Questions and our responses for week 5
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Week 5
Question 83: Item 1019 – Is this item for non-hazardous petroleum impacted disposal only?
Answer 83: No, it is for both.
- Gasoline, because of the low flash point is considered a Haz substance. For disposal of used gasoline, users have to drum it up, and it is disposed of thru Eglin's Haz-waste contract
- Diesel, because of the high flash point is considered and Non-Haz substance.
Used diesel is disposed of through Eglin's Recycle Center.
Question 84: On average, how many buildings were demolished under the last contract per year?
Answer 84: On average, 286 buildings and other structures were demolished per year.
Question 85: Line Items 0010AA, AB, AC Utilities: Quantity of 400. Does the government want the offeror to price the removal of 400 of each size of HVAC unit? Should the quantity, Column C be one? And the unit measure, column D be each?
Answer 85: Offeror needs to apply a cost per unit (Column E, 1 each) and multiply by
400 for the total (column F).
Question 86: Line Items 0018A, B, C, D Underground Storage Tank Removal (Fiberglass)
Quantity of 400 tanks. Does the government want the offeror to price the removal of 400 of tanks in each size category? Should the quantity, Column C be one? And the unit measure, column D be each?
Answer 86: Offeror needs to apply a cost per unit (Column E, 1 each) and multiply by
Question 87: Line Items 0019A, B, C, D Underground Storage Tank Removal (Steel) Quantity of 400 tanks. Does the government want the offeror to price the removal of 400 tanks in each size category? Should the quantity, Column C be one? And the unit measure, column D be each?
Answer 87: Offeror needs to apply a cost per unit (Column E, 1 each) and multiply by
Question 88: There are no quantities given for these line items: 1015AB, 1031A, 1031B and
1031C. Is this intentional or should there be quantities?
Answer 88: There are quantities for 1015AB. Line items 1031A, 1031B and 1031C are header items for different size pipes, and the quantities are listed in the subsequent line items.
Question 89: Are there any limitations in the contract value for the projects used in the PPQ's?
Answer 89: There are no limitations, but please refer to the definition of relevant in Section L and Section M: “Performance of demolition work which is the same or similar in scope as described in the solicitation, including the specifications, safety requirements, contract type, contract environment, subcontractor interaction, and price.” Projects or contracts that are a similar magnitude as described in this solicitation will be deemed more relevant than those not.
Please see Section M Table 2.0.