Week 6
Question 90: Items 1018 and 1019. Are you asking the offerors to price the removal tanks from the ground or leave them in place and remove the contents inside the tank?
Answer 90: Remove contents and remove tank.
Question 91: Items 1018 and 1019. Is the number of units, one tank that is 400 gallons in size or
400 tanks? If it represents 400 tanks, how big are the tanks?
Answer 91: You are to price one tank removal and then the total price for 400 of those tanks.
1019A is a tank up to 1,000 gals, 1019B is a tank ranging from 1,001 to 5,000. Your pricing for
1910A will be to remove one 1,000 gal tank or smaller and then the total of 400 of those; B, C and D are calculated the same.
Question 92: Items 1018 and 1019. The quantity given in all sub line items is 400 Column C, and quantity in gal Column D. Does the government want to know our unit price for removing one tank? 400 tanks? 1 tank with 400 Gallon of content? If 400 tanks, we don't understand how that is a unit price, and if so why is the quantity given in gallons?
Answer 92: See answers above. Your pricing for 1019E is to remove "residual fuel" only, not a full tank. Your pricing will reflect the cost of removing "residual fuel" from one tank and then the total of removing "residual fuel" from 200 tanks.
Question 93: Regarding Line Items 1018 A, B, C and D. The quantities given in Column B range from 0-1000 (1018A) to >10000 (1018 D) but the quantity in Column C stays at 400.
Should the quantity in Column C change in Item 1018 B, C and D to be consistent with the size given in Column B?
Answer 93: No, you are to price one tank removal and then the total price for 400 of those tanks.
1019A is a tank up to 1,000 gals, 1019B is a tank ranging from 1019A is a tank up to 1,000 gals, 1019B is a tank ranging from 1,001 to 5,000. Your pricing for 1910A will be to remove one
1,000 gal tank or smaller and then the total of 400 of those; B, C and D are calculated the same.
Question 94: Regarding Line Items 1019 A, B, C and D. The quantities given in Column B range from 0-1000 (1019A) to >10000 (1019 D) but the quantity in Column C stays at 400.
Should the quantity in Column C change in Item 1018 B, C and D to be consistent with the size given in Column B?
Answer 94: See answer above...
Question 95: Items under 1001 – Do these line items include interior walls and footings/foundations? Or are walls covered only under item 1002 and foundations/footings only under 1005? That is – do items under 1001 include the entire building, all walls, and foundation/footings?
Answer 95: This line item (1001) is all encompassing, meaning it includes everything inside the building. Footings and Foundations are included under 1005 and 1006. Walls are included exclusively under Item 1002.
Question 96: Follow-up to answer 71 (RE: item 1012) – Asbestos disposal, contaminated soil disposal, and ‘other materials’ can have significantly different hazardous material disposal costs.
Please confirm what ‘other materials’ are to be included in this line item.
Answer 96: This line item is for all hazardous materials, i. e. asbestos, lead base paint, and the like. See General Environmental Protection (Section 01500) of the Demo Spec. Contaminated soil disposal is covered under line item # 1019F.
Question 97: Follow-up to answer 83 (RE: item 1019) – Please confirm that there is no fee for disposal of gas and/or diesel fuel through Eglin’s Haz-waste contract and recycle center, respectively.
Answer 97: There is no fee. Demo contractor will only be required to remove residual fuel from tank; otherwise, tank will be emptied before contractor gets project.
Question 98: Item 1003 – Do these item descriptions (i.e., asphalt 7” to 10” thick) include asphalt/concrete thickness only? Or is base material figured into the thicknesses?
Answer 98: Only includes pavement thickness, does not include sub base.
Question 99: Item 1003 – If base material is not figured into the item description quantities, is base material to be removed as well? If so, what thickness of base material should be added for bidding purposes?
Answer 99: If base material is to be included on project, line item 1008 and 1011 are to be used.
Question 100: Item 1019 – Are these items to include soil sampling for closure and closure report preparation and submittal?
Answer 100: Yes
Question 101: Can we submit completed PPQs prepared by contracting officers on previous solicitations since we are having trouble locating the evaluators for some of our past projects due to deployments, etc?
Answer 101: An offeror’s previous past performance questionnaires can be submitted in Volume
II, but our Appendix A and Appendix B must be used for Volume III.
Question 102: Will the Government please clarify the requirement in Section K of the RFP for
FAR 52.204-8 and DFARS 252.204-7007, which both refer to the ORCA database that has been replaced by the System for Award Management (SAM)? Current versions of FAR 52.204-8 and
DFARS 252.204-7007 have updated language to include SAM. Will the Government please update the Section K language to incorporate the SAM requirement?
Answer 102: It has been updated in the solicitation.