Text version
General Decision Number: FL130029 03/29/2013 FL29
Superseded General Decision Number: FL20120029
State: Florida
Construction Type: Building
County: Okaloosa County in Florida.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/04/2013
1 03/29/2013
* ENGI0653-009 10/01/2012
Rates Fringes
OPERATOR: Concrete Pump, Truck Mounted....................$ 25.30 11.13
OPERATOR: Mechanic..............$ 25.30 11.13
OPERATOR: Oiler.................$ 23.85 11.13
OPERATOR: Boom Truck.............$ 25.30 11.13
IRON0798-006 10/01/2008
IRONWORKER, ORNAMENTAL AND
REINFORCING......................$ 22.03 11.75
* PAIN0164-002 09/01/2011
PAINTER: Spray..................$ 17.50 7.93
PLUM0366-004 08/01/2012
PIPEFITTER (HVAC Pipe
Installation)....................$ 22.36 9.26
SUFL2009-025 05/22/2009
BRICKLAYER.......................$ 17.08 0.00
CARPENTER, Includes
Acoustical Ceiling
Installation, Drywall
Hanging, and Form Work...........$ 12.96 0.00
CEMENT MASON/CONCRETE FINISHER...$ 12.90 0.00
ELECTRICIANS, Including Low
Voltage Wiring for Phones and
Alarms...........................$ 13.91 0.00
IRONWORKER, STRUCTURAL...........$ 14.10 0.00
LABORER: Asphalt Shoveler.......$ 7.88 0.00
LABORER: Common or General......$ 8.50 0.00
LABORER: Concrete Saw (Hand
Held/Walk Behind)................$ 12.63 0.00
LABORER: Mason Tender - Brick...$ 10.75 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 12.83 1.90
LABORER: Pipelayer..............$ 10.00 0.00
LABORER: Roof Tearoff...........$ 9.00 0.00
LABORER: Landscape and
Irrigation.......................$ 9.45 0.00
MECHANICAL INSULATOR,
Including Duct and Pipe
Insulation.......................$ 13.10 0.00
OPERATOR: Asphalt Spreader......$ 11.41 0.00
OPERATOR: Backhoe/Excavator.....$ 11.00 0.00
OPERATOR: Bulldozer.............$ 15.01 0.00
OPERATOR: Crane.................$ 19.00 0.73
OPERATOR: Distributor...........$ 12.37 0.00
OPERATOR: Forklift..............$ 14.00 0.00
OPERATOR: Grader/Blade..........$ 13.73 0.00
OPERATOR: Loader................$ 13.80 1.79
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 11.69 0.00
OPERATOR: Roller................$ 10.68 0.00
OPERATOR: Screed................$ 11.34 0.00
OPERATOR: Tractor...............$ 9.91 0.00
OPERATOR: Trencher..............$ 11.75 0.00
PAINTER: Brush and Roller.......$ 12.21 0.00
PIPEFITTER, Excludes HVAC
Pipe Installation................$ 13.86 0.00
PLUMBER..........................$ 15.51 0.00
ROOFER (Installation of Metal
Roofs Only)......................$ 14.26 0.59
ROOFER, Includes Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply, Slate, & Tile Roofs (Excludes
Installation of Metal Roofs).....$ 13.80 0.00
SHEET METAL WORKER, Includes
HVAC Duct Installation...........$ 12.68 0.00
Sprinkler Fitters................$ 12.38 0.74
TILE SETTER......................$ 18.00 0.00
TRUCK DRIVER: Dump Truck........$ 10.00 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.09 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: FL130036 03/29/2013 FL36
Superseded General Decision Number: FL20120036
County: Santa Rosa County in Florida.
* ENGI0653-009 10/01/2012
OPERATOR: Concrete Pump, Truck Mounted....................$ 25.30 11.13
OPERATOR: Mechanic..............$ 25.30 11.13
OPERATOR: Oiler.................$ 23.85 11.13
OPERATOR: Boom Truck.............$ 25.30 11.13
IRON0798-006 10/01/2008
IRONWORKER, ORNAMENTAL AND
* PAIN0164-002 09/01/2011
PAINTER: Spray..................$ 17.50 7.93
PLUM0366-004 08/01/2012
PIPEFITTER (HVAC Pipe
Installation)....................$ 22.36 9.26
SUFL2009-032 05/22/2009
BRICKLAYER.......................$ 17.59 0.00
CARPENTER, Includes
Acoustical Ceiling
Installation, Drywall
Finishing/Taping, and Drywall
Hanging..........................$ 14.00 0.00
CEMENT MASON/CONCRETE FINISHER...$ 12.92 0.00
ELECTRICIAN......................$ 16.37 0.00
INSULATOR - PIPE & PIPEWRAPPER...$ 13.13 3.03
IRONWORKER, STRUCTURAL...........$ 16.00 0.00
LABORER: Asphalt Shoveler.......$ 7.88 0.00
LABORER: Common or General......$ 10.00 0.70
LABORER: Concrete Saw (Hand
Held/Walk Behind)................$ 12.63 0.00
LABORER: Mason Tender - Brick...$ 10.75 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 12.83 1.90
LABORER: Pipelayer..............$ 10.00 0.00
LABORER: Roof Tearoff...........$ 9.00 0.00
LABORER: Landscape and
Irrigation.......................$ 9.45 0.00
OPERATOR: Asphalt Spreader......$ 11.41 0.00
OPERATOR: Backhoe/Excavator.....$ 11.27 0.00
OPERATOR: Bulldozer.............$ 15.01 0.00
OPERATOR: Crane.................$ 19.00 0.73
OPERATOR: Distributor...........$ 12.37 0.00
OPERATOR: Forklift..............$ 14.00 0.00
OPERATOR: Grader/Blade..........$ 13.73 0.00
OPERATOR: Loader................$ 13.80 1.79
Aggregate, and Concrete).........$ 11.69 0.00
OPERATOR: Roller................$ 10.68 0.00
OPERATOR: Screed................$ 11.34 0.00
OPERATOR: Tractor...............$ 9.91 0.00
OPERATOR: Trencher..............$ 11.75 0.00
PAINTER: Brush and Roller.......$ 12.39 0.50
PIPEFITTER, Excludes HVAC
Pipe Installation................$ 13.86 0.00
PLASTERER........................$ 14.88 0.00
PLUMBER..........................$ 17.00 0.33
ROOFER (Installation of Metal
Roofs Only)......................$ 14.26 0.59
ROOFER, Includes Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply, Slate, & Tile Roofs (Excludes
Installation of Metal Roofs).....$ 11.00 0.00
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 16.39 4.34
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 11.64
TILE SETTER......................$ 18.00 0.00
TRUCK DRIVER: Dump Truck........$ 10.00 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.11 0.00 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates
* a Wage and Hour Division letter setting forth a position on because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
U.S. Department of Labor
General Decision Number: FL130070 03/29/2013 FL70
Superseded General Decision Number: FL20120070
County: Walton County in Florida.
ELEC1205-004 09/03/2012
ELECTRICIAN......................$ 22.78 14%+5.43
* ENGI0653-010 10/01/2012
OPERATOR: Crane
100 Tons & Over
(Conventional & Hydraulic)
& Tower Cranes..............$ 26.30 11.13
Under 100 Tons..............$ 25.30 11.13
Cranes with 350 feet or more boom and/or 400 ton capacity -additional $1.10 per hour.
Cranes with 500 feet boom and/or 600 ton capacity -additional $1.45 per hour.
IRON0798-007 10/01/2008
IRONWORKER, STRUCTURAL AND
PLAS0148-005 07/01/2012
CEMENT MASON/CONCRETE FINISHER...$ 22.50 6.29
SUFL2009-066 05/22/2009
CARPENTER, Includes Form Work....$ 14.02 1.33
LABORER: Common or General......$ 8.48 0.00
LABORER: Pipelayer..............$ 11.42 1.95
OPERATOR: Backhoe/Excavator.....$ 12.43 0.00
Aggregate, and Concrete).........$ 9.58 0.00
PAINTER: Brush, Roller and
Spray............................$ 10.10 0.00
PLASTERER........................$ 15.90 0.00
PLUMBER..........................$ 10.48 2.06
ROOFER: Built Up, Composition, Hot Tar and
Single Ply.......................$ 12.00 0.00
HVAC Duct Installation...........$ 11.72 2.19
TRUCK DRIVER, Includes Dump and 10 Yard Haul Away............$ 8.00 0.15 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates
* a Wage and Hour Division letter setting forth a position on because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
U.S. Department of Labor
General Decision Number: FL130052 07/26/2013 FL52
Superseded General Decision Number: FL20120052
County: Gulf County in Florida.
2 07/26/2013
* ELEC1205-004 06/03/2013
ELECTRICIAN......................$ 23.08 14%+5.43
ENGI0653-010 10/01/2012
OPERATOR: Crane
100 Tons & Over
(Conventional & Hydraulic)
& Tower Cranes..............$ 26.30 11.13
Under 100 Tons..............$ 25.30 11.13
Cranes with 350 feet or more boom and/or 400 ton capacity -additional $1.10 per hour.
Cranes with 500 feet boom and/or 600 ton capacity -additional $1.45 per hour.
IRON0798-007 10/01/2008
IRONWORKER, STRUCTURAL AND
SUFL2009-048 05/22/2009
CARPENTER........................$ 13.63 1.14
CEMENT MASON/CONCRETE FINISHER...$ 11.50 0.00
LABORER: Common or General......$ 8.14 0.00
LABORER: Pipelayer..............$ 11.42 1.95
OPERATOR: Backhoe/Excavator.....$ 12.43 0.00
Aggregate, and Concrete).........$ 9.58 0.00
PAINTER: Brush, Roller and
Spray............................$ 10.10 0.00
PLASTERER........................$ 15.90 0.00
PLUMBER..........................$ 10.48 2.06
ROOFER: Built Up, Composition, Hot Tar and
Single Ply.......................$ 12.00 0.00
HVAC Duct Installation...........$ 11.72 2.19
TRUCK DRIVER, Includes Dump and 10 Yard Haul Away............$ 8.00 0.15 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates
* a Wage and Hour Division letter setting forth a position on
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial