Attach_11_Statement_of_Work.pdf

PDF 47 KB Posted

Attached to
Paving IDIQ Federal contract opportunity
Solicitation number
FA2823-14-R-4019
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ, newest first.
File Type Posted
FA2823-14-R-4019_Amendment_04.pdf PDF
FA2823-14-R-4019_Paving_IDIQ_20_August_2014.pdf PDF
Attach_3_Bid_Schedule_Revised_18_Aug_14.xlsx XLSX spreadsheet
Q A_2.pdf PDF
Amendment_03_FA2823-14-R-4019.pdf PDF
FA2823-14-R-4019_Paving_IDIQ_11_August_2014.pdf PDF
Aerial_Photo.pdf PDF
FA2823-13-R-4019_L M_Paving_Rev_8-8-2014.pdf PDF
Attach_3_Bid_Schedule_Revised_8-8-14.xlsx XLSX spreadsheet
Attach_3_Bid_Schedule.xlsx XLSX spreadsheet
FA2823-14-R-4019_Paving_IDIQ_Revised_Solicitation.doc DOC document
Paving_IDIQ_Q A_30_July_14.pdf PDF
Amendment_02_FA2823-14-R-4019.pdf PDF
Amendment_01_FA2823-14-R-4019.doc DOC document
Attach_3_Bid_Schedule.pdf PDF
Attach_9_APPENDIX_C.pdf PDF
Attach_12_Seed_Statement_of_Work.pdf PDF
FA2823-14-R-4019_Paving_IDIQ_2014.doc DOC document
Attach_1_Paving_Specifications.pdf PDF
Attach_5_CAB_Affidavit.pdf PDF
Attach_8_APPENDIX_B.pdf PDF
Attach_4_Contract_Bonds_Checklist.pdf PDF
Attach_7_APPENDIX_A.pdf PDF
Attach_10_WD_3_Jan_2014.pdf PDF
Attach_6_Base_Access_Memorandum_Template.doc DOC document
Attach_2_Safety_Requirements.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Dated 11 March 2013

Scope: The work covered by this Paving IDIQ consists of furnishing all plant, materials, labor, equipment, and all operations required, in accordance with Plans and Technical Specifications

(dated 11 March 2013), Eglin AFB, Florida. The work may consist of resurfacing, full depth reconstruction, and new full depth construction of bituminous concrete and portland cement concrete pavements to include roadways, parking lots, and sidewalks, coldplaning of bituminous concrete pavement, construction of curb return widenings, new construction of bituminous concrete ramp-downs, crack repair in bituminous concrete pavement, new construction of concrete foundation walls and footings, slabs on grade adjusting of covers and frames and grates to be flush with new pavements, removal and resetting of existing concrete curbing, painting new pavement markings, rubber removal from airfield surfaces, and removal and reinstallation of existing parking bumper blocks and traffic control devices as well as placement of new parking bumper blocks and traffic control devices as required.

File details come from the government source that posted it. Updated .