SF 30 for Amendment #1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Offers.pdf | ||
| 19BA005_AMENDMENT_0002_SF30.pdf | ||
| 19BA005_AMENDMENT_0003_SF30.pdf | ||
| 19BA005_AMENDMENT_0004_SF30.pdf | ||
| SECTION_L_changes.pdf | ||
| GOV_Response_to_Bidders_Questions_-_Phillips_Parkway.pdf | ||
| 19BA005_PRE-BID_ATTENDANCE_SHEET.pdf | ||
| 1.006_-_ATCH__06_-_Scope_of_Work_(1.31.2019).pdf | ||
| Attach_8_-_Wage_Determination_FL190001_04JAN2019.pdf | ||
| Attach_2_-_DBEH161619_Rpr_NB_Phillips_Pkwy_SPECS_FNL_(12.05.2018).pdf | ||
| Attach_6_-_Badge_Request_45_SFS_Form.pdf | ||
| Attach_5_-_CECC_Form_3052.xls | XLS spreadsheet | |
| Attach_7_-__KTR_Hazardous_Waste_Generation_Form.doc | DOC document | |
| Attach_4_-_DBEH161619_Rpr_NB_Phillips_Pkwy_RMD_Form_(P).pdf | ||
| Attach_3_-_DBEH161619_Rpr_NB_Phillips_Pkwy_DRWGS_FNL_(9.09.2018)_RDFS.pdf | ||
| 19BA005_SF1442_FINAL_REVISION.pdf | ||
| Attach_1_-_DBEH161619_Rpr_NB_Phillips_Pkwy_SOW_(01.07.2019).pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
FA2521
The purpose of this amendment is to incorporate the following changes to this solicitation:
1. Attachment 1 has been changed to incorporate the 31JAN2019 DBEH 16-1619 Statement of Work in lieu of the 07JAN2019 DBEH 16-1619 Statement of Work.
POC: Robert J. Baker, 45 CONS/PKAC Contract Specialist, robert.baker.58@us.af.mil, (321) 853-0878
45 CONS/PKAC
14640 HANGAR ROAD
CCAFS 1704 ROOM 2102B MS2037
PATRICK AFB,FL 32925-2206
SEE ITEM 6
J
F3K3DH8252A001
FA252119BA005
DBEH 16-1619
1 2
01/31/2019
01/18/2019
FA252119BA005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
The following have been modified:
LIST OF DOCUMENTS
No. Title/Description No. of Pages Date
1. DBEH 16-1619, Repair NB Phillips Parkway, Statement of Work 3 31 JAN 19
2. DBEH 16-1619, Repair NB Phillips Parkway, Final Specifications 349 AUG 2018
3. DBEH 16-1619, Repair NB Phillips Parkway, Final Drawings 24 09 SEP 18
4. DBEH 16-1619, Repair NB Phillips Parkway, RMD Form 3 10 SEP 18
5. CECC Form 3052 1 N/A
6. 45 SFS Badge Request Form 2 N/A
7. Contractor Hazardous Waste Generation Form 2 N/A
8. Wage Determination FL190001 7 04 JAN 19