Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to revise paragraph 3(g) of Section L. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2823-17-R-4014
X 9B. DATED (SEE ITEM 11)
20-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2017
CODE
AFTC/PZIO EGLIN - FA2823
308 WEST D AVE. BLDG 260 STE 130
EGLIN AFB FL 32542-5418
FA2823 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA2823-17-R-4014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
Section L - Instructions, Conditions, and Notices to Offerors
PROPOSAL PREPARATION INSTRUCTIONS
INFORMATION TO OFFERORS & INSTRUCTIONS FOR PROPOSAL PREPARATION
1. PROGRAM STRUCTURE AND OBJECTIVE
The Government intends to award a single Repair and Replace Roofs Indefinite-Delivery Indefinite- Quantity (IDIQ) contract for Eglin Air Force Base. The Government reserves the right to award without discussions with offerors. Awarded contract will be for a Base Year and four (4) one year Option periods.
2. GENERAL INFORMATION
(a) This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by this ITO and be submitted in accordance with these instructions. Evidence of experience, capability, and qualifications that clearly demonstrate and support the offeror’s claims are essential. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.
(b) Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in section M of this solicitation and for substantiating validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of the offeror’s facilities and/or experience and will base its evaluation on the information presented in the offeror's proposal.
(c) Elaborate artwork, expensive paper/binding, and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.
(d) The proposal acceptance period is specified in Block 13, SF 1442, of this solicitation. By signing block 20B of the SF 1442, the offeror certifies that the proposal is valid from the due date and time listed in block 13A through the entire period specified in block 13D.
(e) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of such unsuccessful proposals.
(f) Points of Contact/Questions & Clarifications: The Contracting Officer (CO) and Administrator are the sole points of contact for this acquisition. All questions/clarifications regarding this solicitation must be submitted in writing. Any questions and subsequent answers will be posted to the Federal Business Opportunities website (www.fbo.gov). It is the responsibility of the contractor to continuously monitor the site for updates. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, offerors are encouraged to submit all questions and requests for clarifications no later than close of business ten (10) days prior to the solicitation closing date. The decision whether to respond to questions and requests for clarification made less than ten (10) days prior to the solicitation closing shall be at the sole discretion of the Contracting Officer (CO). If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the omission or error. Offerors shall submit questions/request for clarifications to the below points of contact:
Contract Administrator: Kevin Wesolowski, kevin.wesolowski.1@us.af.mil
Contracting Officer: Ronald Wilson, ronald.wilson.22@us.af.mil
3. GENERAL INSTRUCTIONS
(a) Offerors are responsible for submitting proposals so as to reach the Government office designated in this solicitation prior to the time specified in Block 13 of SF 1442. Electronic submission or facsimile of proposals for this solicitation will not be accepted by the Government. Proposals shall be hand delivered or mailed to arrive at the following address:
AFTC/PZIOC
ATTN: Ronald J. Wilson/Kevin J. Wesolowski 210 West D. Avenue, Building 37 Eglin AFB, Florida 32542.
Offerors are cautioned that Eglin AFB, FL has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HAND CARRYING PROPOSALS; therefore, please allow adequate time. If you are unable to access the base or denied access to Eglin AFB, FL, the proposal will need to be mailed sufficiently in advance to permit delivery by the deadline. Contracting Office personnel will not meet Offerors at the gate nor will they arrange for temporary access to Eglin AFB. Please plan accordingly.
(b) Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is “late” and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.
(c) All referenced documents for this solicitation are available on the Federal Business
Opportunities website at www.fbo.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
(d) The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted in Federal Business Opportunities website (www.fbo.gov). If such amendments require material changes in quantities or prices, the proposal closing date may be postponed. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 18 or by providing signed copies of the amendments with their proposal.
(e) Submission, Modification, Revision, and Withdrawal of Proposals: Proposals and modifications to proposals shall be submitted on paper media and electronic media in sealed envelopes/packages, addressed to the CO and Administrators at the address shown in Block 7 of the SF 1442, and showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
(f) Debriefings: The Contracting Officer will promptly notify offerors of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal.
The Contracting Officer will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
(g) Who Can Participate: Proposals may only be submitted by 8(a) concerns under North American Industrial Classification System code (NAICS) of 238160.
(h) Page Limitations: Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. Page limitations may also be placed on responses to Evaluation Notices (ENs), if any. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. Each page shall be counted except the following: blank pages, title pages, tables of contents, tabs, glossaries and those parts of the proposal noted as unlimited.
(i) Page Size and Format: A page is defined as each face of an 8 ½” X 11” sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. For the purposes of formatting, typing shall not be less than 10 pitch. Double-sided pages are acceptable and counted as 2 pages. Pages shall be numbered sequentially by volume. These limitations shall apply to both electronic and hard copy proposals. Solicitation attachments shall not be altered and are exempt from stated formatting.
(j) Charts and Tables: Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. For tables, charts, graphs and figures, the font size shall be no smaller than 10 point. These limitations shall apply to both electronic and hard copy proposals.
(k) Electronic Copies: One (1) electronic copy of the entire proposal will be submitted on CD or
DVD. The content and page sizes contained on the electronic copy must be identical to the hard copies.
Offeror shall submit all volumes in electronic format, using MS Windows-compatible, CD- ROM(s)/DVDs.
On each CD-ROM/DVD indicate the offeror’s name, solicitation number, volume, and title. One CD- ROM/DVD containing all volumes with all documents is preferred, but multiple CD-ROMs/DVDs are acceptable. Uncompressed files are preferred, but if files must be compressed, WinZip shall be the compression/decompression program used. The electronic copy of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2013®, MS Excel 2013®, MS Power Point 2013®, and Adobe Acrobat® as applicable. Hidden fields, comments, macros, etc. shall be omitted, and read passwords on files shall not be used. The files shall be consistent and uniformly named to allow for easy distinction between Volume, Tab, etc. Inclusion of company name or abbreviation is acceptable. No picture shots of excel spreadsheets shall be included. All excel spreadsheets and formulas shall be accessible for review if submitted. The documents submitted in electronic format, if printed, should match the original paper copy.
In the event there is a discrepancy between the content found in a paper copy and an electronic copy, the paper copy marked “original” shall take precedence.
(l) Pricing Information: All cost or pricing data shall be addressed ONLY in the Price Proposal
Volume.
(m) Cross Referencing: Each volume shall be written on a stand-alone basis so that its contents may be evaluated with no cross-referencing to other volumes of the proposal. Information required for proposal evaluation that is not found in its designated volume will be assumed to have been omitted from the proposal.
(n) Indexing: Each volume shall contain a table of contents to delineate the sections and any subsections within that volume. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.
(o) Glossary of Abbreviations and Acronyms: Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.
(p) Binding and Labeling: Each volume of the proposal should be separately bound to permit the volume to lie flat when open. Staples shall not be used. Three-ring binders are acceptable but not required.
The volume cover, or a cover sheet, shall be bound in each volume, clearly marked as to volume number, title, original or copy number, solicitation identification, and the offeror's name. The same identifying data should be placed on the spine of each volume, if applicable. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.
(q) System for Award Management (SAM): In accordance with FAR provision 52.204-7, System for Award Management, offerors are required to be registered in SAM prior to award. Additionally, if the Government determines that discussions are necessary, discussions may only be held with those offerors who are registered in SAM. Therefore, it is requested that all offerors are registered in SAM prior to the time/date set for receipt of offers to avoid delays in the source selection process.
4. OFFERS
The proposal and other information shall be submitted in hard copies and an electronic copy (CD or DVD) format. The proposal shall consist of the following volumes:
Volume I, Contract Documents (Original + 2 each hard copies) Volume II, Price Proposal (Original + 2 each hard copies) Volume III, Past Performance (Original + 2 each hard copies) Volume IV, First Task Order Proposal (Original + 2 hard copies) CD/DVD – Electronic copy of entire proposal (1 each)
4.1 VOLUME I – CONTRACT DOCUMENTS
Offerors shall submit Original and two (2) hard copies. Page Limitation: unlimited unless otherwise noted.
VOLUME
I
CONTRACT DOCUMENTS
TAB #1
Executive Summary, two (2) page limit
See paragraph (a) below for additional instructions.
TAB #2
Section A, Solicitation, Offeror and Award (Standard Form 1442), with amendments, if any, acknowledged, signed, and dated by a person legally authorized to bind the company.
If an agent signs the proposal, ensure legal evidence of their authority is included.
Complete blocks 14, 15, 16, 17, 18, and 20a, b, c.
Original hard copy must be clearly marked as original. Electronic copy may be scanned but must be legible
See paragraph (b) below for additional instructions.
TAB #3 Bonding Capability:
Provide information, from an acceptable surety in accordance with FAR 28.202, Acceptability of Corporate Sureties, reflecting sufficient bonding capability to meet the maximum single task order amount of $1,000,000 as well as a potential yearly aggregate amount of $8,500,000.
Electronic copy may be scanned but must be legible.
See paragraph (c) below for additional instructions
TAB #4
Section I, Contract Clauses (Standard Form 1442) Only those pages that require offeror responses Electronic copy may be scanned but must be legible; electronically-generated documents are preferred.
TAB #5
Section K, Representations, Certifications and Other Statements of Offerors (Standard Form 1442)
If the offeror is a small business Joint Venture (JV), include a copy of the JV Agreement. If the JV Agreement requires approval by the SBA, furnish SBA supporting documentation.
Complete representations and certifications in Section K and/or the System for Award Management (SAM). Ensure company’s data is current and up-to-date in the System for Award Management (SAM) (https://www.sam.gov/portal/SAM/#1) to include Representations and Certifications.
Electronic copy may be scanned but must be legible; electronically-generated documents are preferred.
(a) Executive Summary: Each offeror shall submit an Executive Summary of no more than two (2) pages total that summarizes the key points from the offeror’s Price and Past Performance areas. Summary shall begin with company/division’s street address; CAGE Code; DUNS Number; and size of business, socioeconomic status if applicable, and a summary of the key points from the offeror’s Price and Past Performance volumes. Offerors shall provide the name, title, telephone number(s) and email addresses of the company/division point(s) of contact regarding decisions made with respect to the proposal and who can obligate the company contractually. Offerors shall identify those individual(s) authorized to negotiate with the Government for this solicitation.
(b) Offerors shall submit the SF 1442 on paper with an original signature of a person legally authorized to bind the company.
(c) Bonding Capability: Offerors shall provide a signed letter or other evidence from an acceptable surety in accordance with FAR 28.202 Acceptability of Corporate Sureties, reflecting sufficient bonding capability to meet the maximum task order amount ($1,000,000) as well as a potential yearly aggregate amount of $8,500,000. Failure to provide this information and/or an Offeror’s inability to secure bonding to meet the minimum requirements of this solicitation shall result in immediate exclusion from the competition.
4.2 VOLUME II – PRICE PROPOSAL
TAB #1
Section B, Supplies or Services and Prices Completed Roofing Bid Schedule and Line Item Pricing Schedule (Attachment 3). Electronic copy of Line Item Pricing Schedule shall be in Microsoft EXCEL 2013 (or earlier) format.
Electronic copy may be scanned but must be legible; electronically-generated documents are preferred.
See paragraph 4.2(a) below for additional instructions.
(a) Offerors shall input their pricing on the provided spreadsheet, Attachment 3, Roofing Bid
Schedule. Offerors shall only input the unit price for all line items and for the base and all option years.
The spreadsheet will automatically calculate the extended price and the total for the base or option year.
Offerors shall not modify the spreadsheet, change any quantities or change any of the formulas. Offerors shall notify the Points of Contact specified in this solicitation if any error in the formulas or calculations is discovered. Failure to provide pricing for all line items and/or all years may render the proposal as ineligible for award.
(b) The Contracting Officer (CO) has determined there is a high probability of adequate price competition in this acquisition. Therefore, only a limited amount of pricing information is required in the initial proposal. Upon examination of the initial proposals, the CO will review this determination and if, in the CO's opinion, there is adequate price competition, no additional price information will be requested and certification under FAR 15.406-2 will not be required. However if, at any time during this competition, the CO determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
4.3 VOLUME III – PAST PERFORMANCE (FACTOR 3)
Offerors shall submit Original and two (2) hard copies.
I I I
PAST PERFORMANCE VOLUME
TAB #1
Completed Past Performance Information Sheets:
Ensure the primary points of contact for references are currently available to provide past performance information.
Electronic copy may be scanned but must be legible; electronically-generated and - signed documents are preferred.
TAB #2
Adverse Information (if any): Electronic copy may be scanned but must be legible; electronically-generated and -signed documents are preferred.
TAB #3
Teaming/Partnership Agreements (if any): Electronic copy may be scanned but must be legible; electronically-generated and -signed documents are preferred.
TAB # 4
Organizational Structure Change History (if any): Electronic copy may be scanned but must be legible; electronically-generated and -signed documents are preferred.
(a) Past Performance Information Sheets:
(1) Offerors shall provide past performance information on completed or current contracts (including Federal, State, local government and private) that demonstrates their ability to perform the proposed work as identified within the solicitation. Offerors shall submit information on up to five (5) recent contracts from the Offeror considered most relevant in demonstrating performance abilities to repair and replace roofs as specified in the solicitation. Provide a summary of the previous contracts described above, not to exceed one (1) page of past performance information per reference. The summary shall explain what aspects of each reference are deemed recent and relevant as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating. Past Performance Information shall not exceed one (1) page per reference. A maximum total of five (5) references may be submitted and each reference shall include the following:
Name of project (Contract number, if applicable)
Name and address of customer or Government agency
Name, telephone, fax number and/or email of customer contact or contracting officer
Dollar value
Period of performance/Completion date
Brief description of work performed, and why the effort is relevant. Failure to provide required relevancy description may impact the confidence rating.
Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions
(2) If the offeror claims there is no past performance, then that status must be identified to the Contracting Officer not later than the date and time proposals are due from all offerors.
(3) Past Performance Questionnaires: The offeror shall provide completed Past Performance Questionnaires (Attachment 8 of this solicitation) for each past performance reference submitted.
Offerors shall complete Section A, Contractor Information, of Attachment 8, and forward the Past Performance Questionnaire to all past performance references and instruct them to complete Sections B and C. Evaluators are only allowed to use the Attachment 8, Past Performance Questionnaire. Altered or substituted questionnaires will not be evaluated. Offeror are responsible for ensuring the Past Performance Questionnaire is completed by the customer’s project manager for the respective project.
(c) Offerors shall provide any adverse information they received in the past three (3) years, such as
Letters of Concern, Cure and or Show Cause Notices, Terminations for Cause/Default and a narrative explaining the circumstances resulting from its receipt and corrective actions taken, if applicable. This may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems encountered. The Offeror shall clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. Submittal of quality performance indicators or other management indicators that clearly support that an Offeror has overcome past problems is required.
(d) Teaming/Partnership Agreements (include only if applicable) Offerors shall include any written contract/teaming arrangement agreements. All written contract teaming arrangements and letters of intent shall be signed by all parties.
(e) Organizational Structure Change History (include only if applicable): Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between the conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, offerors shall include a "roadmap" describing any/all such changes in their organization. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts identified for past performance evaluation/ performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), the "roadmap" should be both specifically applicable to the efforts identified, yet general enough to apply to efforts on which the Government receives information from other sources.
4.4 VOLUME IV – FIRST TASK ORDER PROPOSAL
Offerors shall submit one (1) original and two (2) hard copies. Page Limitation: 3-pages
I V
TASK ORDER 0001 PROPOSAL VOLUME
TAB #1
Provide Price Proposal Electronic copy may be scanned but must be legible; electronically-generated and - signed documents are preferred.
(a) The first Task Order will be for project FTFA 16-1072, (Repair Roof Munitions Storage Magazine Building 984) at Eglin AFB. See Section J of the solicitation Attachment 9, FTFA 16-1027 Statement of Work. Site visit will be held at Building 984 on 04 MAY 2017 at 0900, see Attachment 11 (Directions).
(b) Offerors shall utilize their proposed Base Year pricing to submit a price proposal for the first Task Order. At a minimum the price proposal must include proposed line item and description from the Roofing Bid Schedule, proposed quantity, unit price, extended amount for each line item, total price and any assumptions the offeror has made in the development of the Task Order proposal.
(c) The evaluation of the first Task Order proposal will not be used in the selection process. After the apparent successful offerer is selected, and the disappointed offerors are notified, but before award, the Government will negotiate the first task order with the apparent successful offeror.
5. SITE VISIT AND BASE ACCESS FOR SITE VISIT
(a) An organized site visit for the first task order will be held, as mentioned in Section 4.4 paragraph A above. This will be the sole pre-proposal site visit for this requirement, no requests for individual site visits will be entertained. The site visit is not mandatory in order to propose on this requirement.
(b) If requesting base access, the Offeror must submit a completed Eglin AFB Form 90 (Attachment 12) and a written request, i.e. Base Access Memorandum (Template-Attachment 13) on company letterhead to the Contract Specialist (kevin.wesolowski.1@us.af.mil) and the Administering Contracting Officer (kristine.wright.2@us.af.mil) listing the following: the RFP number FA2823-17-R-4014, site visit date, hours of 0800-1200 complete name and last four (4) digits of SSN/Date of Birth /Driver’s License #/State of employee needing access to the base. Please note that anybody modifications or tattoos must be described on the affidavit, along with the location of the body modification or tattoo. The written request must specify the individual authorized to sign for a request for base identification credentials or temporary pass. The Contracting Officer or Contract Specialist will endorse the pass request memorandum and then send it with the affidavit to Security Forces for processing. Processing takes three (3) to five (5) business days before passes can be picked up. Passes can only be picked up on the date of the site visit.
6. RELATIONSHIP BETWEEN INSTRUCTIONS AND EVALUATION.
Your attention is directed to the functional relationship between Sections L and M of this solicitation.
Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. The Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.
7. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
8. AMENDMENT OF SOLICITATION PRIOR TO CLOSING.
The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such reservations or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the Federal Business Opportunities website (www.fbo.gov).
If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 18, providing signed copies of the amendments with their proposal.
9. ALTERNATE PROPOSALS
No alternate proposals will be accepted.
10. INCURRED EXPENSES
The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation. NO OFFERORS WILL BE COMPENSATED FOR
SUBMITTING A PROPOSAL.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .