This document outlines a federal contract solicitation for renovation and equipping of basic rehabilitation units in Mexico. The Foreign Humanitarian Assistance Program of the Department of the Air Force Space Command, in coordination with Development of the Family, requires support for 17 basic rehabilitation units across 4 Mexican states. A site survey of all locations has been completed, allowing contractors to review necessary modifications and required equipment. Questions are due by 7 August 2020 at 1300 hours. Contractors should submit responses providing renovation and medical equipment for the identified units per the site survey specifications. Award timing is not stated but work will involve coordination with both U.S. and Mexican government entities.

View the file

Other files for this federal contract opportunity

Other files attached to NORAD/ USNORTHCOM J49 Mexico Basic Rehabilitation Units, newest first.
File Type Posted
Project 63977.pdf PDF
Project 63975.pdf PDF
Project 63981.pdf PDF
Project 40827.pdf PDF
Project 63973.pdf PDF
Project 63967.pdf PDF
Project 63969.pdf PDF
Project 63968.pdf PDF
Project 63978.pdf PDF
Project 63979.pdf PDF
Project 63976.pdf PDF
Project 63974.pdf PDF
Project 63971.pdf PDF
Project 63970.pdf PDF
Project 40826.pdf PDF
Project 40828.pdf PDF
UBR Questions - Responses.docx DOCX document
Guerrero Metlatonoc 1.pdf PDF
Guerrero Coyuca De Catala.pdf PDF
Guerrero Xochistlahuaca 2.pdf PDF
Chiapas Oxchuc one of two.pdf PDF
Guerrero Zirandaro 1.pdf PDF
Guerrero Coyuca De Catala 2.pdf PDF
Chiapas El Parral.pdf PDF
Chiapas Zinacantan.pdf PDF
Guerrero BuenaVista De Cue 2.pdf PDF
Guerrero Tlapa de Comonfort 3.pdf PDF
Veracruz Playa Vicente.pdf PDF
Guerrero Tlapa de Comonfort 1.pdf PDF
Guerrero BuenaVista De Cue.pdf PDF
Chiapas Oxchuc two of two.pdf PDF
Oaxaca San Juan Bautista Valle.pdf PDF
Guerrero Coyuca De Benitez.pdf PDF
Guerrero Metlatonoc 2.pdf PDF
Guerrero Xochistlahuaca 1.pdf PDF
Chiapas Altamirano.pdf PDF
Oaxaca San Felipe Jalapa de d.pdf PDF
Chiapas Ocosingo Two of two.pdf PDF
Guerrero Zirandaro 2.pdf PDF
Guerrero Tlapa de Comonfort 2.pdf PDF
Chiapas Ocosingo One of two.pdf PDF
Updated J49_Mexico_UBRs_Combo L and M.docx.docx DOCX document
QASP_J49_CRB 20-0011_29 May 20.docx DOCX document
Facility Schematics Compilation_UBRs.docx DOCX document
Attch 5 - FFP Pricing Summary Page.xlsx XLSX spreadsheet
J49_Mexico_UBRs_Combo L and M.docx DOCX document
Anticipated UBR Equipment.docx DOCX document
Solicitation - FA259520R0007.pdf PDF
6 PWS-Mexico_UBR Final.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DSCA Number: MX-SubH-2020-00063972 Last project activity: "Comment" on 6/10/2020 Project Step: Oversight Approved

★★ DIF Basic Rehabilitation Unit - Larrainzar, Chiapas (ID 63972)

SUBPROJECT BASIC INFO: 1. Project, Name, Summary Part of Umbrella Project: MX-UP-0000-00040798 Title: DIF Basic Rehabilitation Units Umbrella

Sub Project Name* Type* Estimated Cost DIF Basic Rehabilitation Unit - Larrainzar, Chiapas Subproject HA $28,490 Country* Project Time Frame Fiscal Year for Funding Mexico 9/1/2020 to 6/30/2021 2020 Executive Summary* Through this subproject, USNORTHCOM will partner with DIF (The System for the Comprehensive Development of the Family) to strengthen the rehabilitation services offered outside of major urban centers serving highly marginalized populations in Larrainzar, Chiapas, through a Basic Rehabilitation Unit (UBR). USNORTHCOM will purchase equipment, materials, and any needed renovations for the center, which will provide basic services to those most in need.

Sector* Lead Sub-sector* Health Support Disability/disabled SUBPROJECT BASIC INFO: 2. Project Contact Project Created By Jena Daggett, Assessments, Monitoring, and Evaluation Analyst (7195540858) jena.r.daggett.ctr@mail.mil Primary Component/Implementing Organization Points of Contacts Implementor: Isac Olivas (HA Specialist, ODC MEXICO) Phone: 55 61224575 jose.i.olivasvega.fn@mail.mil Primary: Jena Daggett (AM&E Analyst, NORAD & NORTHCOM) Phone: 719-554-0858 jena.r.daggett.ctr@mail.mil SUBPROJECT BASIC INFO: 3. Project Location Location* Mexico Chiapas Larrainzar Coordinates: 16.881754 -92.713702 Why was this location selected?* The site for the center was chosen and visited by DIF National as a town where the population is highly marginalized and lacks access to areas with rehabilitative services.

SUBPROJECT BASIC INFO: 4. Objective Objective* Renovate and equip an UBR in Larrainzar, Chiapas.

Is this a construction project?* Yes If construction, describe oversight and who will execute construction.

1/3 javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$linkbuttonFavorite%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) https://www.ohasis.org/OHASIS/projects/ProjectDetails.aspx?pid=40798&MACGLCEVHBBNGOGF mailto:jena.r.daggett.ctr@mail.mil mailto:jose.i.olivasvega.fn@mail.mil mailto:jena.r.daggett.ctr@mail.mil https://www.ohasis.org/OHASIS/SearchResults/SearchResultsDashboard.aspx?CID=158&GBYIJIIVHVQRLUBS javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$CoordinationViewControl$dummyLinkResponse%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$CoordinationViewControl$dummyLinkReminderEmail%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$CoordinationViewControl$dummyLinkReminderEmailErr%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$LinkbuttonHidden%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true))

Through USNORTHCOM components, this project will be available for bidding following approval. The organization that receives the bid will be responsible for construction; USNORTHCOM HA action officers and ODC-Mexico action officers will provide oversight throughout the process.

If construction, and if the estimated cost exceeds $500,000, please provide sufficient justification.

N/A for subprojects.

SUBPROJECT BASIC INFO: 5. Sustainability and After Action Reporting (AAR)

1. What is the sustainability plan for this project?* This project, upon completion, will be sustained by National DIF, who oversees the centers.

2. Which host nation entities will the goods and services be transferred to?* The donated items will be transferred to DIF.

3. Which U.S. Government entity will be responsible for evaluating the project one year after completion?* Note that this denotes responsibility for AAR completion.

The USNORTHCOM HA Program is responsible for AAR completion and will also evaluate during the biennial CPM report.

SUBPROJECT FILES: Attach Documents and Photos (optional) The highest classification of files and data on this system is UNCLASSIFIED. NO PII information allowed (SSNs, DOBs, etc.). By using this upload system you acknowledge and agree to the requirement to NOT exceed UNCLASSIFIED.

Files associated with this project: Upload Files Show Thumbnails? DOWNLOAD All Files

File Size Uploaded By Date Description Category

Larrainzar Land Title.pdf 328K Jena Daggett 6/10/2020 Land Title Land Ownership

ENG_Larrainzar_Site Survey Report.pdf 230K Jena Daggett 6/10/2020 Site Survey Report Surveys, Plans, Procedures, Risk Assessment

ENG_Larrainzar_Renovation Equipment List.pdf 83K Jena Daggett 6/10/2020 Requested Equipment Equipment & Supply Lists

SUBPROJECT Comments The following are comments that have been added to this project:

Date This subproject was previously under a subproject for the state of Chiapas. As such, coordination/concurrence was conducted by: USAID on 25JUN19; legal 11JUN19; EMB on 11JUN19.

Jena Daggett Assessments, Monitoring, and Evaluation Analyst - NORTHCOM

[COCOM]

6-10-

SUBPROJECT Coordination Summary

Open coordination tasks have a WHITE indicator if not required, YELLOW if required, RED if required and past Due. Completed coordination tasks are GREEN if Concurred and BLUE if Not Concurred or marked N/A.

No Coordination Tasks.

SUBPROJECT Status Field Team (SCO function) CCMD DSCA

Resubmitted (Add. Info Provided) Paul McKean-NORTHCOM (6/12/2020)

Resubmitted (Add. Info Provided)

Resubmitted (Add. Info Provided)

Approved Joseph Webb-DSCA (6/19/2020)

Show Status History SUBPROJECT Funding Defense Accounting Initiative (DAI) Summary: Data imported from DAI, the financial system of record for OHDACA No DAI Funding Information Recorded for Project OHASIS Funding Transactions: Data manually entered into OHASIS No Funding Information Recorded for Project

SUBPROJECT Actual Costs and Activities

2/3 https://www.ohasis.org/OHASIS/HttpHandler/DocumentHandler.ashx?Zip=63972 javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonSortFile%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonSortSize%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonUploadedBy%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonDate%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonDescription%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$ProjectFilesViewControl$LinkButtonCategory%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true)) https://www.ohasis.org/OHASIS/HttpHandler/DocumentHandler.ashx?DocumentsID=121504 https://www.ohasis.org/OHASIS/HttpHandler/DocumentHandler.ashx?DocumentsID=121503 https://www.ohasis.org/OHASIS/HttpHandler/DocumentHandler.ashx?DocumentsID=121502 javascript:WebForm_DoPostBackWithOptions(new%20WebForm_PostBackOptions(%22ctl00$ContentPlaceHolder1$ProjectDetailsControl2_63972$StatusViewControl$LinkButtonShowHistory%22,%20%22%22,%20true,%20%22%22,%20%22%22,%20false,%20true))

3/3

★ DIF Basic Rehabilitation Unit - Larrainzar, Chiapas (ID 63972)

File details come from the government source that posted it. Updated .