STATEMENT OF WORK

Dated 11 March 2013

Scope: The work covered by this Paving IDIQ consists of furnishing all plant, materials, labor, equipment, and all operations required, in accordance with Plans and Technical Specifications

(dated 11 March 2013), Eglin AFB, Florida. The work may consist of resurfacing, full depth reconstruction, and new full depth construction of bituminous concrete and portland cement concrete pavements to include roadways, parking lots, and sidewalks, coldplaning of bituminous concrete pavement, construction of curb return widenings, new construction of bituminous concrete ramp-downs, crack repair in bituminous concrete pavement, new construction of concrete foundation walls and footings, slabs on grade adjusting of covers and frames and grates to be flush with new pavements, removal and resetting of existing concrete curbing, painting new pavement markings, rubber removal from airfield surfaces, and removal and reinstallation of existing parking bumper blocks and traffic control devices as well as placement of new parking bumper blocks and traffic control devices as required.