 dated 14 Apr 20, Title page, Table of Contents, and pages 01010-1 through 03123-4 and Drawing No. 20-TA-C74-01, dated 14 Apr 20, in 16 sheets.
Note: (10) indicates targets that can be constructed with concrete compressive strengths up to minimum 10,000 psi at 28 days. (15) indicates targets that can be constructed with concrete compressive strength between 10,001 psi and up to minimum 15,000 psi at 28 days. (20) indicates targets that can be constructed with concrete compressive strengths of minimum 20,000 psi at 28 days. Required concrete compressive strength will be as specified on the delivery order. There is no price adjustment for (10) targets constructed with concrete compressive strengths ordered < minimum 10,000 psi, or for (15) targets constructed with concrete compressive strengths ordered >10,001 psi or <minimum 15,000 psi, or for (20) targets constructed with concrete compressive strengths ordered with >15,001 psi or <minimum 20,000 psi.
BASIC YEAR: Ordering Period is for 12 months after Award of Cnntract
ITEM NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
1TARGET TYPES$$
0020AAN (10)4EA
0020ABN (15)2EA
0020ACS (10)8EA
0020ADS (15)4EA
0020AES(20)1EA
0020AFS-1(10)1EA
0020AGS-1(15)1EA
0020AHT (10)1EA
0020AIT(15)1EA
0020AJBB (10)5EA
0020AKBB (15)1EA
0020ALFF (10)2EA
0020AMFF (15)1EA
0020ANNN (10)4EA
0020AONN (15)2EA
0020APSS (10)1EA
0020AQSS (15)1EA
0020ARUU (10)5EA
0020ASUU (15)1EA
0020ATYYY (10)1EA
0020AUYYY (15)1EA
0020AVLLLL (10)3EA
0020AWLLLL (15)1EA
0020AXMMMM(10)6EA
0020AYMMMM(15)1EA
0020AZSSSS (10)1EA
0020BASSSS (15)1EA
0020BBTTTT (10)3EA
0020BCTTTT (15)1EA
0020BDUUUU (10)1EA
0020BEUUUU (15)1EA
0020BFVVVV (10)1EA
0020BGVVVV (15)2EA
0020BHWWWW (10)1EA
0020BIWWWW (15)1EA
0020BJXXXX (10)1EA
0020BKXXXX (15)1EA
0020BLYYYY(10)6EA
0020BMYYYY(15)1EA
0020BNZZZZ(10)2EA
0020BOZZZZ(15)1EA
0020BPAAAAA(10)15EA
0020BQAAAAA(15)2EA
0020BRBBBBB(10)2EA
0020BSBBBBB(15)1EA
0020BTCCCCC(10)2EA
0020BUCCCCC(15)1EA
0020BVDDDDD(10)15EA
0020BWDDDDD(15)2EA
0020BXEEEEE(10)1EA
0020BYEEEEE(15)1EA
0020BZFFFFF(10)2EA
0020CAFFFFF(15)1EA
0020CBHHHHH-1(10)1EA
0020CCHHHHH-1(15)1EA
0020CDAFRL 6-4(10)25EA
0020CEAFRL 6-4(15)25EA
0020CFAFRL 6-4(20)10EA
0020CGAFRL 2.5-5(10)2EA
0020CHAFRL 2.5-5(15)5EA
0020CIAFRL 2.5-3(10)3EA
0020CJAFRL 2.5-3(15)5EA
0020CKHTSF-FAAT1EA
0020CLHTVSF Target 41EA
0020CMCUR 2.5M-0.51EA
0020CNCUR 2.5M-11EA
0020COCUR 5M-0.51EA
0020CPCUR 5M-11EA
2Provide one (1) two (2) cylinder set of concrete test specimens to be made at the time of pour and tested when the target they represent is used in an AF test mission. These cylinders are in addition to paragraph 2.10, section 03316 specification requirements.1EA
*0003Decrease or Increase Reinforcing Steel15Ton
*0004Decrease or Increase in Concrete Volume (0-10,000psi)20CY
*0005Decrease or Increase in Concrete Volume (10,001psi-15,000psi)20CY
*0006Decrease or Increase in Concrete Volume (15,001psi-20,000psi)10CY
*0007Add/Subtract Structural Steel (In Place)6Ton
*0008Add/Subtract Excavation100CY
*00096" Thick Compacted Limerock Base (In Place)150SY
ESTIMATED TOTAL AMOUNT, ITEM 0001-0009: $
* An increase or decrease in steel, concrete, excavation, or lime rock will cause an increase or decrease in the target cost by the unit price amount multiplied by the number of units ordered.
Note 1 - Contractor shall complete entire work ready for use not later than 75 calendar days for orders of 1-30 targets and 120 calendar days for orders exceeding 30 targets.
Note 2 - The quantity column in this table is an estimate solely for purposes of the source selection. The evaluated price for this ordering period is the sum of the extended prices of in this table, inclusive of the targets, the test specimen, and the “increase/decrease” materials. As noted elsewhere, the Total Evaluated Price (TEP) is the sum of the evaluated prices for each ordering period.”
OPTION YEAR 1: Ordering Period 12 months
ITEM NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
1001TARGET TYPES$$
1020AAN (10)4ea
1020ABN (15)2ea
1020ACS (10)8ea
1020ADS (15)4ea
1020AES(20)1ea
1020AFS-1(10)1ea
1020AGS-1(15)1ea
1020AHT (10)1ea
1020AIT(15)1ea
1020AJBB (10)5ea
1020AKBB (15)1ea
1020ALFF (10)2ea
1020AMFF (15)1ea
1020ANNN (10)4ea
1020AONN (15)2ea
1020APSS (10)1ea
1020AQSS (15)1ea
1020ARUU (10)5ea
1020ASUU (15)1ea
1020ATYYY (10)1ea
1020AUYYY (15)1ea
1020AVLLLL (10)3ea
1020AWLLLL (15)1ea
1020AXMMMM(10)6ea
1020AYMMMM(15)1ea
1020AZSSSS (10)1ea
1020BASSSS (15)1ea
1020BBTTTT (10)3ea
1020BCTTTT (15)1ea
1020BDUUUU (10)1ea
1020BEUUUU (15)1ea
1020BFVVVV (10)1ea
1020BGVVVV (15)2ea
1020BHWWWW (10)1ea
1020BIWWWW (15)1ea
1020BJXXXX (10)1ea
1020BKXXXX (15)1ea
1020BLYYYY(10)6ea
1020BMYYYY(15)1ea
1020BNZZZZ(10)2ea
1020BOZZZZ(15)1ea
1020BPAAAAA(10)15ea
1020BQAAAAA(15)2ea
1020BRBBBBB(10)2ea
1020BSBBBBB(15)1ea
1020BTCCCCC(10)2ea
1020BUCCCCC(15)1ea
1020BVDDDDD(10)15ea
1020BWDDDDD(15)2ea
1020BXEEEEE(10)1ea
1020BYEEEEE(15)1ea
1020BZFFFFF(10)2ea
1020CAFFFFF(15)1ea
1020CBHHHHH-1(10)1ea
1020CCHHHHH-1(15)1ea
1020CDAFRL 6-4(10)25ea
1020CEAFRL 6-4(15)25ea
1020CFAFRL 6-4(20)10ea
1020CGAFRL 2.5-5(10)2ea
1020CHAFRL 2.5-5(15)5ea
1020CIAFRL 2.5-3(10)3ea
1020CJAFRL 2.5-3(15)5ea
1020CKHTSF-FAAT1ea
1020CLHTVSF Target 41ea
1020CMCUR 2.5M-0.51ea
1020CNCUR 2.5M-11ea
1020COCUR 5M-0.51ea
1020CPCUR 5M-11ea
1002Provide one (1) two (2) cylinder set of concrete test specimens to be made at the time of pour and tested when the target they represent is used in an AF test mission. These cylinders are in addition to paragraph 2.10, section 03316 specification requirements.1ea
*1003Decrease or Increase Reinforcing Steel15Ton
*1004Decrease or Increase in Concrete Volume (0-10,000psi)20CY
*1005Decrease or Increase in Concrete Volume (10,001psi-15,000psi)20CY
*1006Decrease or Increase in Concrete Volume (15,001psi-20,000psi)10CY
*1007Add/Subtract Structural Steel (In Place)6Ton
*1008Add/Subtract Excavation100CY
*10096" Thick Compacted Limerock Base (In Place)150SY
ESTIMATED TOTAL AMOUNT, ITEM 1001-1009: $
* An increase or decrease in steel, concrete, excavation, or lime rock will cause an increase or decrease in the target cost by the unit price amount multiplied by the number of units ordered.
Note 1 - Contractor shall complete entire work ready for use not later than 75 calendar days for orders of 1-30 targets and 120 calendar days for orders exceeding 30 targets.
Note 2 - The quantity column in this table is an estimate solely for purposes of the source selection. The evaluated price for this ordering period is the sum of the extended prices of in this table, inclusive of the targets, the test specimen, and the “increase/decrease” materials. As noted elsewhere, the Total Evaluated Price (TEP) is the sum of the evaluated prices for each ordering period.”
OPTION YEAR 2: Ordering Period 12 months
ITEM NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
2001TARGET TYPES$$
2020AAN (10)4ea
2020ABN (15)2ea
2020ACS (10)8ea
2020ADS (15)4ea
2020AES(20)1ea
2020AFS-1(10)1ea
2020AGS-1(15)1ea
2020AHT (10)1ea
2020AIT(15)1ea
2020AJBB (10)5ea
2020AKBB (15)1ea
2020ALFF (10)2ea
2020AMFF (15)1ea
2020ANNN (10)4ea
2020AONN (15)2ea
2020APSS (10)1ea
2020AQSS (15)1ea
2020ARUU (10)5ea
2020ASUU (15)1ea
2020ATYYY (10)1ea
2020AUYYY (15)1ea
2020AVLLLL (10)3ea
2020AWLLLL (15)1ea
2020AXMMMM(10)6ea
2020AYMMMM(15)1ea
2020AZSSSS (10)1ea
2020BASSSS (15)1ea
2020BBTTTT (10)3ea
2020BCTTTT (15)1ea
2020BDUUUU (10)1ea
2020BEUUUU (15)1ea
2020BFVVVV (10)1ea
2020BGVVVV (15)2ea
2020BHWWWW (10)1ea
2020BIWWWW (15)1ea
2020BJXXXX (10)1ea
2020BKXXXX (15)1ea
2020BLYYYY(10)6ea
2020BMYYYY(15)1ea
2020BNZZZZ(10)2ea
2020BOZZZZ(15)1ea
2020BPAAAAA(10)15ea
2020BQAAAAA(15)2ea
2020BRBBBBB(10)2ea
2020BSBBBBB(15)1ea
2020BTCCCCC(10)2ea
2020BUCCCCC(15)1ea
2020BVDDDDD(10)15ea
2020BWDDDDD(15)2ea
2020BXEEEEE(10)1ea
2020BYEEEEE(15)1ea
2020BZFFFFF(10)2ea
2020CAFFFFF(15)1ea
2020CBHHHHH-1(10)1ea
2020CCHHHHH-1(15)1ea
2020CDAFRL 6-4(10)25ea
2020CEAFRL 6-4(15)25ea
2020CFAFRL 6-4(20)10ea
2020CGAFRL 2.5-5(10)2ea
2020CHAFRL 2.5-5(15)5ea
2020CIAFRL 2.5-3(10)3ea
2020CJAFRL 2.5-3(15)5ea
2020CKHTSF-FAAT1ea
2020CLHTVSF Target 41ea
2020CMCUR 2.5M-0.51ea
2020CNCUR 2.5M-11ea
2020COCUR 5M-0.51ea
2020CPCUR 5M-11ea
2002Provide one (1) two (2) cylinder set of concrete test specimens to be made at the time of pour and tested when the target they represent is used in an AF test mission. These cylinders are in addition to paragraph 2.10, section 03316 specification requirements.1ea
*2003Decrease or Increase Reinforcing Steel15Ton
*2004Decrease or Increase in Concrete Volume (0-10,000psi)20CY
*2005Decrease or Increase in Concrete Volume (10,001psi-15,000psi)20CY
*2006Decrease or Increase in Concrete Volume (15,001psi-20,000psi)10CY
*2007Add/Subtract Structural Steel (In Place)6Ton
*2008Add/Subtract Excavation100CY
*20096" Thick Compacted Limerock Base (In Place)150SY
ESTIMATED TOTAL AMOUNT, ITEM 2001-2009: $
* An increase or decrease in steel, concrete, excavation, or lime rock will cause an increase or decrease in the target cost by the unit price amount multiplied by the number of units ordered.
Note 1 - Contractor shall complete entire work ready for use not later than 75 calendar days for orders of 1-30 targets and 120 calendar days for orders exceeding 30 targets.
Note 2 - The quantity column in this table is an estimate solely for purposes of the source selection. The evaluated price for this ordering period is the sum of the extended prices of in this table, inclusive of the targets, the test specimen, and the “increase/decrease” materials. As noted elsewhere, the Total Evaluated Price (TEP) is the sum of the evaluated prices for each ordering period.”
OPTION YEAR 3: Ordering Period 12 months
ITEM NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
3001TARGET TYPES$$
3020AAN (10)4ea
3020ABN (15)2ea
3020ACS (10)8ea
3020ADS (15)4ea
3020AES(20)1ea
3020AFS-1(10)1ea
3020AGS-1(15)1ea
3020AHT (10)1ea
3020AIT(15)1ea
3020AJBB (10)5ea
3020AKBB (15)1ea
3020ALFF (10)2ea
3020AMFF (15)1ea
3020ANNN (10)4ea
3020AONN (15)2ea
3020APSS (10)1ea
3020AQSS (15)1ea
3020ARUU (10)5ea
3020ASUU (15)1ea
3020ATYYY (10)1ea
3020AUYYY (15)1ea
3020AVLLLL (10)3ea
3020AWLLLL (15)1ea
3020AXMMMM(10)6ea
3020AYMMMM(15)1ea
3020AZSSSS (10)1ea
3020BASSSS (15)1ea
3020BBTTTT (10)3ea
3020BCTTTT (15)1ea
3020BDUUUU (10)1ea
3020BEUUUU (15)1ea
3020BFVVVV (10)1ea
3020BGVVVV (15)2ea
3020BHWWWW (10)1ea
3020BIWWWW (15)1ea
3020BJXXXX (10)1ea
3020BKXXXX (15)1ea
3020BLYYYY(10)6ea
3020BMYYYY(15)1ea
3020BNZZZZ(10)2ea
3020BOZZZZ(15)1ea
3020BPAAAAA(10)15ea
3020BQAAAAA(15)2ea
3020BRBBBBB(10)2ea
3020BSBBBBB(15)1ea
3020BTCCCCC(10)2ea
3020BUCCCCC(15)1ea
3020BVDDDDD(10)15ea
3020BWDDDDD(15)2ea
3020BXEEEEE(10)1ea
3020BYEEEEE(15)1ea
3020BZFFFFF(10)2ea
3020CAFFFFF(15)1ea
3020CBHHHHH-1(10)1ea
3020CCHHHHH-1(15)1ea
3020CDAFRL 6-4(10)25ea
3020CEAFRL 6-4(15)25ea
3020CFAFRL 6-4(20)10ea
3020CGAFRL 2.5-5(10)2ea
3020CHAFRL 2.5-5(15)5ea
3020CIAFRL 2.5-3(10)3ea
3020CJAFRL 2.5-3(15)5ea
3020CKHTSF-FAAT1ea
3020CLHTVSF Target 41ea
3020CMCUR 2.5M-0.51ea
3020CNCUR 2.5M-11ea
3020COCUR 5M-0.51ea
3020CPCUR 5M-11ea
3002Provide one (1) two (2) cylinder set of concrete test specimens to be made at the time of pour and tested when the target they represent is used in an AF test mission. These cylinders are in addition to paragraph 2.10, section 03316 specification requirements.1ea
*3003Decrease or Increase Reinforcing Steel15Ton
*3004Decrease or Increase in Concrete Volume (0-10,000psi)20CY
*3005Decrease or Increase in Concrete Volume (10,001psi-15,000psi)20CY
*3006Decrease or Increase in Concrete Volume (15,001psi-20,000psi)10CY
*3007Add/Subtract Structural Steel (In Place)6Ton
*3008Add/Subtract Excavation100CY
*30096" Thick Compacted Limerock Base (In Place)150SY
ESTIMATED TOTAL AMOUNT, ITEM 3001-3009: $
* An increase or decrease in steel, concrete, excavation, or lime rock will cause an increase or decrease in the target cost by the unit price amount multiplied by the number of units ordered.
Note 1 - Contractor shall complete entire work ready for use not later than 75 calendar days for orders of 1-30 targets and 120 calendar days for orders exceeding 30 targets.
Note 2 - The quantity column in this table is an estimate solely for purposes of the source selection. The evaluated price for this ordering period is the sum of the extended prices of in this table, inclusive of the targets, the test specimen, and the “increase/decrease” materials. As noted elsewhere, the Total Evaluated Price (TEP) is the sum of the evaluated prices for each ordering period.”
OPTION YEAR 4: Ordering Period 12 months
ITEM NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
4001TARGET TYPES$$
4020AAN (10)4ea
4020ABN (15)2ea
4020ACS (10)8ea
4020ADS (15)4ea
4020AES(20)1ea
4020AFS-1(10)1ea
4020AGS-1(15)1ea
4020AHT (10)1ea
4020AIT(15)1ea
4020AJBB (10)5ea
4020AKBB (15)1ea
4020ALFF (10)2ea
4020AMFF (15)1ea
4020ANNN (10)4ea
4020AONN (15)2ea
4020APSS (10)1ea
4020AQSS (15)1ea
4020ARUU (10)5ea
4020ASUU (15)1ea
4020ATYYY (10)1ea
4020AUYYY (15)1ea
4020AVLLLL (10)3ea
4020AWLLLL (15)1ea
4020AXMMMM(10)6ea
4020AYMMMM(15)1ea
4020AZSSSS (10)1ea
4020BASSSS (15)1ea
4020BBTTTT (10)3ea
4020BCTTTT (15)1ea
4020BDUUUU (10)1ea
4020BEUUUU (15)1ea
4020BFVVVV (10)1ea
4020BGVVVV (15)2ea
4020BHWWWW (10)1ea
4020BIWWWW (15)1ea
4020BJXXXX (10)1ea
4020BKXXXX (15)1ea
4020BLYYYY(10)6ea
4020BMYYYY(15)1ea
4020BNZZZZ(10)2ea
4020BOZZZZ(15)1ea
4020BPAAAAA(10)15ea
4020BQAAAAA(15)2ea
4020BRBBBBB(10)2ea
4020BSBBBBB(15)1ea
4020BTCCCCC(10)2ea
4020BUCCCCC(15)1ea
4020BVDDDDD(10)15ea
4020BWDDDDD(15)2ea
4020BXEEEEE(10)1ea
4020BYEEEEE(15)1ea
4020BZFFFFF(10)2ea
4020CAFFFFF(15)1ea
4020CBHHHHH-1(10)1ea
4020CCHHHHH-1(15)1ea
4020CDAFRL 6-4(10)25ea
4020CEAFRL 6-4(15)25ea
4020CFAFRL 6-4(20)10ea
4020CGAFRL 2.5-5(10)2ea
4020CHAFRL 2.5-5(15)5ea
4020CIAFRL 2.5-3(10)3ea
4020CJAFRL 2.5-3(15)5ea
4020CKHTSF-FAAT1ea
4020CLHTVSF Target 41ea
4020CMCUR 2.5M-0.51ea
4020CNCUR 2.5M-11ea
4020COCUR 5M-0.51ea
4020CPCUR 5M-11ea
4002Provide one (1) two (2) cylinder set of concrete test specimens to be made at the time of pour and tested when the target they represent is used in an AF test mission. These cylinders are in addition to paragraph 2.10, section 03316 specification requirements.1ea
*4003Decrease or Increase Reinforcing Steel15Ton
*4004Decrease or Increase in Concrete Volume (0-10,000psi)20CY
*4005Decrease or Increase in Concrete Volume (10,001psi-15,000psi)20CY
*4006Decrease or Increase in Concrete Volume (15,001psi-20,000psi)10CY
*4007Add/Subtract Structural Steel (In Place)6Ton
*4008Add/Subtract Excavation100CY
*40096" Thick Compacted Limerock Base (In Place)150SY
ESTIMATED TOTAL AMOUNT, ITEM 4001-4009: $
* An increase or decrease in steel, concrete, excavation, or lime rock will cause an increase or decrease in the target cost by the unit price amount multiplied by the number of units ordered.
Note 1 - Contractor shall complete entire work ready for use not later than 75 calendar days for orders of 1-30 targets and 120 calendar days for orders exceeding 30 targets.
Note 2 - The quantity column in this table is an estimate solely for purposes of the source selection. The evaluated price for this ordering period is the sum of the extended prices of in this table, inclusive of the targets, the test specimen, and the “increase/decrease” materials. As noted elsewhere, the Total Evaluated Price (TEP) is the sum of the evaluated prices for each ordering period.”

File details come from the government source that posted it. Updated .