This document contains a hazardous waste forecast form and details of a federal contract opportunity for building repairs. The hazardous waste forecast form is required to be completed by any contractor performing work that involves hazardous materials or the removal and disposal of hazardous waste. It requires contractors to specify each process requiring hazardous materials, describe the materials and processes, and estimate the quantity of waste.
The federal contract opportunity is a solicitation from the Air Force Space Command for repairs to the third floor of Building 423 at Patrick Air Force Base. The project magnitude is estimated between $5 million to $8 million. This acquisition is set aside for women-owned small businesses. Electronic bids are due by May 2020 and the contract award cannot be made to an offeror not registered in the System for Award Management database. The funds are not presently available and the government reserves the right to cancel the solicitation. All bid prices must be valid until September 2020.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION
PROJECT #:
PROJECT TITLE:
| DELIVERY ORDER |
| SXHT 17-1023 |
FA 2521-19-R-00__
Repair 3rd Floor North/West/Center Wings, B423
CONTRACTOR:
POINT OF CONTACT:
PHONE:
FAX:
| HAZARDOUS MATERIAL: |
| DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL |
(INCLUDE METHOD OF APPLICATION)
| DESCRIPTION OF WASTE: |
| QUANTITY: |
Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.
Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:
1) Must remove and dispose of paints, building components, or equiptment containing hazardous materials (lead, mercury, etc.)
2) Submits an MSDS for approval of use of a material known to be hazardous.
On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.
1. Project #: Provide installation project number.
2. Project Title: Provide installation project title.
3. Contractor: Enter complete name of contractor performing process.
4. Point of Contact: Provide name of individual knowledgable on requirements of materials listed.
5. Phone/Fax: Provide phone and fax numbers for point of contact.
6. Hazardous Material: Provide common name of each hazardous material
7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).
8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.
9. Quantity: Estimate quantity of waste to be generated
10. Sign and date each form at bottom
CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________