Attachment_9_FTFA_16-1072_Repair_Roof_Bldg_984_-_SOW.docx

DOCX document 47 KB Posted

Attached to
Roofing IDIQ
Solicitation number
FA2823-17-R-4014
Issued by

About this file

Attachment_9_FTFA_16-1072_Repair_Roof_Bldg_984_-_SOW.docx

View the file

Other files

File Type Posted
FA2823-17-R-4014-0010_Amendment_0010.pdf PDF
FA2823-17-R-4014-0009_Amendment_0009.pdf PDF
FA2823-17-R-4014-0008_Amendment_0008.pdf PDF
FA2823-17-R-4014-0007_Amendment_0007.pdf PDF
FA2823-17-R-4014-0006_Amendment_0006.pdf PDF
Attachment_1_Specs_REV-9MAY2017.pdf PDF
Eglin_Architech__Plan.pdf PDF
FA2823-17-R-4014-0005_Amendment_0005.pdf PDF
FA2823-17-R-4014-0004_Amendment_0004.pdf PDF
Site_Visit_-_Sign_in_Sheet.pdf PDF
FA2823-17-R-4014-0003_Amendment_0003.pdf PDF
Attachment_12_Eglin_AFB_FORM_90_Base_Access.pdf PDF
FA2823-17-R-4014-0002_Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Attachment_3_Roofing_Bid_Schedules.xlsx XLSX spreadsheet
Solicitation_FA2823-17-R-4014_Roofing_IDIQ.pdf PDF
Attachment_13_Memorandum_for_96_SFS,S-5B,_Base_Access.doc DOC document
Attachment_6_WD_Okaloosa_County_Building.pdf PDF
Attachment_8_Past_Perf_Questionnaire.docx DOCX document
Attachment_12_Eglin_AFB_FORM_90_Base_Access_Memo.xfdl XFDL file
Attachment_4_Eglin_Specific_Information.pdf PDF
Attachment_2_Appendix_C_of_the_Specs_-_AF_FALL_PROTECTION_GUIDE.pdf PDF
Attachment_5_WD_Okaloosa_County_Residential.pdf PDF
Attachment_1_REPAIR_AND_REPLACE_MISC_BASE_BUILDING_IDIQ_Specs-SOW__dated_15_June_16.pdf PDF
Attachment_7_WD_Walton_County_Building.pdf PDF
Attachment_11_Directions_to_building_984.docx DOCX document
Attachment_10_FTFA_16-1072_Proposed_Roof_Plan_R-1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 96TH TEST WING (AFMC)

EGLIN AIR FORCE BASE FLORIDA

29 June 2016

STATEMENT OF WORK

Project FTFA 16-1072

REPAIR BUILT-UP ROOF AT MUNITION STORAGE MAGAZINE

BUILDING 984, HERD AREA, EGLIN AFB

Indefinite Delivery/Indefinite Quantity (IDIQ) Contract No. TBD Roofing Repair and Roofing Maintenance

GENERAL

The contractor shall furnish all plant, labor, vehicles, equipment, tools and materials for performing all operations to replace the roof at the Munition Storage Magazine Bldg 984, HERD area, Eglin AFB. Construction work shall be performed as an Indefinite Delivery/Indefinite Quantity (IDIQ) roofing contract; therefore, all roof work shall conform to specifications given by the IDIQ Project Specifications № 16 AD, 15 June 2016, or latest version. Roof work shall also comply with the specifications of this SOW.

This task order includes replacing the roof at Building 984, Munition Storage Magazine, HERD area, with a new 72 mil PVC single-ply membrane over new tapered insulation. The munition storage magazine is a poured-in-place concrete building with two bays, separated by a concrete wall, with a total building footprint of approx. 475 sq. ft. There is a separate 112 sq. ft. shed-like structure, which is included in the scope of this project. The existing roof system for both structures is a gravel-surfaced asphalt built-up roof. The roof deck for the 2-bay magazine storage is a tectum slab supported on steel angle ledgers. For the shed structure, the roof deck is assumed to be poured-in-place concrete slab, though could be tectum slab. The coating on the interior ledger angles in the 2-bay magazine storage structure is damaged and peeling, resulting in areas of minor steel corrosion. The existing roof system can be classified as a flat roof-low slope (less than 1/4” per foot). Refer to attached drawing R-1 for a roof plan with approximate building dimensions.

There are no as-built drawings available. It is the contractor’s responsibility to verify all dimensions and existing conditions.

Due to security requirements, the contractor and his/her personnel must obey and comply with the document package Contractor Procedures. The Contractor Procedures applicable to this project will be delivered to the contractor during the pre-construction meeting or upon request.

It may become necessary from time to time for the Government officials to stop the Contractor from working due to mission priority, Base security, or other events. The Contractor will be required to cease work as directed by the Facility Manager/POC or other Government officials. Any scheduled or unscheduled delays encountered should be reported to the Government Construction/Contracting Representative/Officer assigned to the project. For each calendar day and/or portion of a calendar day the Contractor is removed from the job site, the contract schedule will be adjusted accordingly.

Existing facilities are unoccupied and no munitions are stored in the magazine at this time. Roofing operations might be interrupted to perform building operations, as directed by users. Workers may be asked to leave the roof and stay inside a designated facility until directed to resume operations. At least one (1) week ahead of roofing operations, Contractor shall coordinate with the testing schedule provided by the HERD facility manager.

Neither the contractor nor the members of his/her team are authorized to enter the building without coordination with the Facility Manager.

Provide a new Single-Ply Membrane Roof on Building 984. Construction includes, but is not limited to, the following general work:

Demolition Work (applies to both 2-bay munition storage magazine and adjacent shed structure, unless otherwise noted)

1. Remove and dispose of the existing ply built-up roof system down to the tectum or concrete roof deck.

2. Remove and dispose of roof accessories: wall flashing, edge flashing, counter flashing, fascia metal, etc.

3. Remove and dispose of the paint coatings on the interior steel ledger angles in the 2-bay magazine storage structure. Total length of L3”x4”x1/2” angle included as part of this coating removal is approximately 133 ft.

New Work (applies to both 2-bay munition storage magazine and adjacent shed structure, unless otherwise noted)

1. Install new tapered insulation and cover board to achieve 1/4” per foot slope, minimum. Fully adhere insulation and cover board to roof deck (tectum and/or concrete, as applicable). Attachment to tectum deck will require additional reinforcement (peel stops mechanically anchored to roof deck in addition to adhesive) to comply with required design wind loads. Coordinate with manufacturer for design of additional anchorage. Testing may be required.

2. Install fully-adhered single-ply 72 mil PVC roofing membrane to concrete and/or tectum roof decks. Design the new system and adhesive to comply with the 2012 International Building Code, ASCE 7-10, The Florida Building Code, and Eglin Base Criteria. Basic wind speed shall be the greater value from ASCE-7-10, or 150 mph. Design calculations and roof drawings shall be sealed and signed by a Registered Professional Engineer. Reinforce anchorage at Tectum deck as required. See item 1 (above).

3. Single-ply membrane shall be continuous at the transition from the roof to the interior parapet walls and continue of the top of the wall. Provide a PVC-coated aluminum wall coping cap at parapet.

4. Install aluminum edge flashings and metal fascia, as required.

5. Install continuous aluminum gutters and downspouts above the door side of each structure. Avoid the grounding cable, as required. Provide concrete splash block at each downspout.

6. Provide a 20 year NDL manufacturer’s warranty covering total system, with a wind rider of 120 mph wind speed, or maximum available.

7. Provide one (1) permanent fall protection anchor at each structure, mounted to the roof deck or parapet walls. Permanent roof anchor is required for fall protection per OSHA standards 29 CFR 1926.500. Include design, engineering, onsite inspection/testing, and certification for the new fall protection anchorage system. Provide appropriate flashing at each anchor using metal roof type flashing.

8. Factory paint metal roof components in accordance with Federal Standard 595B to closely match Eglin Air Force Base standards. PVC membrane shall be white. Coping cap, gutters, downspouts, and edge flashing/metal fascia shall match as closely as possible to Fed. Std. Color #37769 (off-white), or similar to Englert’s Sandstone. Provide the Government options from standard factory finish colors.

9. Touch up any newly exposed or damaged wall paint with matching color, as required.

10. Prepare the steel surface of the interior steel angle ledgers in the 2-bay magazine storage structure as required by the coating manufacturer. Paint surface of steel.

Submittals. The Contractor shall submit for evaluation and government approval the documents listed below. All submittals shall be delivered to the government as a complete package. Partial submittals shall be reviewed.

Prior to construction, submit:

a. All Material specifications and FL product approval data (roof membrane, insulation, metal components, epoxy coatings, etc).

b. Installation specifications required by the roof and materials manufacturer.

c. Project specific design drawings and details of proposed roofing system, flashing and counter flashing, insulation, blocking, etc. applicable to the project. Refer to IDIQ Contract Specification Section 01 11 00 for drawing requirements.

d. Roofing calculations signed by Engineer of Record, and/or Florida/FM approvals of roofing system for required design loads at site specific location.

e. Fall protection anchorage submittal and calculations.

f. Color samples for roof system components (edge metal, flashing, gutters, downspouts, anchors, etc).

g. Project Progress schedule per AF 3065, and other required contractor submittals, i.e. fall protection plan, etc.

At project completion, submit:

a. Project close out documents such as manufacturer’s warranty, testing results, certifications etc., as applicable.

b. As built drawings (PDF’s), AutoCAD .dwg files (AutoCAD Version 2010, minimum), and one (1) full size hard copy on mylar, and two (2) half size hard copies on bond.

Other Requirements:

The Contractor shall attend a negotiation meeting and be ready to provide clarification of any work to be performed. A negotiation meeting will take place in the Conference Room, Bldg 634 if required. Date and time will be announced.

Prior to construction, with at least a 2 week notice in advance, the Contractor shall coordinate with the Contracting Officer to set up a pre-construction meeting on site, to determine issues such as materials lay-down areas, the start date or roofing operations, etc.

The contractor shall keep continuous and effective communication with the Facility Manager/POC and comply with their requirements, such as testing schedules.

The Contractor shall comply with the environmental requirements of Eglin AFB. The use and disposal of roofing materials and shall be coordinate with the Environmental Flight. The Contractor shall contact Mr. Stephen Kauffman (850) 882-7665 for information regarding environmental issues applicable to this project.

The Contractor shall conform to the Eglin Air Force Base Architectural Compatibility Plan for all materials.

The Facility Manager/POC for this project is Mr. Michael Akin (850) 882-4181. Alternate is Mr.Tom Sprague.

The Project Manager is David Wolfson, (850) 883-1350.

Project Inspector is Pat Grisez, (850) 883-1321 or (850) 978-2601.

NOTE: The above general outline of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, materials and equipment required by Specification No. 16AD, 15 June, 2016, or latest version, as included and made a part of this delivery order.

LOCATION: The work site is the HERD Area at Eglin Air Force Base, Florida.

PERFORMANCE TIME: The performance time for this delivery order shall be 36 Calendar Days.

ATTACHMENTS:

a. R-1 Building 984 Proposed Roof Plan

End of Statement of Work Page 4 of 4 29 June 2016 image1.jpeg