This solicitation is for the replacement of domestic water pumps and piping infrastructure at Building 420 at Space Force Base Glen. Rather than two large pumps, the new system will utilize a combination of small, medium, and jockey pumps operating on variable frequency drives to cover a wider normal flow range of 100 to 600 gallons per minute. Three medium pumps running in parallel will meet maximum daily demand plus fire flow requirements, with a fourth identical medium pump as a standby. The existing diesel fire pump will remain. Table 1 of the attached design analysis lists the major pump and VFD equipment. All steel piping will be replaced with resized pipes for the new pump flows and equipped with new valves and fittings for ease of maintenance. The contractor will install a new fire department connection in an approved, easily accessible location from the roadway. The Air Force is soliciting proposals due by the date specified in solicitation number FA2550-20-R-0002 to provide a reliable water supply over a range of conditions throughout the day and year at the specified distribution pressures.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN ANALYSIS REPORT
REPAIR BY REPLACING DOMESTIC WATER
PUMPS AND PIPING, BUILDING 420
Final Submittal
Schriever Air Force Base
GLEN 12-1027
15 February 2019
ARCHITECTURE ° ENGINEERING CONSTRUCTION °
REPAIR BY REPLACING DOMESTIC WATER PUMPS AND PIPING, SAFB
SAFB Project Number: GLEN 12-1027
Contract Number: FA7000-16-D-0008
Delivery Order: FA700017F0506
AECOM Project Number: 60582516
Prepared For: Prepared By:
Schriever Air Force Base
AECOM
Mr. Casey Waughtel 2315 Briargate Parkway, Suite 150 SAFB PM, 50 CES/CENMP Colorado Springs, CO. 80920
(719) 567-4687 (719) 531-0001 i
AUTHORIZATION
AECOM Group, Inc. (AECOM) was retained by the Shriever Air Force Base’s 50 CONS/LGCA to complete a Design Analysis Report under Contract No. FA7000-16-D-0008. The project is to provide pump and piping replacement for Building 420 potable water pump station.
PROJECT PERSONNEL
Schriever Air Force Base:
• Contract Administrator Kenneth Helgeson
• 50 CES Project Engineer Andrew Keener
AECOM Group:
• Project Manager Frank Tyboroski, P.E.
• Professional in Charge (PIC) Nathan Walker, P.E.
• Process/ Mechanical Lead Nathan Walker, P.E.
• Instrumentation and Controls/ Electrical Lead Kevin Sparrow, P.E.
• Fire Protection Engineer Jennifer Walker, PE
• CAD Design Jim Healy
• Independent Technical Review
Scott Cole, P.E.
Engineer of Record Electrical Engineer Fire Protection Engineer
TABLE OF CONTENTS
ii
SUMMARY:
SITE LOCATION:
1. CRITERIA:
4. ANALYSIS BY DISCIPLINE:
4.1. PROCESS/ MECHANICAL ENGINEERING:
4.1.1. EXISTING SYSTEM ASSESSMENT:
4.1.2. IDENTIFIED IMPROVEMENTS:
4.1.3. CALCULATIONS
4.1.4. PRODUCT LITERATURE:
4.2. ELECTRICAL ENGINEERING:
4.2.1. CONFORM TO SAFB LIGHTING DESIGN STANDARDS:
4.2.2. POWER REQUIREMENTS:
TABLE OF CONTENTS
iii
4.2.3. ADEQUACY OF EXISTING POWER SUPPLY:
4.2.4. LIGHTING AND OUTLET LOAD:
4.2.5. GROUNDING:
4.2.6. OUTAGES REQUIRED AND OCCUPANT IMPACTS:
4.2.7. TEMPORARY POWER REQUIREMENTS:
4.2.8. MATERIALS AND METHODS:
4.2.9. LOADS FOR SPECIAL EQUIPMENT:
4.2.10. STATEMENT OF STANDARDS SUCH AS VOLTAGE DROP, LIGHTING:
4.2.11. ELECTRONICS SYSTEMS:
4.2.12. CORROSION CONTROL/CATHODIC PROTECTION:
4.2.13. MAINTAINABiLITY OF SYSTEMS AND EQUIPMENT:
4.2.14. FAULT CALCULATIONS:
4.2.15. LIGHTNING PROTECTION:
4.2.16. POWER QUALITY:
4.2.17. LEED CREDITS THAT ARE TO BE ACHIEVED:
4.2.18. COORDINATION WITH OTHER DISCIPLINES:
4.3. FIRE PROTECTION ENGINEERING:
4.3.1. CONFORM TO NFPA 20 and UFC:
4.4. ENVIRONMENTAL ENGINEERING:
4.4.1. LEAD-BASED PAINT SURVEY AND ANALYSIS:
4.4.2. ASBESTOS SURVEY AND ANALYSIS:
5. SPECIFICATIONS
APPENDIX D - CALCULATIONS ............................................................................................................ D
APPENDIX E – PRODUCT CUT SHEETS ................................................................................................ E
APPENDIX G – SPECIFICATIONS .......................................................................................................... G
SUMMARY
SITE LOCATION:
Building 420 is located as indicated in Figure 1.
Figure 1, Site Location Aerial Photo
SECTIONONE Criteria
1. CRITERIA:
The following codes were used to generate the design criteria, construction drawings, and the specifications used for this project:
Structural Design, Drawings, & Design Analysis Report:
• Unified Facilities Criteria (UFC):
o 1-200-01 DoD Building Code (General Building Requirements) o 3-201-01 Civil Engineering o 3-230-01 Water Storage, Distribution and Transmission o 3-230-02 Operation and Maintenance Water Systems o 3-430-09 Exterior Mechanical Utility Distribution o 3-501-01 Electrical Engineering o 3-530-01 Interior and Exterior Lighting Systems and Controls o 3-550-01 Exterior Electrical Power Distribution o 3-600-01 Fire Protection Engineering for Facilities, 8 August 2016, Change 2, 25
March 2018
• The Schriever AFB Engineering Design Guide, revised March, 2016.
• The Schriever AFB Facility Excellence Plan (FEP), dated February, 2010.
• International Building Code (IBC) latest edition and modifications as provided in UFC 1- 200-01, Design: General Building Requirements (www.wbdg.org/ccb/DOD/ufc_1_200_01.pdf)
• Pikes Peak Regional Building Code, 2011 Edition
• ASCE 7-10
• The 2015 edition of the International Mechanical Code (IMC) (as adopted by the Colorado State Buildings Program as follows: Chapters 2-15 and Appendix A)
• The 2015 edition of the International Energy Conservation Code (IECC) (as adopted by the Colorado State Buildings Program)
• The 2017 edition of the National Electrical Code (NEC) (National Fire Protection Association Standard 70) (as adopted by the Colorado State Electrical Board)
• The 2015 edition of the International Plumbing Code (IPC) (as adopted by the Colorado Examining Board of Plumbers as follows: Chapter 1 Section 101.2,102, 105, 107, Chapters 2-13 and Appendices B, D, E, F and G)
• The National Fire Protection Association Standards (NFPA) (as adopted by the Department of Public Safety/Division of Fire Prevention and Control as follows with editions shown in parentheses:
NFPA-1 (2006), 11 (2005), 12 (2005), 12A (2004), 13 (2002), 13D (2002), 13R (2002), 14 (2003), 15 (2001), 16 (2003), 17 (2002), 17A (2002), 20 (2003), 22 (2003), 24 (2002), 25 (2002), 72 (2002), 409 (2004), 423 (2004), 750 (2003) and 2001 (2004))
• NFPA 101 Life Safety Code (Latest Edition)
• American Water Works Association (AWWA) – all applicable standards
SECTIONONE Criteria
This page intentionally left blank.
SECTIONFOUR Analysis by Discipline
4. ANALYSIS BY DISCIPLINE:
4.1. PROCESS/ MECHANICAL ENGINEERING:
4.1.1. EXISTING SYSTEM ASSESSMENT:
Building 420 houses the domestic water pump system for SAFB. This facility is located inside the Restricted Area (RA).
There are currently two American Marsh domestic water pumps in service in Building 420. These pumps run on variable frequency drives (VFD), and are rated for 1,500 gpm at 90 psi. They are powered by 125 horsepower (HP) electric motors.
There is room for one additional domestic water supply standby pump which can be added for redundancy. The pumps are set at a pre-set pressure of approximately 84 psi. These domestic water pumps are oversized for the wide range of flows at SAFB.
Night time flows are below 100 gpm. Even with the VFD’s, these low flows operate substantially outside the recommended range for these pumps.
There are also three fire pumps housed in Building 420. Two of the fire pumps are 125 HP electric fire pumps, each rated for 1,000 gpm at 125 psi. The third fire pump is a 2012 diesel driven single stage fire pump rated for 1,500 gpm at 125 psi. The third diesel fire pump provides approximately 24 hours of backup water at full engine power. Table 1 summarizes the existing pump system.
4.1.2. IDENTIFIED IMPROVEMENTS:
Instead of having two large domestic pumps, a combination of small and medium domestic pumps operating on VFDs would cover a wider flow range. During normal operation, one to three pumps would cover a range of flow between about 100 gpm and 600 gpm. The MDD plus fire flow demand would be met with three medium pumps running in parallel. To provide a reliable water supply, a fourth identical medium pump can be installed as a standby pump or the existing diesel fire pump could be kept as a backup for firm capacity. Since the diesel fire pump is new as of 2012, this pump could remain in service as is. Table 1 lists the major pump and VFD equipment. The fourth Medium Pump is in included in the design since it was listed in the statement of work, but this pump is not required for firm capacity if the existing diesel fire pump remains in service.
The proposed pump configuration would provide SAFB more operational flexibility, and the pumps would operate at much higher efficiencies than the existing pumping equipment.
Additionally, all steel piping infrastructure in and around Building 420 requires replacement, with pipes resized for the flows from the new pumps, and equipped with new valves and fittings to provide simplicity of maintenance and repairs.
Table 1: Major Equipment List
Equipment Description Equipment ID Equipment Purpose
(2) Small Pumps with VFDs SP-1, SP-2 Covers ADD flow condition
(1) Running, (1) Standby
(4) Medium Pumps with VFDs MP-1, MP-2, MP-3, MP-4 Cover MDD, PHD, and MDD+FF conditions
(1-3) Running, (1) Standby
(1) Jockey Pump FP-4 Low flow conditions
(1) Running
(2) Existing Circulation Pumps P-WS4, P-WS3 Tank Water Recirculation
(1) Existing Diesel Fire Pump FP-WS3 Fire Flow backup
4.1.3. CALCULATIONS
HYDRAULIC ANALYSIS:
The water distribution system must be able to supply water demands with sufficient service pressure and water quality over a range of fluctuating conditions that vary throughout the day and over the course of a year. AECOM created a hydraulic model using AFT Fathom software to verify and complete the final hydraulics. This included calculating the required head and pump turndown for each of the three pump types (Medium Pump, Small Pump, and Jockey Pump) at the required flow conditions, taking into account the frictional losses in the pipe system due to the recommended change in pipe sizes within the building. AECOM targeted a distribution pressure of 84 psi for normal water flow and 110 psi for fire flow.
Per the report “Potable Water System Analysis and Modeling, URS 2016”, the required flow demands for the SAFB potable water supply pumps are as follows:
Table 2: Demand Conditions
Demand Condition Total Demand (gpm)
Nightly flows < 40 gpm
Average Daily Demand (ADD) 156 gpm
Maximum Day Demand (MDD) 381 gpm
Peak Hour Demand (PHD) 225 gpm
Fire Flow Demand 1,500 gpm
Firm Pumping Capacity Required (MDD + Fire Flow)
1881 gpm
Where the terms used are defined as follows:
• Average Day Demand (ADD) is the total water usage over the course of the year divided by the total number of days in the year.
• Maximum Day Demand (MDD) is the maximum volume of water used in a single day during the year. For SAFB, this likely occurs on a day in the month of July.
• Peak Hour Demand (PHD) is the maximum volume of water used in any one hour throughout the year.
Based on these flow requirements, the following operating points were determined.
Table 3: Medium Pump Operating Points
Medium Pump Flow (gpm) Head (ft) Design Point 381 198 Min Flow 200 197 Max Flow 750 261
Minimum turndown (% of full speed) 83.2% NPSHR (ft) < 21.7
Table 4: Small Pump Operating Points
Small Pump Flow (gpm) Head (ft) Design Point 156 198 Min Flow 40 197 Max Flow 200 198
Minimum turndown (% of full speed) 94.8% NPSHR (ft) < 22.0
Table 5: Jockey Pump Operating Points
Jockey Pump Flow (gpm) Head (ft) Design Point 40 197.9 NPSHR (ft) < 22.3
The figure below shows the representative pump curves for the various operating points running at full speed and reduced speed, calculated using affinity laws. Actual pump curves will depend on the final pumps selected.
Figure 1: Representative Pump Curves
MATERIAL SELECTION:
Piping material is selected to be AWWA C200 steel pipe. Piping 4” and greater will be cement-mortar-lined per AWWA C205 with lining thickness as specified in the table below.
Table 6: Cement-mortar-lining thickness per AWWA C205
Nominal Pipe Size (in.) Lining Thickness (in.) Tolerance (in.)
4-10 1/2 -1/16, +1/8
11-23 5/16 -1/16, +1/8
Piping less than 4” will be galvanized steel. AECOM calculated the required minimum wall thickness of the pipe by pipe size per AWWA M11 guidelines (see Appendix D for calculation results). If the calculated required wall thickness is less than industry standards, than the minimum wall thickness per typical vendor standards may be used.
For external protection of underground pipe outside of Building 420, both tape wrap coating (in accordance with AWWA standard C214) or epoxy coating (in accordance with AWWA standard C210, C213, C215, C218 or C222) are acceptable. Indoor pipe shall be painted per industry standards.
NPSHA CONSIDERATIONS:
The potable water storage for diurnal equalization, fire flows, and emergency supply is provided by two tanks (Tk-1 and Tk-2). The two tanks are identical and located adjacent to the booster pumping station in Building 420. These identical, below grade, concrete, square storage tanks are located northwest of Building 420. Per Potable Water System Analysis and Modeling, URS 2016, the maximum water level is 23 feet and the normal minimum water level in the tanks is 18 feet. The water level in the tanks is controlled by level sensors. For conservatism, the NPSHA calculation of the pumps within AFT Fathom assumes that the tanks will need to be pumped all of the way down in the event of a fire, and that no tank level will be available.
LINE SIZING ANALYSIS:
A line sizing calculation was performed to determine the appropriate line sizes for the pump station’s new pumps. See Appendix D for calculation results.
COMBINATION AIR/ VACUUM VALVE SIZING ANALYSIS:
A Combination Air/ Vacuum Valve (CAV) is required on the discharge side of each of the pumps to protect against vacuum conditions from occurring during potential pump trips, as well as to release air from typical pump filling and draining operations. A CAV will also be installed at the highpoint of the piping to automatically release entrained air. CAVs are placed at high points to exhaust large volumes of air during pump start-up and pipeline filling. These valves will also admit large volumes of air into the pipeline to protect against internal vacuum conditions during pipeline draining and other conditions. CAVs combine the function of both air/vacuum and air release valves. CAV valves were sized per AWWA M51. A 2-inch CAV with a 1/16-inch orifice is required for the FP-3 fire flows, and a 1.5-inch CAV with a 1/16-inch orifice is required for the medium pumps.
PRESSURE RELEIF VALVE (PRV) CALCULATION:
The maximum recommended discharge pressure from Building 420 is 110 psi to prevent exceeding the pressure rating of Schedule 40 PVC pipe that is present within the system. The distribution system mainly consists of PVC Schedule 40 pipes with sizes that range from 6-inch to 12-inch. The pressure rating of the 12-inch Schedule 40 PVC pipe is 130 psi at 73 deg F. Since the pressure rating of the pipe increases as the pipe diameter decreases, pipe sizes smaller than 12-inch in diameter will have a pressure rating higher than 130 psi. The selected pumps will likely have a dead head pressure of greater than 130 psig (per preliminary vendor pump curves), therefore a PRV will be installed on the distribution water header to protect from over-pressuring the downstream piping. The PCV-01 and PCV-02 will also serve this function, however overpressure analysis requires that these are assumed to fail. A preliminary PSV sizing calculation in accordance with API 520/521 has determined that PRV with a 2.5 sq in area orifice is required, however the PRV size will need to be confirmed by the manufacturer to certify the valve capacity. Pump Control Valve
(PCV) PCV-01 and PCV-02 are recommended to be set at 115 psig. The recommended PRV set pressure is 120 psig.
4.1.4. PRODUCT LITERATURE:
Several pump vendors were contacted to assist with pump selection. Preliminary vendor provided pump cut sheets are provided in Appendix E.
4.2. ELECTRICAL ENGINEERING:
4.2.1. CONFORM TO SAFB LIGHTING DESIGN STANDARDS:
No lighting changes are within the scope of this project.
4.2.2. POWER REQUIREMENTS:
The power requirements for the proposed pump replacements are a net reduction of 75 horsepower. All building loads besides pump motors are to remain. Therefore, the total change in connected load is a reduction of approximately 70 kVA.
4.2.3. ADEQUACY OF EXISTING POWER SUPPLY:
The power supply and power distribution equipment are assumed, at this time, to be adequate for the replacement of pumps. Assuming that the existing equipment is adequately sized for the existing loads, the reduction in loads will be within the existing equipment capacity.
4.2.4. LIGHTING AND OUTLET LOAD:
No new lighting and outlet load is within the scope of this project.
4.2.5. GROUNDING:
New equipment grounding will be established at each new motor controller that is exterior to Motor Control Centers (MCCs). New equipment installed inside of MCCs will be connected to internal MCC grounding bus.
4.2.6. OUTAGES REQUIRED AND OCCUPANT IMPACTS:
The electrical work will require some downtime to change over from existing pumping to new pumping. The phasing described above in Section 2.3 will minimize the duration of outages, but will increase the number of outages.
4.2.7. TEMPORARY POWER REQUIREMENTS:
Temporary power is not anticipated to be required for this effort.
4.2.8. MATERIALS AND METHODS:
All work performed under this project will be covered under the standard specification, Section 26 00 00.00 20 Basic Electrical Materials and Methods.
4.2.9. LOADS FOR SPECIAL EQUIPMENT:
No special equipment is associated with this project.
4.2.10. STATEMENT OF STANDARDS SUCH AS VOLTAGE DROP, LIGHTING:
All electrical design will meet the requirements of the NEC or the local Authority Having Jurisdiction. There are no unique impacts associated with the electrical work not covered by the previously mentioned Code or local modifications to that Code.
4.2.11. ELECTRONICS SYSTEMS:
Control wiring information between the new pump VFDs and the ATCC panel is provided for the Base’s use in integrating the VFDs into the ATCC system.
Integration by the Base to consist of confirmation, and addition, if necessary, of available I/O counts and types required for the VFDs and any programming changes required to the ATCC system to perform the pump controls as described in the pump control sequence in the drawings.
4.2.12. CORROSION CONTROL/CATHODIC PROTECTION:
Cathodic protection is included for buried steel pipe outside of Building 420. The system uses three 9 lb high potential magnesium sacrificial anodes, two north of the building and one to the south. Each side of the building includes a common cathodic test station for the buried steel pipe exiting that side of the building.
4.2.13. MAINTAINABILITY OF SYSTEMS AND EQUIPMENT:
The new VFDs will have lockable disconnects (feeder breakers) at the power distribution equipment and lockable local disconnects on the VFD enclosure to provide isolation for maintenance. Furthermore, the control circuits will be isolated from the power circuits within the VFD to provide a safer working environment for controls commissioning, testing, and maintenance.
4.2.14. FAULT CALCULATIONS:
MCC work for this project will be new feeder breaker units (buckets) or new motor control units (units) within existing MCC sections. No new distribution equipment is being added; therefore, fault calculations are not applicable to this project.
4.2.15. LIGHTNING PROTECTION:
Not Applicable.
4.2.16. POWER QUALITY:
The VFDs to be provided for motor control will be low-harmonic drives, either via 18-pulse transformer or active-front-end technology.
4.2.17. LEED CREDITS THAT ARE TO BE ACHIEVED:
Not Applicable.
4.2.18. COORDINATION WITH OTHER DISCIPLINES:
Electrical connections to piping and pumping equipment will be coordinated with Process Mechanical. If applicable, seismic requirements will be coordinated with Structural. No other coordination is anticipated at this time.
4.3. FIRE PROTECTION ENGINEERING:
4.3.1. CONFORM TO NFPA 20 AND UFC:
NFPA 20 Standard for Installation of Stationary Pumps for Fire Protection is not applicable to the domestic pumps in Building 420. In accordance with explanatory material contained in NFPA 20 Article A.4.7.1, the domestic pumps in this pump station are not classified as fire pumps. Furthermore, not being classified as fire pumps, the article states that domestic pumps are not expected to meet the requirements of the NFPA 20 standard regarding fire pumps.
The existing fire pump is not being modified and is outside the scope of this project.
As such UFC 3-600-01 does not apply to this project and it does not require review by a fire protection engineer.
4.4. ENVIRONMENTAL ENGINEERING:
4.4.1. LEAD-BASED PAINT SURVEY AND ANALYSIS:
Not included in scope, to be completed by the contractor.
4.4.2. ASBESTOS SURVEY AND ANALYSIS:
Not included in scope, to be completed by the contractor.
SECTIONFIVE Specifications
5. SPECIFICATIONS
The unedited UFGS specifications that AECOM anticipates including in the final design package are attached in Appendix G as well as listed below in Table 7. Future submittals will include the edited version of these specifications specific to the project. Note that the closest specification for the pumps and pump motors was vertical turbine pumps and vertical turbine motors, respectively. These specifications are placeholders until it is determined if there is a replacement specification, or the specification needs to be modified. AECOM will provide these specifications in UFGS format, as both Word and PDF files to SAFB.
Table 7: Specification List
UFGS Specification Number Specification Title
00 01 15 List of Drawings
00 22 13.00 20 Supplementary Instructions to Offerers
01 11 00 Summary of Work
01 14 00 Work Restrictions
01 20 00.00 20 Price and Payment Procedures
01 30 00 Administrative Requirements
01 32 01.00 10 Project Schedule
01 33 00 Submittal Procedures
01 35 26 Governmental Safety Requirements
01 42 00 Sources for Reference Publications
01 45 00.00 10 Quality Control
01 45 35 Special Inspections
01 50 00 Temporary Construction Facilities and Controls
01 57 19 Temporary Environmental Controls
01 58 00 Project Identification
01 74 19 Construction and Demolition Waste Management
01 78 00 Closeout Submittals
01 78 23 Operation and Maintenance Data
01 91 00.15 Total Building Commissioning
02 41 00 Demolition and Deconstruction
03 11 13.00 10 Structural Cast-In-Place Concrete Forming
03 15 00.00 10 Concrete Accessories
03 20 00.00 10 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
SECTIONFIVE Specifications
UFGS Specification Number Specification Title
03 30 53 Miscellaneous Cast-In-Place Concrete
03 35 00.00 10 Concrete Finishing
03 39 00.00 10 Concrete Curing
09 06 00 Schedules for Finishes
09 97 13.00 40 Steel Coatings
26 00 00.00 20 Basic Electrical Materials and Methods
26 05 00.00 40 Common Work Results for Electrical
26 05 19.10 10 Insulated Wire and Cable
26 05 71.00 40 Low Voltage Overcurrent Protective Devices
26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type
26 29 23 Variable Frequency Drive Systems Under 600 Volts
26 42 14.00 10 Cathodic Protection System (Sacrificial Anode)
31 00 00 Earthwork
31 11 00 Clearing and Grubbing
32 92 19 Seeding
32 92 23 Sodding
33 11 00 Water Utility Distribution Piping
33 12 34 Magnetic Flowmeters
33 33 00 Horizontal Centrifugal Pumps
40 05 13 Pipelines, Liquid Process Piping
40 95 00 Process Control
SECTIONSIX Construction Cost Estimate
SECTIONSEVEN Limitations
APPENDICES
D
APPENDIX D - CALCULATIONS
Filling Rate 1500 gpm Differential Pressure 2 psi Air flow 228 SCFM Large Orifice Size 2 inches
Draining Rate 1500 gpm Air flow 201 SCFM Large Orifice Size 2 inches
Percent Entrained Air 2% Flow 1500 gpm Entrained Air 30 gpm Entrained Air 4.0 SCFM Design Pressure 110 psi Small Orifice Size 1/16 inches
Pipe Filling
Pipe Draining
Air Release
Shriever Air Force Base Potable Water Project
CAV Sizing Calculation
Fathom 8 (Model) 9/25/2018 rebekah.adams
AFT Fathom Model
General
Title: AFT Fathom Model
Input File: M:\DCS\Projects\BDL\60582516_B420_Pump\400_Technical\432_Process\Hydraulics - Fathom Models\SAFB Model 9-24-18 v5.fth
Scenario: Base Scenario/MP Max Flow
Number Of Pipes= 28
Number Of Junctions= 23
Pressure/Head Tolerance= 0.0001 relative change
Flow Rate Tolerance= 0.0001 relative change
Temperature Tolerance= 0.0001 relative change Flow Relaxation= (Automatic)
Pressure Relaxation= (Automatic)
Constant Fluid Property Model
Fluid Database: AFT Standard
Fluid: Water at 1 atm Max Fluid Temperature Data= 212 deg. F
Min Fluid Temperature Data= 32 deg. F
Temperature= 77 deg. F Density= 62.2513 lbm/ft3
Viscosity= 2.14623 lbm/hr-ft
Vapor Pressure= 0.46108 psia
Viscosity Model= Newtonian Apply laminar and non-Newtonian correction to: Pipe Fittings & Losses, Junction K factors, Junction Special Losses, Junction Polynomials
Corrections applied to the following junctions: Branch, Reservoir, Assigned Flow, Assigned Pressure, Area Change, Bend, Tee or Wye, Control Valve, Spray Discharge, Relief Valve
Ambient Pressure (constant)= 1 atm
Gravitational Acceleration= 1 g
Turbulent Flow Above Reynolds Number= 4000
Laminar Flow Below Reynolds Number= 2300
Pipes rebekah.adams
AFT Fathom Model
Pipe Name Pipe Defined
Length Length Units
Hydraulic Diameter
Hydraulic Diam. Units
Friction Data Set
Roughness Roughness Units
1 Pipe Yes 69.33 feet 12 inches Standard 0.0018 inches
2 Pipe Yes 20 feet 7.981 inches Standard 0.0018 inches
3 Pipe Yes 12 feet 12 inches Standard 0.0018 inches
4 Pipe Yes 5 feet 7.981 inches Standard 0.0018 inches
5 Pipe Yes 4 feet 12 inches Standard 0.0018 inches
6 Pipe Yes 5 feet 7.981 inches Standard 0.0018 inches
7 Pipe Yes 47.66 feet 12 inches Standard 0.0018 inches
8 Pipe Yes 3.33 feet 2.067 inches Standard 0.0018 inches
9 Pipe Yes 16 feet 12 inches Standard 0.0018 inches
10 Pipe Yes 5 feet 6.065 inches Standard 0.0018 inches
11 Pipe Yes 9.75 feet 12 inches Standard 0.0018 inches
12 Pipe Yes 5 feet 6.065 inches Standard 0.0018 inches
Pipe Name Pipe Defined
Length Length Units
Hydraulic Diameter
Hydraulic Diam. Units
Friction Data Set
Roughness Roughness Units
13 Pipe Yes 9.5 feet 12 inches Standard 0.0018 inches
14 Pipe Yes 5 feet 12 inches Standard 0.0018 inches
15 Pipe Yes 5 feet 6.065 inches Standard 0.0018 inches
16 Pipe Yes 5 feet 6.065 inches Standard 0.0018 inches
17 Pipe Yes 5 feet 6.065 inches Standard 0.0018 inches
18 Pipe Yes 5 feet 4.026 inches Standard 0.0018 inches
19 Pipe Yes 5 feet 4.026 inches Standard 0.0018 inches
20 Pipe Yes 5 feet 4.026 inches Standard 0.0018 inches
21 Pipe Yes 5 feet 10.02 inches Standard 0.0018 inches
22 Pipe Yes 10.75 feet 10.02 inches Standard 0.0018 inches
23 Pipe Yes 3.5 feet 12 inches Standard 0.0018 inches
24 Pipe Yes 17 feet 6.065 inches Standard 0.0018 inches
25 Pipe Yes 10.5 feet 12 inches Standard 0.0018 inches
26 Pipe Yes 24.75 feet 12 inches Standard 0.0018 inches
27 Pipe Yes 11.75 feet 10.02 inches Standard 0.0018 inches
28 Pipe Yes 14 feet 10.02 inches Standard 0.0018 inches rebekah.adams
AFT Fathom Model
Pipe Losses (K) Initial Flow Initial Flow Units
Junctions (Up,Down)
Geometry Material Size
1 1.423 1, 11 Cylindrical Pipe Steel - ANSI 12 inch
2 2.120219 11, 2 Cylindrical Pipe Steel - ANSI 8 inch
3 0.182 11, 12 Cylindrical Pipe Steel - ANSI 12 inch
4 2.120219 12, 3 Cylindrical Pipe Steel - ANSI 8 inch
5 0.182 12, 13 Cylindrical Pipe Steel - ANSI 12 inch
6 2.120219 13, 4 Cylindrical Pipe Steel - ANSI 8 inch
7 0.364 13, 14 Cylindrical Pipe Steel - ANSI 12 inch
8 2.15907 14, 5 Cylindrical Pipe Steel - ANSI 2 inch
9 0 14, 15 Cylindrical Pipe Steel - ANSI 12 inch
10 2.127882 15, 6 Cylindrical Pipe Steel - ANSI 6 inch
11 0 15, 16 Cylindrical Pipe Steel - ANSI 12 inch
12 2.127882 16, 7 Cylindrical Pipe Steel - ANSI 6 inch
Pipe Losses (K) Initial Flow Initial Flow Units
Junctions (Up,Down)
Geometry Material Size
13 0.2576847 16, 23 Cylindrical Pipe Steel - ANSI 12 inch
14 2.112143 23, 8 Cylindrical Pipe Steel - ANSI 12 inch
15 2.637536 2, 17 Cylindrical Pipe Steel - ANSI 6 inch
16 2.637536 3, 18 Cylindrical Pipe Steel - ANSI 6 inch
17 2.637536 4, 19 Cylindrical Pipe Steel - ANSI 6 inch
18 2.753913 5, 10 Cylindrical Pipe Steel - ANSI 4 inch
19 2.753913 6, 20 Cylindrical Pipe Steel - ANSI 4 inch
20 2.753913 7, 21 Cylindrical Pipe Steel - ANSI 4 inch
21 2.580841 8, 22 Cylindrical Pipe Steel - ANSI 10 inch
22 0.2773084 22, 21 Cylindrical Pipe Steel - ANSI 10 inch
23 0 10, 9 Cylindrical Pipe Steel - ANSI 12 inch
24 0.209545 17, 18 Cylindrical Pipe Steel - ANSI 6 inch
25 0.182 18, 19 Cylindrical Pipe Steel - ANSI 12 inch
26 0.182 19, 10 Cylindrical Pipe Steel - ANSI 12 inch
27 0.19586 21, 20 Cylindrical Pipe Steel - ANSI 10 inch
28 0.19586 20, 10 Cylindrical Pipe Steel - ANSI 10 inch rebekah.adams
AFT Fathom Model
Pipe Type Special Condition
1 STD None
2 STD (schedule 40) Closed
3 STD None
4 STD (schedule 40) Closed
5 STD None
6 STD (schedule 40) None
7 STD Closed
8 STD (schedule 40) Closed
9 STD None
10 STD (schedule 40) Closed
11 STD None
12 STD (schedule 40) Closed
Pipe Type Special Condition
13 STD None
14 STD None
15 STD (schedule 40) None
16 STD (schedule 40) None
17 STD (schedule 40) None
18 STD (schedule 40) None
19 STD (schedule 40) None
20 STD (schedule 40) None
21 STD (schedule 40) None
22 STD (schedule 40) None
23 STD None
24 STD (schedule 40) None
25 STD None
26 STD None
27 STD (schedule 40) None
28 STD (schedule 40) Closed
Pipe Detail Summary
Pipe 1 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD Inner Diameter= 12 inches rebekah.adams
AFT Fathom Model
Length= 69.33 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 1.423
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 2 Valve:
Butterfly, PO=100, K= 0.46, Quantity= 1
Gate, Wedge\Plug, PO=100, K= 0.10, Quantity= 1 Entrance/Exit:
Entrance, Sharp, K= 0.50, Quantity= 1
Pipe 2 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 8 inch STD (schedule 40) Inner Diameter= 7.981 inches
Length= 20 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 2.120219
Valve:
Gate, Wedge\Plug, PO=100, K= 0.11, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 3 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches Length= 12 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.182
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 1
Pipe 4 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 8 inch STD (schedule 40) Inner Diameter= 7.981 inches
Length= 5 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 2.120219
Valve:
Gate, Wedge\Plug, PO=100, K= 0.11, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 5 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches Length= 4 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.182 rebekah.adams
AFT Fathom Model
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 1
Pipe 6 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 8 inch STD (schedule 40)
Inner Diameter= 7.981 inches Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.120219
Valve:
Gate, Wedge\Plug, PO=100, K= 0.11, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1 Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 7 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD Inner Diameter= 12 inches
Length= 47.66 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0.364
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 2
Pipe 8 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 2 inch STD (schedule 40)
Inner Diameter= 2.067 inches
Length= 3.33 feet Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.15907
Valve:
Gate, Wedge\Plug, PO=100, K= 0.15, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1 Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 9 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD Inner Diameter= 12 inches
Length= 16 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0
Pipe 10 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 6 inch STD (schedule 40) Inner Diameter= 6.065 inches
Length= 5 feet
Absolute Roughness= 0.0018 inches rebekah.adams
AFT Fathom Model
Fittings & Losses= 2.127882
Valve:
Gate, Wedge\Plug, PO=100, K= 0.12, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1 Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 11 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD Inner Diameter= 12 inches
Length= 9.75 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0
Pipe 12 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 6 inch STD (schedule 40)
Inner Diameter= 6.065 inches Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.127882 Valve:
Gate, Wedge\Plug, PO=100, K= 0.12, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 13 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches
Length= 9.5 feet Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.2576847
Elbow/Bend:
Smooth Flanged, r/D=1.5, 45 deg., K= 0.13, Quantity= 2
Pipe 14 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.112143 Valve:
Gate, Wedge\Plug, PO=100, K= 0.10, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Contraction to Smaller Area, K= 0.91, Quantity= 1
Pipe 15 Detailed Input Data
Name: Pipe rebekah.adams
AFT Fathom Model
Geometry: Cylindrical Pipe
Material: Steel - ANSI 6 inch STD (schedule 40) Inner Diameter= 6.065 inches
Length= 5 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 2.637536
Valve:
Gate, Wedge\Plug, PO=100, K= 0.12, Quantity= 1 Check Valve:
Swing, 90 deg. seat, K= 0.75, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1 Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 16 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe Material: Steel - ANSI 6 inch STD (schedule 40)
Inner Diameter= 6.065 inches
Length= 5 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 2.637536
Valve:
Gate, Wedge\Plug, PO=100, K= 0.12, Quantity= 1 Check Valve:
Swing, 90 deg. seat, K= 0.75, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 17 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe Material: Steel - ANSI 6 inch STD (schedule 40)
Inner Diameter= 6.065 inches
Length= 5 feet Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.637536
Valve:
Gate, Wedge\Plug, PO=100, K= 0.12, Quantity= 1
Check Valve:
Swing, 90 deg. seat, K= 0.75, Quantity= 1 Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 18 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 4 inch STD (schedule 40)
Inner Diameter= 4.026 inches Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.753913 Valve:
Gate, Wedge\Plug, PO=100, K= 0.14, Quantity= 1
Check Valve:
rebekah.adams
AFT Fathom Model
Swing, 90 deg. seat, K= 0.85, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 19 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 4 inch STD (schedule 40)
Inner Diameter= 4.026 inches
Length= 5 feet Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.753913
Valve:
Gate, Wedge\Plug, PO=100, K= 0.14, Quantity= 1
Check Valve:
Swing, 90 deg. seat, K= 0.85, Quantity= 1 Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 20 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 4 inch STD (schedule 40)
Inner Diameter= 4.026 inches Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.753913 Valve:
Gate, Wedge\Plug, PO=100, K= 0.14, Quantity= 1
Check Valve:
Swing, 90 deg. seat, K= 0.85, Quantity= 1 Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1
Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 21 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 10 inch STD (schedule 40) Inner Diameter= 10.02 inches
Length= 5 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 2.580841 Valve:
Gate, Wedge\Plug, PO=100, K= 0.11, Quantity= 1
Check Valve:
Swing, 90 deg. seat, K= 0.70, Quantity= 1
Other:
Tee, Branch flow (dead run), K= 1.10, Quantity= 1 Area Change:
Expansion to Pipe Area, K= 0.67, Quantity= 1
Pipe 22 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe rebekah.adams
AFT Fathom Model
Material: Steel - ANSI 10 inch STD (schedule 40)
Inner Diameter= 10.02 inches Length= 10.75 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.2773084 Elbow/Bend:
Smooth Flanged, r/D=1.5, 45 deg., K= 0.14, Quantity= 2
Pipe 23 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD Inner Diameter= 12 inches
Length= 3.5 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0
Pipe 24 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 6 inch STD (schedule 40)
Inner Diameter= 6.065 inches Length= 17 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.209545 Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.21, Quantity= 1
Pipe 25 Detailed Input Data
Name: Pipe
Geometry: Cylindrical Pipe Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches
Length= 10.5 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0.182
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 1
Pipe 26 Detailed Input Data
Name: Pipe Geometry: Cylindrical Pipe
Material: Steel - ANSI 12 inch STD
Inner Diameter= 12 inches Length= 24.75 feet
Absolute Roughness= 0.0018 inches
Fittings & Losses= 0.182
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.18, Quantity= 1
Pipe 27 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 10 inch STD (schedule 40) Inner Diameter= 10.02 inches
Length= 11.75 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0.19586
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.20, Quantity= 1 rebekah.adams
AFT Fathom Model
Pipe 28 Detailed Input Data Name: Pipe
Geometry: Cylindrical Pipe
Material: Steel - ANSI 10 inch STD (schedule 40) Inner Diameter= 10.02 inches
Length= 14 feet
Absolute Roughness= 0.0018 inches Fittings & Losses= 0.19586
Elbow/Bend:
Smooth Flanged, r/D=1.5, 90 deg., K= 0.20, Quantity= 1
Assigned Pressure Table
Assigned Pressure Name Object Defined
Inlet Elevation
Elevation Units
Initial Pressure
9 Assigned Pressure Yes 2.666 feet 84.00
Assigned Pressure Initial Pressure Units
Database Source
Pressure Pressure Units
Pressure Type
Balance Energy
9 psig 84 psig Stagnation No
Assigned Pressure Balance Concentration
(Pipe #1) K In, K Out
(Pipe #2) K In, K Out
(Pipe #3) K In, K Out
(Pipe #4) K In, K Out
(Pipe #5) K In, K Out
9 No (P23) 0, 0
Assigned Pressure (Pipe #6) K In, K Out
(Pipe #7) K In, K Out
(Pipe #8) K In, K Out
(Pipe #9) K In, K Out
(Pipe #10) K In, K Out
(Pipe #11) K In, K Out
Assigned Pressure (Pipe #12) K In, K Out
(Pipe #13) K In, K Out
(Pipe #14) K In, K Out
(Pipe #15) K In, K Out
(Pipe #16) K In, K Out
(Pipe #17) K In, K Out
Assigned Pressure (Pipe #18) K In, K Out
(Pipe #19) K In, K Out
(Pipe #20) K In, K Out
(Pipe #21) K In, K Out
(Pipe #22) K In, K Out
(Pipe #23) K In, K Out
Assigned Pressure (Pipe #24) K In, K Out
(Pipe #25) K In, K Out
Branch Table
Branch Name Object Defined
Inlet Elevation
Elevation Units
Initial Pressure Initial Pressure Units
Database Source
10 Branch Yes 2.666 feet
11 Branch Yes 0 feet
12 Branch Yes 0 feet rebekah.adams
AFT Fathom Model
Branch Name Object Defined
Inlet Elevation
Elevation Units
Initial Pressure Initial Pressure Units
Database Source
13 Branch Yes 0 feet
14 Branch Yes 0 feet
15 Branch Yes 0 feet
16 Branch Yes 0 feet
17 Branch Yes 2.666 feet
18 Branch Yes 2.666 feet
19 Branch Yes 2.666 feet
20 Branch Yes 2.666 feet
21 Branch Yes 2.666 feet
22 Branch Yes 2.666 feet
23 Branch Yes 0 feet
Branch Special Condition
Boundary Flow (+ = in/- = out)
Boundary Flow Units
(Pipe #1) K In, K Out
(Pipe #2) K In, K Out
(Pipe #3) K In, K Out
10 None (P18) 0, 0 (P23) 0, 0 (P26) 0, 0
11 None (P1) 0, 0 (P2) 0, 0 (P3) 0, 0
12 None (P3) 0, 0 (P4) 0, 0 (P5) 0, 0
Branch Special Condition
Boundary Flow (+ = in/- = out)
Boundary Flow Units
(Pipe #1) K In, K Out
(Pipe #2) K In, K Out
(Pipe #3) K In, K Out
13 None (P5) 0, 0 (P6) 0, 0 (P7) 0, 0
14 None (P7) 0, 0 (P8) 0, 0 (P9) 0, 0
15 None (P9) 0, 0 (P10) 0, 0 (P11) 0, 0
16 None (P11) 0, 0 (P12) 0, 0 (P13) 0, 0
17 None (P15) 0, 0 (P24) 0, 0
18 None (P16) 0, 0 (P24) 0, 0 (P25) 0, 0
19 None (P17) 0, 0 (P25) 0, 0 (P26) 0, 0
20 None (P19) 0, 0 (P27) 0, 0 (P28) 0, 0
21 None (P20) 0, 0 (P22) 0, 0 (P27) 0, 0
22 None (P21) 0, 0 (P22) 0, 0
23 None (P13) 0, 0 (P14) 0, 0
Branch (Pipe #4) K In, K Out
(Pipe #5) K In, K Out
(Pipe #6) K In, K Out
(Pipe #7) K In, K Out
(Pipe #8) K In, K Out
(Pipe #9) K In, K Out
(Pipe #10) K In, K Out
10 (P28) 0, 0 rebekah.adams
AFT Fathom Model
Branch (Pipe #4) K In, K Out
(Pipe #5) K In, K Out
(Pipe #6) K In, K Out
(Pipe #7) K In, K Out
(Pipe #8) K In, K Out
(Pipe #9) K In, K Out
(Pipe #10) K In, K Out
Branch (Pipe #11) K In, K Out
(Pipe #12) K In, K Out
(Pipe #13) K In, K Out
(Pipe #14) K In, K Out
(Pipe #15) K In, K Out
(Pipe #16) K In, K Out
(Pipe #17) K In, K Out
Branch (Pipe #11) K In, K Out
(Pipe #12) K In, K Out
(Pipe #13) K In, K Out
(Pipe #14) K In, K Out
(Pipe #15) K In, K Out
(Pipe #16) K In, K Out
(Pipe #17) K In, K Out
Branch (Pipe #18) K In, K Out
(Pipe #19) K In, K Out
(Pipe #20) K In, K Out
(Pipe #21) K In, K Out
(Pipe #22) K In, K Out
(Pipe #23) K In, K Out
(Pipe #24) K In, K Out
(Pipe #25) K In, K Out rebekah.adams
AFT Fathom Model
Branch (Pipe #18) K In, K Out
(Pipe #19) K In, K Out
(Pipe #20) K In, K Out
(Pipe #21) K In, K Out
(Pipe #22) K In, K Out
(Pipe #23) K In, K Out
(Pipe #24) K In, K Out
(Pipe #25) K In, K Out
Pump Table
Pump Name Object Defined
Inlet Elevation
Elevation Units
Initial Pressure Initial Pressure Units
Database Source
2 MP-1 Yes 2.666 feet
3 MP-2 Yes 2.666 feet
4 MP-3 Yes 2.666 feet
5 JP-4 Yes 2.666 feet
6 SP-1 Yes 2.666 feet
7 SP-2 Yes 2.666 feet
8 FP-WS3 Yes 2.666 feet
Pump Special Condition
Pump Type
Design Flow Rate
Design Flow Rate Units
Current Configuration
Independent Variable
2 None Vol. Flow 750 gal/min N/A
3 None Vol. Flow 750 gal/min N/A
4 None Vol. Flow 750 gal/min N/A
5 None Vol. Flow 40 gal/min N/A
6 None Vol. Flow 200 gal/min N/A
7 None Vol. Flow 200 gal/min N/A
8 None Vol. Flow 1500 gal/min N/A rebekah.adams
AFT Fathom Model
Pump Ind. Variable Units
Dependent Variable
Dep. Variable Units
Pump Curve Constant a
Pump Curve Constant b
Pump Curve Constant c
Pump Pump Curve Constant d
Pump Curve Constant e
Runout Flow Rate
Runout Flow Rate Units
Speed Control When Exceeded Only
Pump Heat Added To Fluid
Heat Added Units
2 0 Percent
3 0 Percent
4 0 Percent
5 0 Percent
6 0 Percent
7 0 Percent
8 0 Percent
Reservoir Table
Reservoir Name Object Defined
Inlet Elevation
Elevation Units
Initial Pressure Initial Pressure Units
Database Source
1 Water Tk Yes
Reservoir Liquid Elev. Liquid Elev.
Units Surface
Pressure Surface
Pressure Units Balance Energy
Balance Concentration
1 0 feet 1 atm No No
Reservoir (Pipe #1)
K In, K Out (Pipe #2)
K In, K Out (Pipe #3)
K In, K Out (Pipe #4)
K In, K Out (Pipe #5)
K In, K Out (Pipe #6)
K In, K Out
1 (P1) 0, 0 rebekah.adams
AFT Fathom Model
Reservoir (Pipe #7)
K In, K Out (Pipe #8)
K In, K Out (Pipe #9)
K In, K Out (Pipe #10) K In, K Out
(Pipe #11) K In, K Out
(Pipe #12) K In, K Out
Reservoir (Pipe #13) K In, K Out
(Pipe #14) K In, K Out
(Pipe #15) K In, K Out
(Pipe #16) K In, K Out
(Pipe #17) K In, K Out
(Pipe #18) K In, K Out
Reservoir (Pipe #19) K In, K Out
(Pipe #20) K In, K Out
(Pipe #21) K In, K Out
(Pipe #22) K In, K Out
(Pipe #23) K In, K Out
(Pipe #24) K In, K Out
Reservoir (Pipe #25) K In, K Out
(Pipe #1) Depth
(Pipe #2) Depth
(Pipe #3) Depth
(Pipe #4) Depth
(Pipe #5) Depth
(Pipe #6) Depth
1 (P1) 0
Reservoir (Pipe #7)
Depth (Pipe #8)
Depth (Pipe #9)
Depth (Pipe #10)
Depth (Pipe #11)
Depth (Pipe #12)
Depth (Pipe #13)
Depth
Reservoir (Pipe #14)
Depth (Pipe #15)
Depth (Pipe #16)
Depth (Pipe #17)
Depth (Pipe #18)
Depth (Pipe #19)
Depth (Pipe #20)
Depth
Reservoir (Pipe #21)
Depth (Pipe #22)
Depth (Pipe #23)
Depth (Pipe #24)
Depth (Pipe #25)
Depth Pipe Depth
Units
1 feet
Fathom 8 (Workspace) 9/24/2018 rebekah.adams
AFT Fathom Model
X P28
P27
P26
P25
P24
P23
P22
P21
P20
P19
P18
P17
P16
P15
P14
P13
X P12
P11
X P10
P9
X P8
X P7
P6
P5
X P4
P3
X P2
P1
J1 Water Tk
J2
MP-1
J3
MP-2
J4
MP-3
J5
JP-4
J6
SP-1
J7
SP-2
J8
FP-WS3
J9
J10
J11
J12
J13
J14
J15
J16
J17
J18
J19
J20
J21
J22J23
Fathom 8 (Output) rebekah.adams
AFT Fathom Model
Model Reference Information
General
Title: AFT Fathom Model Analysis run on: 8/28/2018 1:12:48 PM
Application version: AFT Fathom Version 8 (2015.05.20)
Input File: M:\DCS\Projects\BDL\60582516_B420_Pump\400_Technical\432_Process\Hydraulics - Fathom Models\SAFB Model 9-24-18 v5.fth
Scenario: Base Scenario/MP Max Flow
Output File:
Execution Time= 0.50 seconds
Total Number Of Head/Pressure Iterations= 0
Total Number Of Flow Iterations= 2 Total Number Of Temperature Iterations= 0
Number Of Pipes= 28
Number Of Junctions= 23 Matrix Method= Gaussian Elimination
Pressure/Head Tolerance= 0.0001 relative change Flow Rate Tolerance= 0.0001 relative change
Temperature Tolerance= 0.0001 relative change
Flow Relaxation= (Automatic) Pressure Relaxation= (Automatic)
Constant Fluid Property Model
Fluid Database: AFT Standard Fluid: Water at 1 atm
Max Fluid Temperature Data= 212 deg. F
Min Fluid Temperature Data= 32 deg. F Temperature= 77 deg. F
Density= 62.2513 lbm/ft3
Viscosity= 2.14623 lbm/hr-ft Vapor Pressure= 0.46108 psia
Viscosity Model= Newtonian
Apply laminar and non-Newtonian correction to: Pipe Fittings & Losses, Junction K factors, Junction Special Losses, Junction Polynomials
Corrections applied to the following junctions: Branch, Reservoir, Assigned Flow, Assigned Pressure, Area Change, Bend, Tee or Wye, Control Valve, Spray Discharge, Relief Valve
Ambient Pressure (constant)= 1 atm
Gravitational Acceleration= 1 g Turbulent Flow Above Reynolds Number= 4000
Laminar Flow Below Reynolds Number= 2300
Total Inflow= 750.0 gal/min Total Outflow= 750.0 gal/min
Maximum Static Pressure is 99.55 psia at Pipe 17 Inlet
Minimum Static Pressure is 12.94 psia at Pipe 6 Outlet
Warnings
No Warnings
Pump Summary rebekah.adams
AFT Fathom Model
Jct Name Vol.
Flow (gal/min)
Mass Flow (lbm/sec) dP
(psid) dH
(feet)
Overall Efficiency (Percent)
Speed
(Percent)
Overall Power (hp)
BEP
(gal/min)
2 MP-1 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
Jct Name Vol.
Flow (gal/min)
Mass Flow (lbm/sec) dP
(psid) dH
(feet)
Overall Efficiency (Percent)
Speed
(Percent)
Overall Power (hp)
BEP
(gal/min)
3 MP-2 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
4 MP-3 750.0 104.0 86.92 201.1 100.0 N/A 38.02 N/A
5 JP-4 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
6 SP-1 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
7 SP-2 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
8 FP-WS3 0.0 0.0 No Solution No Solution N/A N/A 0.00 N/A
Jct % of
BEP
(Percent)
NPSHA
(feet)
NPSHR
(feet)
2 N/A 227.28 N/A
Jct % of
BEP
(Percent)
NPSHA
(feet)
NPSHR
(feet)
3 N/A 227.28 N/A
4 N/A 29.23 N/A
5 N/A 227.24 N/A
6 N/A 128.16 N/A
7 N/A 129.44 N/A
8 N/A 127.96 N/A
Reservoir Summary
Jct Name Type Liq.
Height (feet)
Liq.
Elevation (feet)
Surface Pressure (psia)
Liquid Volume (feet3)
Liquid Mass (lbm)
Net Vol. Flow (gal/min)
Net Mass Flow (lbm/sec)
1 Water Tk Infinite N/A 0 14.70 N/A N/A -750.0 -104.0
Pipe Output Table rebekah.adams
AFT Fathom Model
Pipe
Name Vol.
Flow Rate (gal/min)
Velocity
(feet/sec)
P Static Max (psia)
P Static Min
(psia)
Elevation Inlet (feet)
Elevation Outlet (feet) dP Stag.
Total (psid)
1 Pipe 750.0 2.128 14.67 14.59 0.000 0.000 0.078089
X2 Pipe 0.0 0.000 14.62 14.62 0.000 2.666 1.152514
3 Pipe 750.0 2.128 14.59 14.58 0.000 0.000 0.011561
Pipe
Name Vol.
Flow Rate (gal/min)
Velocity
(feet/sec)
P Static Max (psia)
P Static Min
(psia)
Elevation Inlet (feet)
Elevation Outlet (feet) dP Stag.
Total (psid)
X4 Pipe 0.0 0.000 14.61 14.61 0.000 2.666 1.152514
5 Pipe 750.0 2.128 14.58 14.57 0.000 0.000 0.007543
6 Pipe 750.0 4.810 14.44 12.94 0.000 2.666 1.501046
X7 Pipe 0.0 0.000 14.60 14.60 0.000 0.000 0.000000
X8 Pipe 0.0 0.000 No Solution No Solution 0.000 2.666 1.152514
9 Pipe 0.0 0.000 No Solution No Solution 0.000 0.000 0.000000
X10 Pipe 0.0 0.000 No Solution No Solution 0.000 2.666 1.152514
11 Pipe 0.0 0.000 No Solution No Solution 0.000 0.000 0.000000
X12 Pipe 0.0 0.000 No Solution No Solution 0.000 2.666 1.152514
13 Pipe 0.0 0.000 No Solution No Solution 0.000 0.000 0.000000
14 Pipe 0.0 0.000 No Solution No Solution 0.000 2.666 1.152514
15 Pipe 0.0 0.000 98.72 98.72 2.666 2.666 0.000000
16 Pipe 0.0 0.000 98.72 98.72 2.666 2.666 0.000000
17 Pipe 750.0 8.329 99.55 98.25 2.666 2.666 1.304820
18 Pipe 0.0 0.000 98.70 98.70 2.666 2.666 0.000000
19 Pipe 0.0 0.000 No Solution No Solution 2.666 2.666 0.000000
20 Pipe 0.0 0.000 No Solution No Solution 2.666 2.666 0.000000
21 Pipe 0.0 0.000 No Solution No Solution 2.666 2.666 0.000000
22 Pipe 0.0 0.000 No Solution No Solution 2.666 2.666 0.000000
23 Pipe 750.0 2.128 98.67 98.67 2.666 2.666 0.001758
24 Pipe 0.0 0.000 98.72 98.72 2.666 2.666 0.000000
25 Pipe 0.0 0.000 98.72 98.72 2.666 2.666 0.000000
26 Pipe 750.0 2.128 98.69 98.67 2.666 2.666 0.017963
27 Pipe 0.0 0.000 No Solution No Solution 2.666 2.666 0.000000
X28 Pipe 0.0 0.000 98.70 98.70 2.666 2.666 0.000000 rebekah.adams
AFT Fathom Model
Pipe dP Static Total (psid) dP Gravity (psid) dH
(feet)
P Static In
(psia)
P Static Out
(psia)
P Stag. In
(psia)
P Stag. Out
(psia)
1 0.078089 0.000 0.180637 14.67 14.59 14.70 14.62
X2 1.152514 1.153 0.000000 14.62 No Solution 14.62 No Solution
3 0.011561 0.000 0.026742 14.59 14.58 14.62 14.61
Pipe dP Static Total (psid) dP Gravity (psid) dH
(feet)
P Static In
(psia)
P Static Out
(psia)
P Stag. In
(psia)
P Stag. Out
(psia)
X4 1.152514 1.153 0.000000 14.61 No Solution 14.61 No Solution
5 0.007543 0.000 0.017449 14.58 14.57 14.61 14.60
6 1.501046 1.153 0.806226 14.44 12.94 14.60 13.10
X7 0.000000 0.000 0.000000 14.60 No Solution 14.60 No Solution
X8 1.152514 1.153 0.000000 No Solution No Solution No Solution No Solution
9 0.000000 0.000 0.000000 No Solution No Solution No Solution No Solution
X10 1.152514 1.153 0.000000 No Solution No Solution No Solution No Solution
11 0.000000 0.000 0.000000 No Solution No Solution No Solution No Solution
X12 1.152514 1.153 0.000000 No Solution No Solution No Solution No Solution
13 0.000000 0.000 0.000000 No Solution No Solution No Solution No Solution
14 1.152514 1.153 0.000000 No Solution No Solution No Solution No Solution
15 0.000000 0.000 0.000000 98.72 98.72 98.72 98.72
16 0.000000 0.000 0.000000 98.72 98.72 98.72 98.72
17 1.304820 0.000 3.018316 99.