Atch_9_-_1H-60(H)G-2-1.PDF
PDF 24 MB Posted
- Attached to
- Aircraft Wash and Lube Federal contract opportunity
- Solicitation number
- FA2521-16-Q-B026
About this file
Technical Order
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_1_-_PWS_-_Rev_11_Mar_16.docx | DOCX document | |
| Questions-Answers_4.pdf | ||
| Questions-Answers_3_10_Mar_16.pdf | ||
| Questions-Answers_2.pdf | ||
| Questions-Answers_-_1_4_Mar_16.pdf | ||
| Atch_4_-_T.O._1-1-691.PDF | ||
| Atch_2_-_QASP_16-Q-B026.docx | DOCX document | |
| Atch_3_-_SCA_WD_2005-2117 _Rev_18 _dated_29_Dec_15.pdf | ||
| Atch_7_-_T.O._1C-130H-2-12JG-20-1.PDF | ||
| Atch_5_-_T.O._1C-130A-23.PDF | ||
| Atch_8_-_T.O._1H-60(H)G-23.PDF | ||
| Atch_6_-_T.O._1C-130A-23CL-1.PDF | ||
| Atch_11_-_T.O._MXG_MOI_21-106.pdf | ||
| Atch_1_-_PWS.docx | DOCX document | |
| Atch_10_-_T.O._1H-60(H)G-2-1CL-7.PDF |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO 1H-60(H)G-2-1
TECHNICAL MANUAL
ORGANIZATIONAL
AND
INTERMEDIATE MAINTENANCE
AIRCRAFT
GENERAL INFORMATION MANUAL
FOR HH-60 SERIES HELICOPTER
DISTRIBUTION STATEMENT D - Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use) (15 April 2013). Refer other requests for this document to AFLCMC/WIUBC, Robins AFB, GA 31098.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.
2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
HANDLING AND DESTRUCTION NOTICE - Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Published Under Authority of the Secretary of the Air Force
15 APRIL 2013 CHANGE 7 - 15 DECEMBER 2015
BASIC AND ALL UPDATES HAVE BEEN MERGED TO MAKE A COMPLETE PUBLICATION
NOTE: The portion of the text affected by the change is indicated by a vertical line in the outer margin of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.
INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.
*Zero in this column indicates an original page.
USAF
Dates of issue for original and changed pages are:
A Change 7
LIST OF EFFECTIVE PAGES
Title A - B C Blank i ii iii iv - vii viii ix - xiv 1-1 1-2 Blank 2-1 2-2 2-3 - 2-34 2-35 2-36 - 2-41 2-42 2-43 - 2-106 2-107 2-108 2-109 - 2-111 2-112 2-113 - 2-164 2-165 - 2-168 2-169 - 2-173 2-174 Blank 3-1 - 3-27 3-28 Blank 4-1 4-2 - 4-3 4-4 4-5 4-6 4-6.1 Added 4-6.2 Blank Added 4-7 - 4-14 5-1 - 5-3 5-4 5-5 5-6 6-1 6-2 - 6-10 6-11 6-12 - 6-13 6-14
6-15 6-16 6-17 - 6-19 6-20 6-21 6-22 6-23 6-24 6-25 6-26 6-27 6-28 6-29 - 6-30 6-30.1 Added 6-30.2 Blank Added 6-31 6-32 6-33 6-34 7-1 - 7-18 A-1 - A-11 A-12
FP-1
FP-2 Blank
FP-3
FP-4 Blank
FP-5
FP-6 Blank
FP-7
FP-8 Blank
FP-9
FP-10 Blank
FP-11
FP-12 Blank
FP-13
FP-14 Blank
FP-15
FP-16 Blank
FP-17
FP-18 Blank
FP-19
FP-20 Blank
FP-21
FP-22 Blank
FP-23
FP-24 Blank
FP-25
FP-26 Blank
FP-27
FP-28 Blank
FP-29
FP-30 Blank
FP-31
FP-32 Blank
FP-33
FP-34 Blank
FP-35
FP-36 Blank
FP-37
FP-38 Blank
FP-39
FP-40 Blank
FP-41
FP-42 Blank
FP-43
FP-44 Blank
FP-45
FP-46 Blank
FP-47
FP-48 Blank
FP-49
FP-50 Blank
FP-51
FP-52 Blank
FP-53
FP-54 Blank
FP-55
FP-56 Blank
FP-57
FP-58 Blank
FP-59
FP-60 Blank
FP-61
FP-62 Blank
FP-63
FP-64 Blank
FP-65
FP-66 Blank
FP-67
FP-68 Blank
Original . . . . . . . . . . . . . . 0 . . . . . . . . . . . 15 April 2013 Change . . . . . . . . . . . . . . . 1 . . . . . . . . . . . 1 August 2013 Change . . . . . . . . . . . . . . . 2 . . . . . . . . . 1 February 2014 Change . . . . . . . . . . . . . . . 3 . . . . . . . 15 November 2014
Change. . . . . . . . . . . . . . . 4 . . . . . . . . . . 15 March 2015 Change. . . . . . . . . . . . . . . 5 . . . . . . . 15 September 2015 Change. . . . . . . . . . . . . . . 6 . . . . . . . . 1 November 2015 Change. . . . . . . . . . . . . . . 7 . . . . . . . 15 December 2015
TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 550, CONSISTING OF THE FOLLOWING:
Page *Change No. No.
Page *Change No. No.
Page *Change No. No.
LIST OF EFFECTIVE PAGES
*Zero in this column indicates an original page.
Change 7 B/(C blank)
Page *Change No. No.
Page *Change No. No.
Page *Change No. No.
FP-69
FP-70 Blank
FP-71
FP-72 Blank
FP-73
FP-74 Blank
FP-75
FP-76 Blank
FP-77
FP-78 Blank
FP-79
FP-80 Blank
FP-81
FP-82 Blank
FP-83
FP-84 Blank
FP-85
FP-86 Blank
FP-87
FP-88 Blank
FP-89
FP-90 Blank
FP-91
FP-92 Blank
FP-93
FP-94 Blank
FP-95
FP-96 Blank
FP-97
FP-98 Blank
FP-99
FP-100 Blank
FP-101
FP-102 Blank
FP-103
FP-104 Blank
FP-105
FP-106 Blank
FP-107
FP-108 Blank
FP-109
FP-110 Blank
FP-111
FP-112 Blank
FP-113
FP-114 Blank
FP-115
FP-116 Blank
FP-117
FP-118 Blank
FP-119
FP-120 Blank
FP-121
FP-122 Blank
FP-123
FP-124 Blank
FP-125
FP-126 Blank
FP-127
FP-128 Blank
FP-129
FP-130 Blank
FP-131
FP-132 Blank
FP-133
FP-134 Blank
FP-135
FP-136 Blank
FP-137
FP-138 Blank
FP-139
FP-140 Blank
FP-141
FP-142 Blank
FP-143
FP-144 Blank
FP-145
FP-146 Blank
FP-147
FP-148 Blank
FP-149
FP-150 Blank
FP-151
FP-152 Blank
FP-153
FP-154 Blank
FP-155
FP-156 Blank
FP-157
FP-158 Blank
FP-159
FP-160 Blank
FP-161
FP-162 Blank
FP-163
FP-164 Blank
FP-165
FP-166 Blank
FP-167
FP-168 Blank
FP-169
FP-170 Blank
FP-171
FP-172 Blank
FP-173
FP-174 Blank
FP-175
FP-176 Blank
FP-177
FP-178 Blank
FP-179
FP-180 Blank
FP-181
FP-182 Blank
FP-183
FP-184 Blank
FP-185
FP-186 Blank
FP-187
FP-188 Blank
FP-189
FP-190 Blank
FP-191
FP-192 Blank
FP-193
FP-194 Blank
FP-195
FP-196 Blank
FP-197
FP-198 Blank
FP-199
FP-200 Blank
FP-201
FP-202 Blank
FP-203
FP-204 Blank
FP-205
FP-206 Blank
FP-207
FP-208 Blank
FP-209
FP-210 Blank
FP-211
FP-212 Blank
FP-213
FP-214 Blank
FP-215
FP-216 Blank
FP-217
FP-218 Blank
FP-219
FP-220 Blank
FP-221
FP-222 Blank
FP-223
FP-224 Blank
FP-225
FP-226 Blank
FP-227
FP-228 Blank
FP-229
FP-230 Blank
FP-231
FP-232 Blank
FP-233
FP-234 Blank
FP-235
FP-236 Blank
FP-237
FP-238 Blank FP-239 Added FP-240 Blank Added
TABLE OF CONTENTS
Chapter Page Chapter Page
FOREWORD...............................................................ix
SAFETY SUMMARY ..............................................xiii
1 GENERAL INFORMATION....................................1-1
1.1 GENERAL...................................................1-1
1.1.1 Scope............................................................1-1
1.1.2 Maintenance Forms and Records.................1-1
1.1.3 Connection of Electric Connec-
tors ..........................................................1-1
1.1.4 Routing and Clamping of Wire
Harnesses ................................................1-1
1.1.5 Deleted
1.1.6 Removal of Electrical Power for
Line Replaceable Unit (LRU) Replacement............................................1-1
2 EQUIPMENT DESCRIPTION AND
DATA ...................................................................2-1
2.1 AIRCRAFT DESCRIPTION.......................2-1
2.1.1 General .........................................................2-1
2.1.2 Electromagnetic Environment
(EME) .....................................................2-1
2.1.3 Principal Dimensions ...................................2-1
2.1.4 Stations, Waterlines, and But-
tlines........................................................2-1
2.1.5 Access and Inspection Provisions ................2-1
2.1.6 Steps, Handholds, and Walkways ................2-1
2.2 AIRFRAME.................................................2-1
2.2.1 Aircraft Structure .........................................2-1
2.2.2 Cockpit .......................................................2-15
2.2.3 Cabin ..........................................................2-16
2.2.4 Transition Section ......................................2-22
2.2.5 Main Rotor Pylon.......................................2-22
2.2.6 Tail Cone....................................................2-26
2.2.7 Tail Pylon...................................................2-26
2.2.8 Stabilator ....................................................2-26
2.2.9 Armor Plating.............................................2-26
2.2.10 Vibration Absorbers...................................2-26
2.2.11 Wire Strike Protection System...................2-26
2.3 LANDING GEAR......................................2-29
2.3.1 Main Landing Gear ....................................2-29
2.4 POWER PACKAGE..................................2-34
2.4.1 Demountable Power Package.....................2-34
2.4.2 Engine ........................................................2-34
2.5 ENGINE CONTROL SYSTEMS..............2-43
2.5.1 Load-Demand System................................2-43
2.5.2 Power Control System ...............................2-43
2.5.3 Speed Control System................................2-43
2.5.4 Engine Controls Quadrant..........................2-43
2.6 ENGINE START AND IGNI-
TION SYSTEM ....................................2-43
2.7 ENGINE SPEED TRIM SYSTEM............2-46
2.8 ENGINE OVERSPEED PRO-
TECTION SYSTEM.............................2-46
2.8.1 Overspeed Test Buttons .............................2-46
2.8.2 100% Np ....................................................2-46
2.8.3 Overspeed Signal .......................................2-46
2.8.4 Collective Stick Position Censor ...............2-46
2.9 ENGINE INDICATING SYS-
TEMS....................................................2-46
2.9.1 Power Turbine Gas Temperature
Indicating System .................................2-49
2.9.2 Oil Temperature Indicating Sys-
tem ........................................................2-49
2.9.3 Oil Pressure Indicating System..................2-49
2.9.4 Engine Torque Indicating System..............2-49
2.9.5 Power Turbine/Rotor Speed Indi-
cating System........................................2-49
2.9.6 Gas Generator Speed Indicating
System...................................................2-49
2.10 ENGINE WARNNG SYSTEMS...............2-49
2.10.1 Fuel Pressure Warning System ..................2-49
2.10.2 Fuel Filter Bypass Warning Sys-
tem ........................................................2-49
2.10.3 Oil Pressure Warning System ....................2-51
2.10.4 Oil Temperature Warning System .............2-51
2.10.5 Oil Filter Bypass Warning Sys-
tem ........................................................2-51
2.10.6 Chip Detector Warning System .................2-51
2.11 ENGINE ANTI-ICE SYSTEMS ...............2-51
2.12 ENGINE CONTROLS QUAD-
RANT....................................................2-51
2.12.1 Engine Controls Quadrant..........................2-51
2.12.2 Starter and Starter Override
Switches ................................................2-51
2.13 ROTOR SYSTEMS ...................................2-53
2.13.1 Main Rotor Blades .....................................2-53
2.13.2 Pressure Indicator.......................................2-53
2.14 MAIN ROTOR HEAD AND
COMPONENTS ...................................2-53
2.14.1 Droop Stops................................................2-53
2.14.2 Main Rotor Hub .........................................2-53
2.14.3 Bifilar Vibration Absorber .........................2-53
2.14.4 Lead Stops..................................................2-53
2.14.5 **SC** Pitch Control Rods .......................2-57
2.14.6 Dampers .....................................................2-57
2.14.7 Anti-Flapping Assemblies..........................2-57
2.14.8 Swashplate .................................................2-57
2.15 TAIL ROTOR............................................2-57
2.15.1 Tail Rotor Blades .......................................2-57
Change 5 i
2.15.2 Pitch Change Beam ..................................2-60
2.15.3 Pitch Control Links ..................................2-60
2.16 POWERTRAIN ........................................2-60
2.17 TRANSMISSION SYSTEMS..................2-60
2.17.1 Oil Pressure...............................................2-60
2.17.2 Main Transmission ...................................2-60
2.17.3 Main Transmission Warning and
Indicating Systems...............................2-63
2.18 CHIP DETECTOR SYSTEM ..................2-63
2.18.1 Main Gearbox ...........................................2-63
2.18.2 Accessory Modules...................................2-63
2.18.3 Input Modules...........................................2-63
2.18.4 Intermediate Gearbox ...............................2-63
2.18.5 Tail Gearbox .............................................2-64
2.18.6 Transmission Chip Detector Sys-
tem with Self-Test Built-in Test (BIT) ............................................2-64
2.19 GEARBOX OIL CONTAMINA-
TION ....................................................2-64
2.20 INTERMEDIATE GEARBOX ................2-64
2.21 TAIL GEARBOX.....................................2-64
2.22 GUST LOCK............................................2-64
2.23 TAIL ROTOR DRIVE SHAFT...............2-67
2.23.1 Flexible Coupling .....................................2-67
2.23.2 Rotor Brake System .................................2-67
2.23.3 Rotor Brake Master Cylinder...................2-67
2.23.4 Pressure Switch.........................................2-67
2.23.5 Rotor Brake Accumulator ........................2-67
2.23.6 Rotor Brake Assembly .............................2-71
2.23.7 Manifold....................................................2-71
2.23.8 Hydraulic Refill Hand Pump, and
Selector Valve......................................2-71
2.24 HYDRAULIC SYSTEMS........................2-71
2.24.1 Major Components ...................................2-71
2.24.2 No. 1 Hydraulic System...........................2-71
2.24.3 No. 2 System ............................................2-71
2.24.4 Backup Hydraulic System........................2-71
2.24.5 Three Hydraulic Systems .........................2-71
2.24.6 Hydraulic Pump Modules.........................2-71
2.24.7 Transfer Modules......................................2-76
2.24.8 Utility Module ..........................................2-76
2.24.9 Primary Servos .........................................2-76
2.24.10 Pilot Assist Servos, Actuators, and Module ..........................................2-76
2.24.11 Tail Rotor Servo .......................................2-78
2.24.12 Logic Modules..........................................2-78
2.24.13 Primary Servo Shutoff Switch .................2-78
2.24.14 Hydraulic Leak Test Switch and
Isolation System...................................2-78
2.24.15 APU Accumulator ....................................2-81
2.24.16 Winterization Kit Accumulator................2-81
2.24.17 Hydraulic Refill Hand Pump and
Selector Valve......................................2-81
2.24.18 Rescue Hoist Manifold and Prior-
ity Valve...............................................2-81
2.25 FLIGHT INSTRUMENTS.......................2-81
2.25.1 Barometric Altimeters ..............................2-81
2.25.2 Airspeed Indicators...................................2-83
2.25.3 Vertical Speed Indicators .........................2-84
2.25.4 Pitot-Static Pressure System.....................2-84
2.25.5 Radar Altimeters.......................................2-87
2.25.6 Horizontal Situation Indicators ................2-87
2.25.7 Vertical Situation Indicators.....................2-89
2.25.8 Stabilator Position Indicator.....................2-89
2.25.9 Stabilator Position Placard .......................2-89
2.25.10 Standby Compass .....................................2-89
2.25.11 Clock .........................................................2-90
2.26 MISCELLANEOUS SWITCH
PANEL.................................................2-90
2.27 ENGINE INSTRUMENTS ......................2-90
2.28 INSTRUMENT DISPLAY SYS-
TEM .....................................................2-90
2.29 SIGNAL DATA CONVERTER ..............2-90
2.30 CENTRAL DISPLAY UNIT...................2-91
2.30.1 CDU Switches ..........................................2-91
2.31 PILOT’S AND COPILOT’S
DISPLAY UNIT..................................2-94
2.31.1 Introduction...............................................2-94
2.31.2 Vertical Displays and Digital
Readouts...............................................2-94
2.32 CAUTION/ADVISORY WARN-
ING SYSTEM .....................................2-94
2.33 CAUTION/ADVISORY WARN-
ING PANEL ........................................2-94
2.34 FREE-AIR THERMOMETER.................2-97
2.35 AC ELECTRICAL SYSTEM ..................2-97
2.35.1 General......................................................2-97
2.35.2 Auxiliary/Primary/External AC
Power ...................................................2-97
2.35.3 Component Description............................2-97
2.36 DC ELECTRICAL SYSTEM ................2-104
2.36.1 General....................................................2-104
2.36.2 Component Description..........................2-106
2.37 LIGHTING SYSTEMS ..........................2-107
2.37.1 Interior Lighting .....................................2-107
2.38 BLADE DE-ICING SYSTEM...............2-120
2.38.1 Introduction.............................................2-120
2.38.2 Panel Lighting.........................................2-122
2.39 BLADE DE-ICE TEST PANEL............2-125
2.40 FUEL SYSTEM .....................................2-125
2.40.1 Grounding ...............................................2-125
2.40.2 Main Fuel System...................................2-125
2.40.3 Fuel Quantity Indicating System ...........2-128
2.40.4 Fuel Low-Level Warning System .........2-130
2.40.5 Fuel Booster Pump Control Panel .........2-131
2.40.6 Refuel/Defuel System.............................2-131
2.40.7 Fuel Management System ......................2-132
2.40.8 Fuel Overflow Warning System ............2-133
2.40.9 Auxiliary Fuel System............................2-135
2.41 FLIGHT CONTROL SYSTEMS...........2-145
2.41.1 Flight Controls Self-Retaining
Bolts ...................................................2-145
2.41.2 Collective Control System .....................2-145
2.41.3 Collective Stick Assembly .....................2-145
2.41.4 Cyclic Control System ...........................2-145
2.41.5 Cyclic Stick Assembly ...........................2-145
2.42 TAIL ROTOR CONTROL SYS-
TEM ...................................................2-145
2.42.1 Directional Control Pedals .....................2-146
2.42.2 Tail Rotor Quadrant ...............................2-146 ii
2.43 WINDSHIELD ANTI-ICE SYS-
TEM ....................................................2-146
2.43.1 Windshield Washer System .....................2-146
2.44 FIRE DETECTION SYSTEM.................2-146
2.45 FIRE EXTINGUISHING SYS-
TEM ....................................................2-146
2.46 HEATER/VENTILATION SYS-
TEM ....................................................2-150
2.46.1 Arctic Heater System (On Air-
craft Modified by TO 1H-60-
981) .....................................................2-150
2.47 AUXILIARY POWER UNIT
(APU), DESCRIPTION AND
DATA .................................................2-150
2.47.1 APU Model 116305-100 through
116305-300 Series ..............................2-150
2.47.2 APU 3800480-1 and 3800480-2 ..............2-154
2.47.3 APU Controls...........................................2-154
2.47.4 APU System Description .........................2-154
2.48 MISSION FLEXIBILITY KITS..............2-165
2.48.1 Chaff/Flare Dispenser Systems................2-165
2.48.2 IR Suppression Kit ...................................2-165
2.48.3 Hover Infrared Suppression Sys-
tem ......................................................2-165
2.48.4 Armament.................................................2-165
2.48.5 Deleted
2.48.6 Winterization Kit......................................2-165
2.48.7 Rescue Hoist System (General) ...............2-165
2.48.8 Cockpit Rescue Hoist Control
Panel....................................................2-166
2.48.9 Consolidated Control Panel .....................2-166
2.49 CARGO HOOK SYSTEM ......................2-169
2.50 CREWMAN’S CARGO HOOK
PENDANT..........................................2-169
2.51 EXTERNAL STORES SUP-
PORT SYSTEM (ESSS).....................2-169
2.51.1 Horizontal Stores Support ........................2-169
2.51.2 Vertical Stores Pylons..............................2-169
2.51.3 Fixed Provisions.......................................2-169
2.52 LANDING GEAR SNOW SKI
KIT......................................................2-169
2.53 INTEGRATED VEHICLE
HEALTH MONITORING
SYSTEM (IVHMS) ............................2-169
3 PRINCIPLES OF OPERATION ...............................3-1
3.1 ENGINE START AND IGNI-
TION SYSTEM ......................................3-1
3.1.1 APU..............................................................3-1
3.1.2 Engine Crossbleed (One Engine
Operating) ...............................................3-1
3.1.3 External Air Supply .....................................3-1
3.2 TRANSMISSION ........................................3-1
3.3 INSTRUMENT DISPLAY SYS-
TEM (IDS)..............................................3-1
3.3.1 Power Distribution .......................................3-1
3.3.2 System Interface...........................................3-4
3.4 SIGNAL DATA CONVERTER
MODULES .............................................3-5
3.4.1 Lamp Power Supply (A2) ............................3-5
3.4.2 Logic Power Supply (A3) ............................3-5
3.4.3 Interface No. 4 Module (A4)........................3-5
3.4.4 Interface No. 3 Module (A5)........................3-5
3.4.5 Interface No. 2 Module (A6)........................3-5
3.4.6 Interface No. 1 Module (A7)........................3-6
3.4.7 Analog Processor No. 2 Module
(A8).........................................................3-6
3.4.8 Analog Processor No. 1 Module
(A9).........................................................3-6
3.4.9 Digital Processor Module (A10) ..................3-6
3.410 Voltage Regulator Module (A11) ................3-6
3.4.11 Lamp Driver Modules (CDU)......................3-7
3.4.12 Voltage Regulator (A17)..............................3-7
3.4.13 Interface No. 1 Module (A15)......................3-7
3.4.14 Interface No. 2 Module (A16)......................3-7
3.4.15 Digital Readout Module (A18) ....................3-7
3.4.16 Lamp Driver Modules (PDU/
CPDU) ....................................................3-8
3.4.17 Torque Digital Readout Module
(A8).........................................................3-8
3.4.18 Autodim Module (A9) .................................3-8
3.5 CAUTION/ADVISORY WARN-
ING SYSTEM.........................................3-8
3.5.1 Theory of Operation.....................................3-8
3.5.2 Caution/Advisory Warning Panel ..............3-12
3.6 AC ELECTRICAL SYSTEM....................3-13
3.6.1 Auxiliary AC Power...................................3-13
3.6.2 External AC Power ....................................3-13
3.6.3 Functional System Operational..................3-13
3.7 DC ELECTRICAL SYSTEM....................3-18
3.7.1 Primary Power System...............................3-18
3.7.2 Battery System ...........................................3-18
3.7.3 Operating Mode Analysis ..........................3-18
3.8 BLADE DE-ICING SYSTEM...................3-19
3.8.1 Power Distribution .....................................3-19
3.8.2 Ice Detector Operation ...............................3-20
3.8.3 Main Rotor Blade System Auto-
matic Mode Operation ..........................3-20
3.8.4 Tail Rotor Blade System Auto-
matic Mode Operation ..........................3-20
3.8.5 Main and Tail Blade De-Ice Sys-
tem Test Mode ......................................3-21
3.8.6 Icing Rate Meter Test.................................3-22
3.8.7 Main and Tail Blade Manual
Mode Operation ....................................3-22
3.8.8 Main Blade Fail/Fault Detection................3-22
3.9 BLADE DE-ICE TEST PANEL................3-22
3.9.1 Main Rotor Power Monitor........................3-23
3.10 FLIGHT CONTROL SYSTEMS...............3-23
3.11 WINDSHIELD ANTI-ICE ........................3-23
3.11.1 Power Distribution .....................................3-23
3.11.2 Normal Operation ......................................3-23
3.12 FIRE EXTINGUISHING SYS-
TEM......................................................3-24
3.13 FIRE DETECTION SYSTEM...................3-24
3.13.1 Power Distribution .....................................3-24
3.14 HEATER/VENTILATION SYS-
TEM......................................................3-25
Change 5 iii
3.14.1 Ventilation System ...................................3-25
3.14.2 Heater System (APU Operation) .............3-25
3.14.3 Heater System (Engines Operat-
ing) .......................................................3-25
3.14.4 Winterization Mode..................................3-25
3.14.5 Arctic Heater System (APU/En-
gine Operating) (On Aircraft Modified by TO 1H-60-981)...............3-25
3.15 AUXILIARY POWER UNIT
SYSTEM..............................................3-25
3.15.1 Power Interruption....................................3-25
3.15.2 Start Signal ...............................................3-25
3.15.3 Electrical Power........................................3-26
3.16 CHAFF/FLARE DISPENSER
SYSTEMS............................................3-26
3.17 CARGO HOOK SYSTEM.......................3-26
3.17.1 Normal Release.........................................3-26
3.17.2 Manual Release.........................................3-26
3.17.3 Emergency Release...................................3-26
3.17.4 Test Function ............................................3-26
3.18 External Stores Support System
(ESSS) JETTISON SYSTEM .............3-26
3.19 DUAL 185 GALLON AUXILIA-
RY FUEL TANKS ..............................3-26
3.19.1 Fuel Quantity Indicator Operation ...........3-26
3.19.2 BIT Operation...........................................3-26
3.19.3 Fault Code Annunciation .........................3-27
3.19.4 Fault Code Erasure ...................................3-27
3.20 SINGLE 200 GALLON INTER-
NAL AUXILIARY FUEL
TANK (ON AIRCRAFT
MODIFIED BY TO
1H-60-919)...........................................3-27
3.20.1 Fuel Quantity Indicator Operation ...........3-27
4 SERVICING AND CLEANING..............................4-1
4.1 SERVICING ...............................................4-1
4.1.1 Special Tools and Consumables/
Materials.................................................4-1
4.1.2 Service Main Landing Gear and
Tires .......................................................4-1
4.1.3 Service Tail Landing Gear and
Tires .......................................................4-1
4.1.4 Service Engine............................................4-1
4.1.5 Service Hydraulic Pump Modules .............4-1
4.1.6 Service Auxiliary Power Unit
(APU) Accumulator...............................4-1
4.1.7 Service/Drain Main Transmission .............4-1
4.1.8 Service/Drain Intermediate
Gearbox..................................................4-1
4.1.9 Service/Drain Tail Gearbox .......................4-1
4.1.10 Service/Drain APU.....................................4-1
4.1.11 Service Main Rotor Head Damp-
er.............................................................4-1
4.1.12 Refuel..........................................................4-1
4.1.13 Defuel..........................................................4-6
4.1.14 Fuel Transfer from Auxiliary
Tank to Main Tank................................4-9
4.1.15 Drain Engine Oil ......................................4-10
4.1.16 Service Windshield Washer Res-
ervoir ....................................................4-10
4.2 CLEANING ..............................................4-10
4.2.1 Special Tools and Consumables/
Materials...............................................4-10
4.2.2 High Pressure/Hot Water Wash ...............4-10
4.2.3 Clean Flight Controls and Hy-
draulic Deck.........................................4-10
4.2.4 Clean Aircraft Exterior.............................4-11
4.2.5 Clean Engine.............................................4-11
4.2.6 Clean Main and Tail Rotor
Blades...................................................4-11
4.2.7 Clean Main Rotor Head ...........................4-12
4.2.8 Clean Powertrain ......................................4-12
4.2.9 Clean Cargo Hook....................................4-13
4.2.10 Clean Main and Tail Landing
Gear ......................................................4-13
4.2.11 Clean Windshield Wiper Pivot
Studs.....................................................4-13
4.2.12 Clean Tail Wheel Lock Pins....................4-13
4.2.13 Clean Tail Wheel Tow Adapters .............4-14
4.2.14 Clean Main Rotor Slipring and
Brush Block .........................................4-14
4.2.15 Clean Rotor Brake Disc ...........................4-14
5 LUBRICATION........................................................5-1
5.1 LUBRICATION .........................................5-1
5.1.1 Special Tools and Consumables/
Materials.................................................5-1
5.1.2 Lubricate Bifilar .........................................5-1
5.1.3 Lubricate Swashplate..................................5-1
5.1.4 Lubricate Mixer Bellcranks........................5-1
5.1.5 Lubricate Rotary Inputs..............................5-1
5.1.6 Lubricate Landing Gear Shock
Struts ......................................................5-1
5.1.7 Lubricate Stabilator Actuator(s).................5-1
5.1.8 Lubricate Windshield Wiper Piv-
ot Studs ..................................................5-1
5.1.9 Lubricate Windshield Wiper
Converter Shaft ......................................5-1
5.1.10 Lubricate Tailwheel Lockpin .....................5-2
5.1.11 Lubricate Windshield Wiper
Hinge Pin ...............................................5-4
5.1.12 Lubricate Tailwheel Bearings ....................5-4
5.1.13 Lubricate Door Locks.................................5-4
5.1.14 Lubricate Cockpit Door Jettison
Mechanism .............................................5-4
5.1.15 Lubrication Requirements ..........................5-4
6 HANDLING, JACKING, MOORING,
HOISTING, AND SLING LOADING................6-1
6.1 GROUND HANDLING.............................6-1
6.1.1 Special Tools and Consumables/
Materials.................................................6-1
6.1.2 Tow Aircraft ...............................................6-1
6.1.3 Jack Aircraft ...............................................6-3
6.1.4 Level Aircraft .............................................6-6
6.1.5 Tie Down and Moor Aircraft.....................6-6
iv
6.1.6 Fold/Spread Main Rotor Blades.................6-9
6.1.7 Fold/Spread Tail Rotor Blades.................6-18
6.1.8 Fold/Unfold Tail Pylon ............................6-20
6.1.9 Fold/Unfold Stabilator..............................6-27
6.1.10 Install/Remove Tail Cone Tow
Fittings .................................................6-29
6.1.11 Replace Fuselage and Tail Cone
Tiedown Rings.....................................6-29
6.2 APU STARTING .....................................6-29
6.2.1 Before Starting..........................................6-29
6.2.2 APU Start..................................................6-30
6.2.3 APU Shutdown.........................................6-30
6.2.4 Emergency Procedure; APU
Compartment Fire ................................6-30
6.3 EXTERNAL POWER-CON-
NECT ...................................................6-30
6.3.1 Special Tools and Consumables/
Materials...............................................6-30
6.3.2 External Hydraulic Power ........................6-30
6.3.3 External Electrical Power.........................6-31
6.4 COMBAT RUBBER RAIDING
CRAFT (CRRC)/ KANGA-
ROO DUCK (K-DUCK)
PREPARATION/RECON-
FIGURATION .....................................6-33
6.4.1 Special Tools and Consumables/
Materials...............................................6-33
6.4.2 Preparation for (CRRC/K-
DUCK) Loading ..................................6-33
6.4.3 Reconfiguration of Aircraft Fol-
lowing (CRRC/K-DUCK) Re-lease......................................................6-34
7 PREVENTIVE MAINTENANCE IN-
SPECTION...........................................................7-1
7.1 GENERAL..................................................7-1
7.1.1 Scope...........................................................7-1
7.1.2 General Information ...................................7-1
7.1.3 Engine Output Shaft Inspection -
1 to 3 Flight Hours ................................7-1
7.1.4 Main Rotor Blade Tip Cap
Screws - 10 Hour...................................7-1
7.1.5 Gearboxes, Mounting Bolts - 10
Hour Torque Checks..............................7-1
7.1.6 Main Rotor Head - 10 Hour
Torque Checks .......................................7-1
7.1.7 Tail Drive Shaft - Torque Checks
- 10 Hours ..............................................7-1
7.1.8 Pitch Beam Retaining Nut
Torque Check - 10 Hours......................7-1
7.1.9 Tail Rotor - Cable Tension
Check - 9 to 11 Hours...........................7-1
7.1.10 Stabilator Hinge Fitting - Torque
Check - 30 Hours ..................................7-1
7.1.11 After Dual-Engine Operation
with Gust Lock Engaged.......................7-1
7.1.12 After Exceeding 145 KIAS with
Cargo Doors Opened. Do the following before next flight after exceeding 145 KIAS with cargo doors open: ..........................7-1
7.1.13 After Fire Extinguishing System
Discharge (Halon Type) ........................7-2
7.1.14 After First Ground Run..............................7-2
7.1.15 After Operating Transmission
with Oil Temperature Above 140 °C/Oil Pressure Below 20 Pound-Force Per Square Inch
(PSI) .......................................................7-3
7.1.16 Hydraulic Pump/Components.....................7-3
7.1.17 Engine Output Shaft Inspection
After Disconnect ....................................7-3
7.1.18 Engine Whine/High Frequency
Vibration Inspection ..............................7-3
7.1.19 Hard Landing..............................................7-4
7.1.20 Aircraft Subject to Excessive
Spin Rate................................................7-5
7.1.21 Main Rotor Blades Dropped Dur-
ing Blade Fold .......................................7-5
7.1.22 Main Rotor Blades Subject to
High Winds ............................................7-5
7.1.23 Post Lightning Strike Inspection................7-7
7.1.24 Rotor Brake Slippage on Start-
Up.........................................................7-11
7.1.25 Rotor Brake - Every 5 to 15
Stops.....................................................7-11
7.1.26 Sudden Stoppage ......................................7-11
7.1.27 Tail Rotor Out of Balance - Loss
of Material............................................7-13
7.1.28 Transmission System - Over-
speed.....................................................7-13
7.1.29 Transmission System - Over
Temperature .........................................7-14
7.1.30 Transmission System - Overtor-
que ........................................................7-17
A SUPPORT EQUIPMENT AND LIST OF
CONSUMABLES ...............................................A-1
A.1 INTRODUCTION .....................................A-1
A.1.1 General.......................................................A-1 A.1.2 Support Equipment ....................................A-1 A.1.3 Consumables ............................................A-12 v
LIST OF ILLUSTRATIONS
Number Title Page Number Title Page
2-1 General Arrangement...................................... 2-4 2-2 Access and Inspection Provisions .................. 2-6 2-3 Steps Handholds and Walkways .................... 2-8 2-4 Airframe Sections ......................................... 2-10 2-5 Cockpit Structure .......................................... 2-10 2-6 Cabin Structure ............................................. 2-11 2-7 Main Rotor Pylon Structure ......................... 2-13 2-8 Transition Section Structure ......................... 2-13 2-9 Tail Cone Structure....................................... 2-14 2-10 Tail Pylon Structure...................................... 2-15 2-11 Cockpit (Nose Section)................................. 2-16 2-12 Pilot’s/Copilot’s Seats (Simula) ................... 2-17 2-13 Pilot’s/Copilot’s Seats (ARA) ...................... 2-18 2-14 Miscellaneous Cockpit Furnishings.............. 2-19 2-15 Cabin (Midsection) ....................................... 2-21 2-16 Cabin Floors.................................................. 2-21 2-17 Troop Seat Arrangement .............................. 2-23 2-18 Troop Seat Arrangement with Internal
Aux Fuel Tank ......................................... 2-23 2-19 Martin-Baker MBCS13300 Multi-Func-tional Operator’s Seats (On Aircraft Modified by TO 1H-60-895) ................... 2-24
2-20 Transition Section ......................................... 2-24 2-21 Main Rotor Pylon ......................................... 2-25 2-22 Engine Cowling and Work Platform............ 2-25 2-23 Sliding Access Cover.................................... 2-27 2-24 Tail Cone....................................................... 2-27 2-25 Tail Pylon...................................................... 2-28 2-26 Armor Plating................................................ 2-29 2-27 Position Transmitter/Limit Switch As-sembly Parts Location.............................. 2-30 2-28 Landing Gear ................................................ 2-31 2-29 Landing Gear Shock Strut - Cutaway.......... 2-33 2-30 Landing Gear Brake System Location
Diagram .................................................... 2-35 2-31 Main Landing Brake System Block Di-agram ........................................................ 2-36 2-32 Wheel Brakes-Cutaway ................................ 2-37 2-33 Demountable Power Package ....................... 2-38 2-34 Engine............................................................ 2-39 2-35 Engine Operation Schematic ........................ 2-41 2-36 Engine Mounts .............................................. 2-41 2-37 Engine Control System................................. 2-44 2-38 Engine Speed Trim System Block Dia-gram.......................................................... 2-47 2-39 Engine Overspeed System ............................ 2-48 2-40 Engine Warning Systems Block Dia-gram.......................................................... 2-50 2-41 Engine Controls Quadrant ............................ 2-52 2-42 Main Rotor Blade and Pressure Indica-tor.............................................................. 2-54 2-43 Main Rotor Blade Expandable Pins ............. 2-55
2-44 Main Rotor Head and Main Transmis-sion ........................................................... 2-56
2-45 Main Rotor Head .......................................... 2-57 2-46 Main Rotor Head Spindle Module-Cuta-way ........................................................... 2-58 2-47 Tail Rotor System......................................... 2-59 2-48 Tail Rotor Blade ........................................... 2-59 2-49 Transmission System Powertrain ................. 2-61 2-50 Main Transmission........................................ 2-62 2-51 Intermediate Gearbox Installed .................... 2-65 2-52 Intermediate Gearbox-Cutaway .................... 2-65 2-53 Tail Gearbox ................................................. 2-66 2-54 Gust Lock Location Diagram....................... 2-66 2-55 Tail Drive Shaft Location Diagram ............. 2-67 2-56 Rotor Brake System Location Diagram....... 2-68 2-57 Rotor Brake System Block Diagram............ 2-70 2-58 Hydraulic Systems Components................... 2-72 2-59 Hydraulic System Block Diagram................ 2-74 2-60 Primary Servo ............................................... 2-77 2-61 Collective Boost Servo ................................. 2-77 2-62 Yaw Boost Servo .......................................... 2-79 2-63 Roll SAS Actuator ........................................ 2-79 2-64 Pitch/Trim Actuator Assembly..................... 2-80 2-65 Tail Rotor Servo ........................................... 2-80 2-66 APU Hydraulic System Location Dia-gram.......................................................... 2-82 2-67 APU Accumulator......................................... 2-83 2-68 Barometric Altimeter Block Diagram .......... 2-84 2-69 Pitot-Static Pressure System Block Dia-gram.......................................................... 2-85 2-70 Pitot Heater Block Diagram ......................... 2-88 2-71 Standby Compass.......................................... 2-90 2-72 Miscellaneous Switch Panel ......................... 2-91 2-73 Signal Data Converter Parts Location.......... 2-92 2-74 Central Display Unit Parts Location Di-agram ........................................................ 2-93 2-75 Pilot’s Display Unit Parts Location Dia-gram (Typical).......................................... 2-95 2-76 Caution/Advisory Panel (LED) Parts
Location Diagram..................................... 2-96 2-77 Free-Air Thermometer ................................ 2-101 2-78 AC Electrical System General Block
Diagram .................................................. 2-102 2-79 DC Electrical System General Block
Diagram .................................................. 2-105 2-80 Console Lighting Block Diagram .............. 2-109 2-81 Cabin Dome Lights Block Diagram .......... 2-113 2-82 Cockpit Flood Lights Block Diagram........ 2-114 2-83 Utility and Maintenance Lights Loca-tion Diagram........................................... 2-115 2-84 Utility and Maintenance Lights Block
Diagram .................................................. 2-116 vi
2-85 Anti-Collision Lights/Infrared (IR) Strobe Block Diagram ........................... 2-118
2-86 Retractable Landing Light Block Dia-gram........................................................ 2-119
2-87 Cargo Hook Lights Location Diagram ...... 2-121 2-88 Cargo Hook Lights Block Diagram ........... 2-122 2-89 Refuel Probe Light Block Diagram ........... 2-123 2-90 Hoist Floodlight Block Diagram ................ 2-124 2-91 Blade De-Ice Test Panel Parts Location
Diagram .................................................. 2-126 2-92 Fuel Cell Components ................................ 2-127 2-93 Fuel Boost Pump Control Panel................. 2-131 2-94 Overflow Warning Circuit Diagram .......... 2-134 2-95 Auxiliary Fuel Tanks .................................. 2-136 2-96 Internal Auxiliary Fuel Tank Restraint
System .................................................... 2-137 2-97 Fuel and Vent Hoses .................................. 2-138 2-98 Fuel Quantity Indicator............................... 2-139 2-99 Fuel Flow Schematic .................................. 2-140 2-100 Single 185 Gallon Auxiliary Fuel Tank ... 2-142 2-101 Single 200 Gallon Internal Auxiliary
Fuel Tank (On Aircraft Modified by
TO 1H-60-919)....................................... 2-143
2-102 Tail Rotor Quadrant.................................... 2-147 2-103 Windshield Wiper System .......................... 2-148 2-104 Windshield Washer System........................ 2-149 2-105 Heater/Ventilation System Location Di-agram ...................................................... 2-151 2-106 Arctic Heater System Location Diagram
(On Aircraft Modified by TO 1H-60- 981)......................................................... 2-152
2-107 116305 Series APU Fuel Control Sche-matic Diagram........................................ 2-153
2-108 3800480 Series APU .................................. 2-155 2-109 3800480 Series APU Fuel Control As-sembly Schematic Diagram ................... 2-157 2-110 Typical APU Installed ................................ 2-158 2-111 APU Simplified Block Diagram ................ 2-159 2-112 APU System Sequence Chart ..................... 2-161 2-113 APU System Block Diagram...................... 2-163 2-114 Rescue Hoist Controls Location Dia-gram........................................................ 2-167 2-115 Crewman’s Cargo Hook Pendant ............... 2-170 2-116 Landing Gear Snow Ski Configuration...... 2-171 3-1 Pilot’s/Copilot’s Display Unit Power
Distribution Diagram ................................. 3-9 3-2 Pilot’s/Copilot’s Display Unit Signal
Flow Diagram........................................... 3-10 3-3 AC Electrical System Matrix ....................... 3-14 3-4 DC Electrical System Matrix ....................... 3-19 3-5 Flight Controls - Simplified Diagram .......... 3-24 4-1 Prepare to Refuel (Pressure)........................... 4-2 4-2 Defueling......................................................... 4-8 5-1 Lubricate Bifilar.............................................. 5-2 5-2 Lubricate Mixer Bellcranks ............................ 5-3 5-3 Lubricate Door Locks..................................... 5-5 6-1 Tow Aircraft.................................................... 6-2 6-2 Jack Aircraft.................................................... 6-5 6-3 Level Aircraft.................................................. 6-7 6-4 Tie Down Aircraft .......................................... 6-8
6-5 HH-60 Paved Surface Mooring Config-uration....................................................... 6-10
6-6 Fold/Spread Main Rotor Blades................... 6-12 6-7 Fold/Spread Main Rotor Blades................... 6-12 6-8 Fold/Spread Main Rotor Blades................... 6-13 6-9 Fold/Spread Main Rotor Blades................... 6-15 6-10 Fold/Spread Main Rotor Blades................... 6-15 6-11 Fold/Spread Main Rotor Blades................... 6-17 6-12 Fold/Spread Tail Rotor Blades..................... 6-19 6-13 Fold/Spread Tail Rotor Blades..................... 6-19 6-14 Fold/Unfold Tail Pylon................................. 6-21 6-15 Fold/Unfold Tail Pylon................................. 6-22 6-16 Fold/Unfold Tail Pylon................................. 6-23 6-17 Fold/Unfold Tail Pylon................................. 6-24 6-18 Fold/Unfold Tail Pylon................................. 6-24 6-19 Fold/Unfold Tail Pylon................................. 6-25 6-20 Fold/Unfold Tail Pylon................................. 6-26 6-21 Stabilator Folding.......................................... 6-28 6-22 Install/Remove Tail Cone Tow Fittings....... 6-29 6-23 External Hydraulic Power ............................ 6-32 6-24 External Electrical Power ............................. 6-34 7-1 Transmission Core Hole Inspection ............. 7-16 7-2 Transmission Bearing Sleeve Inspection ..... 7-16 FO-1 Principal Dimensions ....................................FP-1 FO-2 Stations, Waterlines and Buttlines ...............FP-5 FO-3 Vibration Absorbers......................................FP-9 FO-4 Engine Control Quadrant............................FP-11 FO-5 Engine Start and Ignition System Loca-tion Diagram...........................................FP-13 FO-6 Engine Start and Ignition System Block
Diagram ..................................................FP-17 FO-7 Engine Indicating Systems Block Dia-gram........................................................FP-23 FO-8 Engine Anti-Ice System Block Diagram ...FP-25 FO-9 Transmission System Schematic Dia-gram........................................................FP-27 FO-10 Main Transmission Lubrication System
Block Diagram .......................................FP-31 FO-11 Main Transmission Oil Temperature and Pressure Warning and Indicating Systems Block Diagram.........................FP-33
FO-12 Main Transmission Chip Detector Sys-tem Block Diagram................................FP-35
FO-13 Hydraulic Systems Schematic Diagram.....FP-37 FO-14 Hydraulic Leak Detection Isolation
Schematic Diagram ................................FP-47 FO-15 Instrument Panel Front View .....................FP-49 FO-16 Pitot-Static Pressure System Location
Diagram ..................................................FP-51 FO-17 Pitot Heater Location Diagram ..................FP-55 FO-18 Instrument Display System Location
Diagram ..................................................FP-57 FO-19 Caution/Advisory Warning System Lo-cation Diagram.......................................FP-61 FO-20 Overhead Console.......................................FP-65 FO-21 AC Electrical System Location Diagram...FP-67 FO-22 DC Electrical System Location Diagram...FP-71 FO-23 Instrument Panel Lights Location Dia-gram........................................................FP-75 FO-24 Instrument Panel Lights Block Diagram ...FP-77 vii
FO-25 Console Lighting Location Diagram ............FP-79 FO-26 Instrument Panel and Consoles Indica-tor Lights Dimming Location Dia-gram.........................................................FP-81
FO-27 Instrument Panel and Consoles Indica-tor Lights Dimming Block Diagram........FP-85
FO-28 Cabin Dome Lights Location Diagram ........FP-87 FO-29 Cockpit Flood Lights Location Diagram......FP-89 FO-30 Exterior Lighting Systems Location Di-agram .......................................................FP-93 FO-31 Formation Lights Block Diagram.................FP-97 FO-32 Controllable Searchlight Block Diagram .....FP-99 FO-33 Hoist Controllable Searchlight Block
Diagram .................................................FP-101 FO-34 Blade De-Icing Kit Location Diagram .......FP-103 FO-35 Blade De-Icing System Block Diagram .....FP-107 FO-36 Blade De-Ice Test Panel Block Diagram....FP-119 FO-37 Fuel System Location Diagram ..................FP-121 FO-38 Refueling Probe Control System Sim-plified Schematic ...................................FP-129 FO-39 Fuel System Block Diagram.......................FP-131 FO-40 Fuel System Block Diagram.......................FP-139 FO-41 Fuel Quantity System Block Diagram
HH-60 ....................................................FP-143
FO-42 Fuel Quantity/Fuel Low Level Warning
Systems Location Diagram....................FP-147 FO-43 Fuel Low Level Warning System Block
Diagram .................................................FP-151 FO-44 Cyclic Stick Grips.......................................FP-153 FO-45 Collective Stick Assembly..........................FP-155 FO-46 Windshield Anti-Ice System Location
Diagram .................................................FP-157 FO-47 Fire Detection System Location Dia-gram.......................................................FP-161 FO-48 Fire Detection System Block Diagram.......FP-163 FO-49 Fire Extinguishing System Block Dia-gram.......................................................FP-167 FO-50 Heater/Ventilation System Block Dia-gram.......................................................FP-169
FO-51 Arctic Heater System Block Diagram (On Aircraft Modified by TO 1H-60-
981) ....................................................... FP-173
FO-52 External Hoist Location Diagram .............. FP-175 FO-53 External Hoist Simplified Block Dia-gram ...................................................... FP-181 FO-54 Cargo Hook System Location Diagram ..... FP-185 FO-55 Instrument Display System Block Dia-gram ...................................................... FP-187 FO-56 Signal Data Converter Power Distribu-tion ........................................................ FP-189 FO-57 Signal Data Converter Signal Flow Dia-gram ...................................................... FP-191 FO-58 Central Display Unit Power Distribu-tion Diagram ......................................... FP-193 FO-59 Central Display Unit Signal Flow Dia-gram ...................................................... FP-195 FO-60 Caution/Advisory Warning System
Block Diagram ....
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .