FA252118R002002.pdf
PDF 138 KB Posted
- Attached to
- Single Award IDIQ - Solicitation Amendment
- Solicitation number
- FA2521-18-R-0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_Clarification.pdf | ||
| All_Q&A_-_Response.pdf | ||
| Site_Visit_Company_List.pdf | ||
| Atch17Q&A.pdf | ||
| FA252118R002003.pdf | ||
| Atch14RuleofEngagementR1.doc | DOC document | |
| 18R002001_(SF30).pdf | ||
| Atch9PPI.docx | DOCX document | |
| Atch43052.xls | XLS spreadsheet | |
| Atch12Client.docx | DOCX document | |
| Atch3HazWasteForm.doc | DOC document | |
| Atch2FL180001_1June2018.pdf | ||
| Atch13Q&A.doc | DOC document | |
| Atch14RuleofEngagement.doc | DOC document | |
| Atch7GPP.doc | DOC document | |
| Atch5SXHT161280Spec.pdf | ||
| Atch6Drawings.pdf | ||
| Atch11Consent.docx | DOCX document | |
| Atch10PPQ.docx | DOCX document | |
| Atch8BadgeRequest.pdf | ||
| Atch15EAL.doc | DOC document | |
| Atch16AMRDEC_Instructions.pdf | ||
| FA252118R0020.pdf | ||
| Atch9PPI.docx | DOCX document | |
| Atch1IDIQSATOCSOW.pdf | ||
| Atch13Q&A.doc | DOC document | |
| Atch15EAL.doc | DOC document | |
| Atch14RuleofEngagement.doc | DOC document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to correct the time of the site visit listed in Attachment 14, Rules of Engagement. The site visit time is changed from 10:00 pm to 10:00 am. The date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA252118R0020
X 9B. DATED (SEE ITEM 11)
05-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jun-2018
CODE
45 CONS/PKAB
1201 EDWARD H WHITE II ST
PATRICK AFB FL 32925-3237
FA2521 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA252118R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J ATTACHMENTS
DOCUMENT DESCRIPTION PAGES DATE
Attachment 1 Statement of Work Single Award IDIQ 12 12 Mar 2018 Attachment 2 Wage Determination (FL180001) 8 1 Jun 2018 Attachment 3 Hazardous Waste 2 8 Mar 2018 Attachment 4 Construction Cost Estimate Breakdown (Template) 1 N/A Attachment 5 SHXT 16-1280 Specifications - Initial Project 178 Feb 2018 Attachment 6 SHXT 16-1280 Drawings 11 8 Mar 2018 Attachment 7 SHXT 16-1280 GPP Certification Form 10 8 Mar 2018 Attachment 8 45 SFS Badge-Visitor Request Form 2 8 Aug 17 Attachment 9 Past Performance Information 5 N/A Attachment 10 Past Performance Questionaire 8 N/A Attachment 11 Consent Form 11 N/A Attachment 12 Client Authorization Letter 2 N/A Attachment 13 Questions & Answer Template 1 N/A Attachment 14 Site Visit Rules of Engagement, Rev 1 1 N/A Attachment 15 Entry Authority List Request 1 N/A Attachment 16 ARMDEC User Guide 5 N/A
(End of Summary of Changes)
File details come from the government source that posted it.