Attach 12 Asbestos Report and Floor Views.pdf
PDF 775 KB Posted
- Solicitation number
- FA252120B0003
About this file
This solicitation is for a firm-fixed-price construction contract between $5 million and $8 million to repair the third floor of Building 423 at Patrick Air Force Base in Florida. The project scope includes repairs to the north, center, and west wings. This acquisition is set aside for eligible women-owned small businesses. Electronic bids are due by 19 May 2020, though funds are not presently available and no award will be made until FY2020. All bid prices must be valid through 30 September 2020.
The solicitation provides relevant details on the construction project scope, pricing terms, response deadline, and Women-Owned Small Business set-aside criteria. No award can be made to an offeror not registered in the System for Award Management database. A pre-bid site visit is scheduled for 10:00am on 19 May 2020.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SXHT Patrick Air Force Base-Installation:
Buillding: 423
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1 RR1Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 1 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1 RR2Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONO12" Perforated CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 2 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1 RR8Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
Tuesday, June 27, 2017 Page 3 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Hall2Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper
NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
Tuesday, June 27, 2017 Page 4 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Hall7Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 60 FT2 0NONOWhite Preformed PI
NO_DAMAGE 60 FT2 0NONOWhite Preformed PI
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 60 FT2 0NONOWhite Preformed PI
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
Tuesday, June 27, 2017 Page 5 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Mech12Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 100 FT 0NOYESWhite Preformed PI
NO_DAMAGE 25 FT 0NONO Mudded Joint
NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio
NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 100 FT 0NOYESWhite Preformed PI
Tuesday, June 27, 2017 Page 6 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Mech2Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 25 FT 0NONO Mudded Joint
NO_DAMAGE 25 FT 0NONO Mudded Joint
NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 100 FT 0NOYESWhite Preformed PI
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI
NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu
Tuesday, June 27, 2017 Page 7 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Mech5Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows
NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 40 FT 0NOYESWhite Preformed PI
NO_DAMAGE 6 FT 0NONOWhite Duct Mastic
NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu
NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 6 FT 0NONO Mudded Joint
NO_DAMAGE 40 FT 0NOYESWhite Preformed PI
NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu
NO_DAMAGE 6 FT 0NONO Mudded Joint
NO_DAMAGE 40 FT 0NOYESWhite Preformed PI
NO_DAMAGE 6 FT 0NONOWhite Duct Mastic
NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu
NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 6 FT 0NONOWhite Duct Mastic
NO_DAMAGE 6 FT 0NONO Mudded Joint
NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio
Tuesday, June 27, 2017 Page 8 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Mech8Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 50 FT 0NONOWhite Preformed PI
NO_DAMAGE 50 FT 0NONOWhite Preformed PI
NO_DAMAGE 50 FT 0NONOWhite Preformed PI
NO_DAMAGE 0 FT 0NONOStair Treads
NO_DAMAGE 0 FT 0NONOStair Treads
NO_DAMAGE 0 FT 0NONOStair Treads
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 9 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-1Storage5Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 10 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2 RR12Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 11 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2 RR7Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 65 FT 0NOYESWhite Preformed PI
NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
NO_DAMAGE 65 FT 0NOYESWhite Preformed PI
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
NO_DAMAGE 65 FT 0NOYESWhite Preformed PI
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu
Tuesday, June 27, 2017 Page 12 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2Mech1Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 1 FT2 0NONORed Fire Stop
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 1 FT2 0NONORed Fire Stop
NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 1 FT2 0NONORed Fire Stop
NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows
Tuesday, June 27, 2017 Page 13 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2Mech3Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 80 FT 0NOYESWhite Preformed PI
NO_DAMAGE 80 FT 0NOYESWhite Preformed PI
NO_DAMAGE 30 FT 0NONO Mudded Joint
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 30 FT 0NONO Mudded Joint
NO_DAMAGE 80 FT 0NOYESWhite Preformed PI
NO_DAMAGE 200 FT 0NONOWhite Duct Mastic
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 30 FT 0NONO Mudded Joint
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
Tuesday, June 27, 2017 Page 14 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2Mech5Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 25 FT 0NOYESWhite Preformed PI
NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu
Tuesday, June 27, 2017 Page 15 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2Storage1Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT
NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
Tuesday, June 27, 2017 Page 16 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-2Storage3Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 17 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3 RR10Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 18 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3 RR5Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 19 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3 RR9Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
Tuesday, June 27, 2017 Page 20 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Hall3Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
Tuesday, June 27, 2017 Page 21 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Hall6Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
Tuesday, June 27, 2017 Page 22 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Hall7Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 30 FT 0NOYESWhite Preformed PI
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 150 FT 0NONOWhite Duct Mastic
NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
Tuesday, June 27, 2017 Page 23 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Mech2Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 100 FT 0NONOWhite Duct Mastic
NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 300 FT 0NONOWhite Duct Mastic
NO_DAMAGE 75 FT 0NOYESWhite Preformed PI
NO_DAMAGE 75 FT 0NOYESWhite Preformed PI
NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 220 FT 0NONOWhite Duct Mastic
NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 220 FT 0NONOWhite Duct Mastic
NO_DAMAGE 75 FT 0NOYESWhite Preformed PI
Tuesday, June 27, 2017 Page 24 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Mech4Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 220 FT 0NONOWhite Duct Mastic
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 60 FT 0NOYESWhite Preformed PI
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 60 FT 0NOYESWhite Preformed PI
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 60 FT 0NOYESWhite Preformed PI
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 45 FT 0NOYESWhite Preformed PI
Tuesday, June 27, 2017 Page 25 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-3Mech6Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows
NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 45 FT 0NOYESWhite Preformed PI
NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper
NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu
NO_DAMAGE 45 FT 0NOYESWhite Preformed PI
NO_DAMAGE 10 FT 0NONO Mudded Joint
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 26 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C101Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 27 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C105Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
Tuesday, June 27, 2017 Page 28 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C110Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
Tuesday, June 27, 2017 Page 29 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C114Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 30 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C121Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 31 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C123Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
Tuesday, June 27, 2017 Page 32 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C127Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
Tuesday, June 27, 2017 Page 33 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C130Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 34 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C132Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 35 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C201Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
Tuesday, June 27, 2017 Page 36 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C202ARoom / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 37 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C203Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
Tuesday, June 27, 2017 Page 38 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C206Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 39 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C206ARoom / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
Tuesday, June 27, 2017 Page 40 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C208Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 41 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C211Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 42 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C222Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 43 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C241Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
Tuesday, June 27, 2017 Page 44 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C246Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 45 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C247Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 46 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C248Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
Tuesday, June 27, 2017 Page 47 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C253Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 48 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C254Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Black Baseboard
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
Tuesday, June 27, 2017 Page 49 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C255Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou
Tuesday, June 27, 2017 Page 50 of 169
HQ WGFacility Description:
Asbestos Survey Report By Room
423-C259Room / Area:
Room Area Size: FT2
Friable Asbestos AmountCondition
Hazard Rating/Required Action Material Description
NO_DAMAGE 0 FT2 0NONOBlue Carpet
NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard
NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP
NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic
NO_DAMAGE 0 FT2 0YESNOBack Air…
This is the start of the file's text. The full file is on GovTribe.