Attach_11_WDs.pdf

PDF 87 KB Posted

Attached to
Demolition IDIQ Federal contract opportunity
Solicitation number
FA2823-13-R-0002
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment 11- Wage Determinations

View the file

Other files for this federal contract opportunity

Other files attached to Demolition IDIQ, newest first.
File Type Posted
Cumulative_Q A.pdf PDF
QA_Week_7.pdf PDF
FA2823-13-R-0002-0004.pdf PDF
QA_Week_6.pdf PDF
FA2823-13-R-0002_Sign_In_Sheet.pdf PDF
QA_Week_5.pdf PDF
QA_Week_4.pdf PDF
FA2823-13-R-0002-0003.pdf PDF
Attach_3_IDIQ_Demo_Bid_Schedule.xls XLS spreadsheet
QA_Week_3_Rev.pdf PDF
Site_Visit_Memorandum_Template.doc DOC document
Attach_3_IDIQ_Demo_Bid_Schedule.xls XLS spreadsheet
FA2823-13-R-0002-0002.pdf PDF
QA_Week_3.pdf PDF
QA_Week_2.pdf PDF
13-R-0002-0001.doc DOC document
QA_Week_1_Rev.pdf PDF
QA_Week_1.pdf PDF
Attach_8_APPENDIX_A.pdf PDF
Attach_8_APPENDIX_A.pdf PDF
FA2823-13-R-0002.pdf PDF
Attach_10_APPENDIX_C.pdf PDF
Attach_3_IDIQ_Demo_Bid_Schedule.xls XLS spreadsheet
Attach_12_FTFA_12-1030_Statement_of_Work.pdf PDF
Attach_1_Specifications.pdf PDF
Attach_4_Contract_Bonds_Checklist.pdf PDF
Attach_9_APPENDIX_B.pdf PDF
Attach_2_Specifications_Attachment_1.pdf PDF
Attach_5_CAB_Affidavit.pdf PDF
Attach_7_Site_Visit_Driving_Directions.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: FL130029 03/29/2013 FL29

Superseded General Decision Number: FL20120029

State: Florida

Construction Type: Building

County: Okaloosa County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 01/04/2013

1 03/29/2013

* ENGI0653-009 10/01/2012

Rates Fringes

OPERATOR: Concrete Pump, Truck Mounted....................$ 25.30 11.13

OPERATOR: Mechanic..............$ 25.30 11.13

OPERATOR: Oiler.................$ 23.85 11.13

OPERATOR: Boom Truck.............$ 25.30 11.13

IRON0798-006 10/01/2008

IRONWORKER, ORNAMENTAL AND

REINFORCING......................$ 22.03 11.75

* PAIN0164-002 09/01/2011

PAINTER: Spray..................$ 17.50 7.93

PLUM0366-004 08/01/2012

PIPEFITTER (HVAC Pipe

Installation)....................$ 22.36 9.26

SUFL2009-025 05/22/2009

BRICKLAYER.......................$ 17.08 0.00

CARPENTER, Includes

Acoustical Ceiling

Installation, Drywall

Hanging, and Form Work...........$ 12.96 0.00

CEMENT MASON/CONCRETE FINISHER...$ 12.90 0.00

ELECTRICIANS, Including Low

Voltage Wiring for Phones and

Alarms...........................$ 13.91 0.00

IRONWORKER, STRUCTURAL...........$ 14.10 0.00

LABORER: Asphalt Shoveler.......$ 7.88 0.00

LABORER: Common or General......$ 8.50 0.00

LABORER: Concrete Saw (Hand

Held/Walk Behind)................$ 12.63 0.00

LABORER: Mason Tender - Brick...$ 10.75 0.00

LABORER: Mason Tender -

Cement/Concrete..................$ 12.83 1.90

LABORER: Pipelayer..............$ 10.00 0.00

LABORER: Roof Tearoff...........$ 9.00 0.00

LABORER: Landscape and

Irrigation.......................$ 9.45 0.00

MECHANICAL INSULATOR,

Including Duct and Pipe

Insulation.......................$ 13.10 0.00

OPERATOR: Asphalt Spreader......$ 11.41 0.00

OPERATOR: Backhoe/Excavator.....$ 11.00 0.00

OPERATOR: Bulldozer.............$ 15.01 0.00

OPERATOR: Crane.................$ 19.00 0.73

OPERATOR: Distributor...........$ 12.37 0.00

OPERATOR: Forklift..............$ 14.00 0.00

OPERATOR: Grader/Blade..........$ 13.73 0.00

OPERATOR: Loader................$ 13.80 1.79

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 11.69 0.00

OPERATOR: Roller................$ 10.68 0.00

OPERATOR: Screed................$ 11.34 0.00

OPERATOR: Tractor...............$ 9.91 0.00

OPERATOR: Trencher..............$ 11.75 0.00

PAINTER: Brush and Roller.......$ 12.21 0.00

PIPEFITTER, Excludes HVAC

Pipe Installation................$ 13.86 0.00

PLUMBER..........................$ 15.51 0.00

ROOFER (Installation of Metal

Roofs Only)......................$ 14.26 0.59

ROOFER, Includes Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply, Slate, & Tile Roofs (Excludes

Installation of Metal Roofs).....$ 13.80 0.00

SHEET METAL WORKER, Includes

HVAC Duct Installation...........$ 12.68 0.00

Sprinkler Fitters................$ 12.38 0.74

TILE SETTER......................$ 18.00 0.00

TRUCK DRIVER: Dump Truck........$ 10.00 0.00

TRUCK DRIVER: Lowboy Truck......$ 12.09 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: FL130036 03/29/2013 FL36

Superseded General Decision Number: FL20120036

County: Santa Rosa County in Florida.

* ENGI0653-009 10/01/2012

OPERATOR: Concrete Pump, Truck Mounted....................$ 25.30 11.13

OPERATOR: Mechanic..............$ 25.30 11.13

OPERATOR: Oiler.................$ 23.85 11.13

OPERATOR: Boom Truck.............$ 25.30 11.13

IRON0798-006 10/01/2008

IRONWORKER, ORNAMENTAL AND

* PAIN0164-002 09/01/2011

PAINTER: Spray..................$ 17.50 7.93

PLUM0366-004 08/01/2012

PIPEFITTER (HVAC Pipe

Installation)....................$ 22.36 9.26

SUFL2009-032 05/22/2009

BRICKLAYER.......................$ 17.59 0.00

CARPENTER, Includes

Acoustical Ceiling

Installation, Drywall

Finishing/Taping, and Drywall

Hanging..........................$ 14.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 12.92 0.00

ELECTRICIAN......................$ 16.37 0.00

INSULATOR - PIPE & PIPEWRAPPER...$ 13.13 3.03

IRONWORKER, STRUCTURAL...........$ 16.00 0.00

LABORER: Asphalt Shoveler.......$ 7.88 0.00

LABORER: Common or General......$ 10.00 0.70

LABORER: Concrete Saw (Hand

Held/Walk Behind)................$ 12.63 0.00

LABORER: Mason Tender - Brick...$ 10.75 0.00

LABORER: Mason Tender -

Cement/Concrete..................$ 12.83 1.90

LABORER: Pipelayer..............$ 10.00 0.00

LABORER: Roof Tearoff...........$ 9.00 0.00

LABORER: Landscape and

Irrigation.......................$ 9.45 0.00

OPERATOR: Asphalt Spreader......$ 11.41 0.00

OPERATOR: Backhoe/Excavator.....$ 11.27 0.00

OPERATOR: Bulldozer.............$ 15.01 0.00

OPERATOR: Crane.................$ 19.00 0.73

OPERATOR: Distributor...........$ 12.37 0.00

OPERATOR: Forklift..............$ 14.00 0.00

OPERATOR: Grader/Blade..........$ 13.73 0.00

OPERATOR: Loader................$ 13.80 1.79

Aggregate, and Concrete).........$ 11.69 0.00

OPERATOR: Roller................$ 10.68 0.00

OPERATOR: Screed................$ 11.34 0.00

OPERATOR: Tractor...............$ 9.91 0.00

OPERATOR: Trencher..............$ 11.75 0.00

PAINTER: Brush and Roller.......$ 12.39 0.50

PIPEFITTER, Excludes HVAC

Pipe Installation................$ 13.86 0.00

PLASTERER........................$ 14.88 0.00

PLUMBER..........................$ 17.00 0.33

ROOFER (Installation of Metal

Roofs Only)......................$ 14.26 0.59

ROOFER, Includes Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply, Slate, & Tile Roofs (Excludes

Installation of Metal Roofs).....$ 11.00 0.00

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 16.39 4.34

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 11.64

TILE SETTER......................$ 18.00 0.00

TRUCK DRIVER: Dump Truck........$ 10.00 0.00

TRUCK DRIVER: Lowboy Truck......$ 12.11 0.00 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

* a Wage and Hour Division letter setting forth a position on because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: FL130070 03/29/2013 FL70

Superseded General Decision Number: FL20120070

County: Walton County in Florida.

ELEC1205-004 09/03/2012

ELECTRICIAN......................$ 22.78 14%+5.43

* ENGI0653-010 10/01/2012

OPERATOR: Crane

100 Tons & Over

(Conventional & Hydraulic)

& Tower Cranes..............$ 26.30 11.13

Under 100 Tons..............$ 25.30 11.13

Cranes with 350 feet or more boom and/or 400 ton capacity -additional $1.10 per hour.

Cranes with 500 feet boom and/or 600 ton capacity -additional $1.45 per hour.

IRON0798-007 10/01/2008

IRONWORKER, STRUCTURAL AND

PLAS0148-005 07/01/2012

CEMENT MASON/CONCRETE FINISHER...$ 22.50 6.29

SUFL2009-066 05/22/2009

CARPENTER, Includes Form Work....$ 14.02 1.33

LABORER: Common or General......$ 8.48 0.00

LABORER: Pipelayer..............$ 11.42 1.95

OPERATOR: Backhoe/Excavator.....$ 12.43 0.00

Aggregate, and Concrete).........$ 9.58 0.00

PAINTER: Brush, Roller and

Spray............................$ 10.10 0.00

PLASTERER........................$ 15.90 0.00

PLUMBER..........................$ 10.48 2.06

ROOFER: Built Up, Composition, Hot Tar and

Single Ply.......................$ 12.00 0.00

HVAC Duct Installation...........$ 11.72 2.19

TRUCK DRIVER, Includes Dump and 10 Yard Haul Away............$ 8.00 0.15 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

* a Wage and Hour Division letter setting forth a position on because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: FL130052 07/26/2013 FL52

Superseded General Decision Number: FL20120052

County: Gulf County in Florida.

2 07/26/2013

* ELEC1205-004 06/03/2013

ELECTRICIAN......................$ 23.08 14%+5.43

ENGI0653-010 10/01/2012

OPERATOR: Crane

100 Tons & Over

(Conventional & Hydraulic)

& Tower Cranes..............$ 26.30 11.13

Under 100 Tons..............$ 25.30 11.13

Cranes with 350 feet or more boom and/or 400 ton capacity -additional $1.10 per hour.

Cranes with 500 feet boom and/or 600 ton capacity -additional $1.45 per hour.

IRON0798-007 10/01/2008

IRONWORKER, STRUCTURAL AND

SUFL2009-048 05/22/2009

CARPENTER........................$ 13.63 1.14

CEMENT MASON/CONCRETE FINISHER...$ 11.50 0.00

LABORER: Common or General......$ 8.14 0.00

LABORER: Pipelayer..............$ 11.42 1.95

OPERATOR: Backhoe/Excavator.....$ 12.43 0.00

Aggregate, and Concrete).........$ 9.58 0.00

PAINTER: Brush, Roller and

Spray............................$ 10.10 0.00

PLASTERER........................$ 15.90 0.00

PLUMBER..........................$ 10.48 2.06

ROOFER: Built Up, Composition, Hot Tar and

Single Ply.......................$ 12.00 0.00

HVAC Duct Installation...........$ 11.72 2.19

TRUCK DRIVER, Includes Dump and 10 Yard Haul Away............$ 8.00 0.15 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

File details come from the government source that posted it. Updated .