Attach 12 Asbestos Report and Floor Views.pdf

PDF 775 KB Posted

Attached to
Repairs to Building 423, 3rd Floor (North, Center & West Side)
Solicitation number
FA252120B0003
Issued by

About this file

This solicitation is for a firm-fixed-price construction contract between $5 million and $8 million to repair the third floor of Building 423 at Patrick Air Force Base in Florida. The project scope includes repairs to the north, center, and west wings. This acquisition is set aside for eligible women-owned small businesses. Electronic bids are due by 19 May 2020, though funds are not presently available and no award will be made until FY2020. All bid prices must be valid through 30 September 2020.

The solicitation provides relevant details on the construction project scope, pricing terms, response deadline, and Women-Owned Small Business set-aside criteria. No award can be made to an offeror not registered in the System for Award Management database. A pre-bid site visit is scheduled for 10:00am on 19 May 2020.

View the file

Other files

File Type Posted
Amendment 006 FA252120B00030006.pdf PDF
Attach 9A Bid Schedule Revision 1.pdf PDF
Amendment 005 FA252120B00030005.pdf PDF
Attach 1A- SXHT 17-1023 Revised Technical Specs.pdf PDF
Attach 3B Ref Ceiling Demo Due to Fire Main ONLY.pdf PDF
Attach 3A SXHT 17-1023 Revised Drawings.pdf PDF
Solicitation Amendment 004 FA252120B00030004.pdf PDF
Attach 8A Pre-Site Visit Attendance.pdf PDF
Attach 14- Interior Design Package.pdf PDF
Attach 11A -Consolidated Answers to Questions.pdf PDF
Attach 13 COMM grounding-n-bonding Reference.pdf PDF
Amendment 003 FA252120B0003003.pdf PDF
Amendment 002 FA252120B00030002.pdf PDF
Amendment 001 FA252120B00030001.pdf PDF
Attach 6- Installation Access List Revision 1.pdf PDF
Attach 8- Pre-Site Visit RuleofEngagement.pdf PDF
Attach 9 Bid Schedule.doc DOC document
Solicitation - FA252120B0003.pdf PDF
Attach 1- SXHT 17-1023 Technical Specs.pdf PDF
Attach 6- Installation Access List.pdf PDF
Attach 5- SHXT 17-1023 Furniture Package.pdf PDF
Attach 3- SXHT 17-1023 Drawings.pdf PDF
Attach 10 Submittal Register.xls XLS spreadsheet
Attach 11- Q and A Template.doc DOC document
Attach 7 WD FL20200001 27Mar2020.pdf PDF
Attach 4 - SXHT 17-1023 HAZ Waste.doc DOC document
Attach 2- SXHT 17-1023 SOW.doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SXHT Patrick Air Force Base-Installation:

Buillding: 423

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1 RR1Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 1 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1 RR2Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONO12" Perforated CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 2 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1 RR8Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

Tuesday, June 27, 2017 Page 3 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Hall2Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper

NO_DAMAGE 0 FT2 0NONOGrey Spc Wall Paper

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

Tuesday, June 27, 2017 Page 4 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Hall7Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 60 FT2 0NONOWhite Preformed PI

NO_DAMAGE 60 FT2 0NONOWhite Preformed PI

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 60 FT2 0NONOWhite Preformed PI

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

Tuesday, June 27, 2017 Page 5 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Mech12Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 8 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 100 FT 0NOYESWhite Preformed PI

NO_DAMAGE 25 FT 0NONO Mudded Joint

NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio

NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 100 FT 0NOYESWhite Preformed PI

Tuesday, June 27, 2017 Page 6 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Mech2Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 25 FT 0NONO Mudded Joint

NO_DAMAGE 25 FT 0NONO Mudded Joint

NO_DAMAGE 80 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 100 FT 0NOYESWhite Preformed PI

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 50 FT 0NOYESWhite Foam Insulatio

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 20 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI

NO_DAMAGE 10 FT2 0NOYESWhite Preformed PI

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu

Tuesday, June 27, 2017 Page 7 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Mech5Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 20 FT 0NOYESBlue Foam Elbows

NO_DAMAGE 100 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 40 FT 0NOYESWhite Preformed PI

NO_DAMAGE 6 FT 0NONOWhite Duct Mastic

NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu

NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 6 FT 0NONO Mudded Joint

NO_DAMAGE 40 FT 0NOYESWhite Preformed PI

NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu

NO_DAMAGE 6 FT 0NONO Mudded Joint

NO_DAMAGE 40 FT 0NOYESWhite Preformed PI

NO_DAMAGE 6 FT 0NONOWhite Duct Mastic

NO_DAMAGE 40 FT 0YESNOFoam Glass Pipe Insu

NO_DAMAGE 8 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 6 FT 0NONOWhite Duct Mastic

NO_DAMAGE 6 FT 0NONO Mudded Joint

NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio

Tuesday, June 27, 2017 Page 8 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Mech8Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 60 FT 0NONOWhite Foam Insulatio

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 50 FT 0NONOWhite Preformed PI

NO_DAMAGE 50 FT 0NONOWhite Preformed PI

NO_DAMAGE 50 FT 0NONOWhite Preformed PI

NO_DAMAGE 0 FT 0NONOStair Treads

NO_DAMAGE 0 FT 0NONOStair Treads

NO_DAMAGE 0 FT 0NONOStair Treads

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 9 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-1Storage5Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 10 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2 RR12Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 11 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2 RR7Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 65 FT 0NOYESWhite Preformed PI

NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

NO_DAMAGE 65 FT 0NOYESWhite Preformed PI

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

NO_DAMAGE 65 FT 0NOYESWhite Preformed PI

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu

Tuesday, June 27, 2017 Page 12 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2Mech1Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 55 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 6 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 1 FT2 0NONORed Fire Stop

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 1 FT2 0NONORed Fire Stop

NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 30 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 1 FT2 0NONORed Fire Stop

NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows

Tuesday, June 27, 2017 Page 13 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2Mech3Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 28 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 80 FT 0NOYESWhite Preformed PI

NO_DAMAGE 80 FT 0NOYESWhite Preformed PI

NO_DAMAGE 30 FT 0NONO Mudded Joint

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 30 FT 0NONO Mudded Joint

NO_DAMAGE 80 FT 0NOYESWhite Preformed PI

NO_DAMAGE 200 FT 0NONOWhite Duct Mastic

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 30 FT 0NONO Mudded Joint

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

Tuesday, June 27, 2017 Page 14 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2Mech5Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 70 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 16 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 25 FT 0NOYESWhite Preformed PI

NO_DAMAGE 170 FT 0YESYESFoam Glass Pipe Insu

Tuesday, June 27, 2017 Page 15 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2Storage1Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT

NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 1 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT2 0NONO12x12 Gray/White FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

Tuesday, June 27, 2017 Page 16 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-2Storage3Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO12x12 White/Blk FT

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 17 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3 RR10Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 18 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3 RR5Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 19 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3 RR9Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

Tuesday, June 27, 2017 Page 20 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Hall3Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

Tuesday, June 27, 2017 Page 21 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Hall6Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNO12x12 Cream/Brown FT

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

Tuesday, June 27, 2017 Page 22 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Hall7Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 12 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 60 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 30 FT 0NOYESWhite Preformed PI

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 150 FT 0NONOWhite Duct Mastic

NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 25 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

Tuesday, June 27, 2017 Page 23 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Mech2Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 45 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 100 FT 0NONOWhite Duct Mastic

NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 24 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 300 FT 0NONOWhite Duct Mastic

NO_DAMAGE 75 FT 0NOYESWhite Preformed PI

NO_DAMAGE 75 FT 0NOYESWhite Preformed PI

NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 220 FT 0NONOWhite Duct Mastic

NO_DAMAGE 22 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 220 FT 0NONOWhite Duct Mastic

NO_DAMAGE 75 FT 0NOYESWhite Preformed PI

Tuesday, June 27, 2017 Page 24 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Mech4Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 220 FT 0NONOWhite Duct Mastic

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 85 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 60 FT 0NOYESWhite Preformed PI

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 60 FT 0NOYESWhite Preformed PI

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 30 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 20 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 60 FT 0NOYESWhite Preformed PI

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 45 FT 0NOYESWhite Preformed PI

Tuesday, June 27, 2017 Page 25 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-3Mech6Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 10 FT 0NOYESFoam Glass Elbows

NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 45 FT 0NOYESWhite Preformed PI

NO_DAMAGE 85 FT2 0YESYESWhite Duct Paper

NO_DAMAGE 50 FT 0YESYESFoam Glass Pipe Insu

NO_DAMAGE 45 FT 0NOYESWhite Preformed PI

NO_DAMAGE 10 FT 0NONO Mudded Joint

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 26 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C101Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 27 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C105Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

Tuesday, June 27, 2017 Page 28 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C110Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

Tuesday, June 27, 2017 Page 29 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C114Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 30 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C121Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 31 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C123Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

Tuesday, June 27, 2017 Page 32 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C127Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

Tuesday, June 27, 2017 Page 33 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C130Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 34 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C132Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 35 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C201Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

Tuesday, June 27, 2017 Page 36 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C202ARoom / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 37 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C203Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

Tuesday, June 27, 2017 Page 38 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C206Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 39 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C206ARoom / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

Tuesday, June 27, 2017 Page 40 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C208Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 41 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C211Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOGray Wall Carpet Tre

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 42 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C222Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 43 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C241Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0YESNOGray/Tan Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

Tuesday, June 27, 2017 Page 44 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C246Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 45 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C247Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 46 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C248Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

Tuesday, June 27, 2017 Page 47 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C253Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 48 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C254Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 2 EAC 0NONOWhite Sink Undercoat

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Black Baseboard

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

Tuesday, June 27, 2017 Page 49 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C255Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

NO_DAMAGE 0 FT2 0NONODrywall/Joint Compou

Tuesday, June 27, 2017 Page 50 of 169

HQ WGFacility Description:

Asbestos Survey Report By Room

423-C259Room / Area:

Room Area Size: FT2

Friable Asbestos AmountCondition

Hazard Rating/Required Action Material Description

NO_DAMAGE 0 FT2 0NONOBlue Carpet

NO_DAMAGE 0 FT 0NONO4" Gray BaseBoard

NO_DAMAGE 0 FT2 0NOYESPinhole & Fissure CP

NO_DAMAGE 0 FT2 0YESNOBack Air Duct Mastic

NO_DAMAGE 0 FT2 0YESNOBack Air…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .