08 Planning - Project AF 66 Form - GLEN 12-1027.xls
XLS spreadsheet 121 KB Posted
- Solicitation number
- FA2550-20-R-0002
About this file
This document contains a schedule of material submittals and federal contract solicitation for replacing domestic water pumps and piping at Building 420 of the Glen Air Force Base. The schedule outlines 15 required submittals including project schedules, health and safety plans, pump and VFD specifications, piping and electrical drawings, O&M manuals, and test results. Submittals are due before equipment ordering and project closeout. The solicitation seeks replacement of four medium domestic pumps operating on variable frequency drives to cover water flows from 100 to 600 GPM. It also requires replacement of all steel water piping infrastructure to accommodate new pump flows and sizes, including new valves, fittings, and a fire department connection at an approved location. The Air Force Space Command is the issuing agency.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| GLEN12-1027 | Repair by Replacing Domestic Water Pumps | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | CERTIFICATE OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS | |
| GENERAL | ||||||||||||||||||||||
| 1 | Project Specific MSDS Sheets | x | NTP + 7 Days | |||||||||||||||||||
| 2 | Form-3064 Contract Progress Schedule | x | NTP + 7 Days | |||||||||||||||||||
| 1 | Form-3065 Contract Progress Report | x | NTP + 7 Days | |||||||||||||||||||
| 2 | Health, Safety, and Environment Plan(s) | x | NTP + 7 Days | |||||||||||||||||||
| 3 | Contractor's QA/QC Plan | x | NTP + 7 Days | |||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 4 | Pumps | x | x | x | x | Before ordering | ||||||||||||||||
| 5 | VFDs | x | x | x | x | Before ordering | ||||||||||||||||
| 6 | Piping | x | x | x | x | Before ordering | ||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 7 | Cables | x | x | x | Before ordering | |||||||||||||||||
| 8 | Switches | x | x | x | Before ordering | |||||||||||||||||
| 9 | Panels | x | x | x | Before ordering | |||||||||||||||||
| 10 | Breakers | x | x | x | Before ordering | |||||||||||||||||
| 11 | Conduits | x | x | x | Before ordering | |||||||||||||||||
| 12 | Controls system | x | x | x | Before ordering | |||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| 13 | Paint | x | x | x | x | Before ordering | ||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 13 | O&M Maintainance data, manuals and Manufacturer's Warranties | Before project close out | ||||||||||||||||||||
| 14 | Factory and Field Test Certificates, Logs and Test Results | Before project close out | ||||||||||||||||||||
| 15 | As Built Submittal | Before project close out |