Attach_4_-_DBEH161619_Rpr_NB_Phillips_Pkwy_RMD_Form_(P).pdf
PDF 168 KB Posted
- Attached to
- Repair Phillips Pkwy - CCAFS
- Solicitation number
- FA252119BA005
About this file
Attachment 4 - Recovered Materials
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOVERED MATERIALS DETERMINATION FORM
INSTRUCTIONS
This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products. This form is not required for construction item purchases less than $2,000, or for other purchases less than $2,500. The completed form becomes part of the contracting office contract file.
If no EPA designated items were checked on page 1, than check box A:
If any EPA designated items are checked on page 1, than mark box B or C:
If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
Designated Item Justification #
WALLACE.BRIAN.K.1222107055 Digitally signed by WALLACE.BRIAN.K.1222107055 Date: 2018.09.10 06:34:17 -04'00'
WALLACE.BRIAN.K.1222107055 Digitally signed by WALLACE.BRIAN.K.1222107055 Date: 2018.09.10 06:38:04 -04'00'
Part 2 of this certification is to be completed upon receipt of the purchase goods and services. If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services. Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.
If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
Designated Item Justification #
File details come from the government source that posted it.