This document contains a federal contract solicitation and related questions and answers file. The solicitation seeks a contractor to replace HVAC system components in Building 3656 at Patrick Air Force Base Youth Center in Florida. The contractor will provide all labor, equipment except for a government furnished chiller, and materials according to drawings and specifications to complete the work. A pre-bid site visit was held on July 23, 2020 at the Youth Center location. Questions were required to be submitted in writing by July 28, 2020 to listed points of contact. Bids are due by August 17, 2020 at 9:00 AM EST. The related questions and answers file confirms there is no asbestos or lead paint in the project scope. It also clarifies that an existing chemical treatment system is to remain operational once a new chiller is installed, and corrects the number of attachments in the solicitation from six to five.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

August 11, 2020

Solicitation: FA2521‐20‐B‐0001, Project Number: SXHT 12‐1048 Project Description: Repair HVAC, YC (Bldg. 3656)

Patrick AFB, FL

Q21: Please confirm that there is no Asbestos and/or Lead Paint on this project.

A21. Civil Engineering confirms there is no Asbestos within project scope of work as indicated in Attachments 1 Asbestos Survey Results within the specification.

Contractor to conduct Lead Base Paint Survey to verify any LBP within project area of work due to regulatory notification with the installation environmental office regarding demolition work as stated in specification 01 57 19_1.5.2. Contractor requires updated survey of LBP prior to any demolition work being performed.

Q22. A review of the answer to Question 16 does not address Flag note 14. Is there a Flag Note 14 on drawing MD-301?

A22. Flag note 14 encompasses the overall project and is more of a general note indicating the existing chemical treatment system integrated is to remain & stay in operation once the new cooling tower is installed. Flag note 14 is a general note (25) in sheet M-002 and should be treated as a general note overall.

Q23: Item L-4 in Section L of the solicitation states that there are six (6) attachments but there are only five (5) attachments listed. Is there an Attachment 6?

A23: Item L-4 in Section L of the solicitation was corrected via Amendment A0002 to reflect five (5) attachments.

File details come from the government source that posted it. Updated .