Atch3HazWasteForm.doc

DOC document 41 KB Posted

Attached to
Single Award IDIQ - Solicitation Amendment
Solicitation number
FA2521-18-R-0020
Issued by

About this file

Hazardous Waste Form

View the file

Other files

File Type Posted
QA_Clarification.pdf PDF
All_Q&A_-_Response.pdf PDF
Site_Visit_Company_List.pdf PDF
Atch17Q&A.pdf PDF
FA252118R002003.pdf PDF
FA252118R002002.pdf PDF
Atch14RuleofEngagementR1.doc DOC document
Atch9PPI.docx DOCX document
18R002001_(SF30).pdf PDF
Atch43052.xls XLS spreadsheet
Atch12Client.docx DOCX document
Atch15EAL.doc DOC document
Atch16AMRDEC_Instructions.pdf PDF
FA252118R0020.pdf PDF
Atch9PPI.docx DOCX document
Atch1IDIQSATOCSOW.pdf PDF
Atch2FL180001_1June2018.pdf PDF
Atch13Q&A.doc DOC document
Atch14RuleofEngagement.doc DOC document
Atch7GPP.doc DOC document
Atch5SXHT161280Spec.pdf PDF
Atch6Drawings.pdf PDF
Atch11Consent.docx DOCX document
Atch10PPQ.docx DOCX document
Atch8BadgeRequest.pdf PDF
Atch14RuleofEngagement.doc DOC document
Atch13Q&A.doc DOC document
Atch15EAL.doc DOC document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT 16-1280
PROJECT TITLE:
Repair Upgrade Perimeter Fence

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equipment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgeable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

ATCH 3

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________

File details come from the government source that posted it.