Atch2_MFWR PWS_Rev_A1.pdf
PDF 554 KB Posted
- Attached to
- Mexico Floodwater Rescue Training (MFWR) Federal contract opportunity
- Solicitation number
- FA251825Q0009
About this file
This Performance Work Statement (PWS) outlines a contract for floodwater rescue training services for Mexico's flood response brigade members, sponsored by NORAD & USNORTHCOM J49. The project will provide eight Floodwater Rescue Operations Level trainings for approximately 140 responders and two Technician Level trainings including boat handling for approximately 30 responders across four locations in Mexico.
The training will be conducted in Spanish and cover comprehensive water rescue skills, including operations-level and technician-level training in swiftwater/floodwater rescue, watercraft operations, rope rescue, and incident command system planning. The contractor is required to develop training materials aligned with National Fire Protection Association (NFPA) standards, provide all necessary equipment (including 140 individual PPE sets and 25 team PPE sets, as well as 22 inflatable boats), and deliver training at multiple Mexican locations. The training aims to build capacity for Mexico's National Water Commission (CONAGUA) regional emergency response centers to improve flood rescue capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFWR QnA2.xlsx | XLSX spreadsheet | |
| FA251825Q0009_Combo_MFWR_A2.pdf | ||
| Atch2_MFWR PWS_Rev_A2.pdf | ||
| Atch3_CLIN_Price_Sheet_A2.xlsx | XLSX spreadsheet | |
| J7 MFWR QnA.xlsx | XLSX spreadsheet | |
| Atch3_CLIN_Price_Sheet_Amend1.xlsx | XLSX spreadsheet | |
| Atch1_Provisions_Clauses.pdf | ||
| Atch2_MFWR PWS_Rev_A.pdf | ||
| Atch3_CLIN_Price_Sheet.xlsx | XLSX spreadsheet | |
| FA251825Q0009_Combo_MFWR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
UNCLASSIFIED
PERFORMANCE WORK STATEMENT (PWS)
FOR
NORAD AND USNORTHCOM J49
ADVISORY AND ASSISTANCE SERVICES (A&AS)
FLOODWATER RESCUE TRAINING
MEXICO, MULTIPLE LOCATIONS
30 May 2025
Rev A1
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
REVISION HISTORY
Revision Description of Change Author Effective Date
Rev A PWS Solicitation N&NC J49 and SAIO 19 May 2025
Rev A1 Updates to Section 6, 9 and Appendix E.
N&NC J49 and SAIO 30 May 2025
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
TABLE OF CONTENTS
1.0 DESCRIPTION OF SERVICES
2.0 ORGANIZATION BEING SUPPORTED
3.0 TRAINING LOCATIONS:
4.0 MISSION:
5.0 BACKGROUND:
6.0 OVERVIEW OF SERVICES REQUIRED:
7.0 CERTIFICATIONS:
8.0 SPECIFIC REQUIREMENTS:
9.0 COURSE SPECIFICATIONS
10.0 PERFORMANCE EVALUATION
11.0 GENERAL INFORMATION
12.0 QUALITY CONTROL
13.0 QUALITY ASSURANCE
14.0 REGULATORY COMPLIANCE
15.0 LANGUAGE PROFICIENCY
16.0 SECURITY REQUIREMENTS
17.0 PHYSICAL SECURITY
18.0 IDENTIFICATION OF CONTRACTOR EMPLOYEES/SUBCONTRACTORS
19.0 DATA RIGHTS
20.0 ORGANIZATIONAL CONFLICT OF INTEREST
21.0 TRANSITION PHASE-IN
APPENDIX A: PUBLICATIONS
APPENDIX B: ACRONYM LIST
APPENDIX C: DELIVERABLES AND PERFORMANCE REQUIREMENTS
APPENDIX D: PERFORMANCE REQUIREMENTS SUMMARY
APPENDIX E: EQUIPMENT LIST
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
1.0 DESCRIPTION OF SERVICES
The NORAD & USNORTHCOM J49 Foreign Humanitarian Assistance (FHA) Program requires Floodwater Rescue Operations Level training, Technician Level training including boat handling, Watercraft Rescue Operations Training, Water Rescue Planning (ICS & SOP Development), Rope Rescue Operations, and Water Rescue Operations Train-the-Trainer, in Spanish, for Mexico’s flood response brigade members. The base of this requirement is four Floodwater Rescue Operations Trainings.
2.0 ORGANIZATION BEING SUPPORTED
NORAD & USNORTHCOM J49
250 VANDENBURG ST.
PETERSON AFB, CO 80914
3.0 TRAINING LOCATIONS:
Four locations for Operations – level training and one to two locations for Technician training will be released to the contractor.
Equipment shall be delivered to the four Operations training locations. Each location shall receive:
o Thirty-five individual personal protective equipment (PPE) sets (140 total).
o Six (6) or seven (7) team PPE sets (25 total).
o Five (5) or six boats (6) with motor (22 total).
o and Five (5) or six boats (6) without motor (22 total).
Specific training locations are outlined in Attachment 1.
4.0 MISSION:
The FHA Program plans, coordinates, and executes FHA to build Partner Nation (PN) capacity and partnerships to respond to shared threats in the sectors of Disaster Preparedness/Disaster Risk Reduction, Health, Basic Education, and Basic Infrastructure.
5.0 BACKGROUND:
USNORTHCOM is conducting this project in partnership with Mexico’s National Water Commission (CONAGUA). This project will provide eight Floodwater Rescue Operations Level trainings for approximately 140 responders, and two Technician Level training including boat handling for watercraft rescue for approximately thirty responders. The intent is to train brigade members with outdated or no flood response training to support rescue during large floods.
USNORTHCOM partners with the Government of Mexico to build capacity and capability in humanitarian assistance sectors, including in disaster response. Mexico’s CONAGUA is responsible for flood response in Mexico, including through twenty-two regional emergency response centers. This contract enables partnership between CONAGUA and USNORTHCOM to enable the regional emergency response centers to conduct and plan flood rescue operations by beginning, refreshing, and advancing responders’ flood rescue skills.
6.0 OVERVIEW OF SERVICES REQUIRED:
This contract will provide Floodwater Rescue Operations Level training and Technician Level training including boat handling for watercraft rescue (Technician training participants will first complete the Operations training). The training and equipment enable support to twenty-two regional response centers, which will each send 6-7 personnel to participate in Operations trainings.
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
The intent is to train response brigade members with outdated or no flood response training to support rescue during large floods through Operations training, that includes introduction to Technician level skills. Approximately thirty brigade members will receive more advanced training to plan and execute water rescue, including in-water rescue and watercraft rescue.
The current expectation is that two(2) Operations courses will be taught in each of four regions, and two(2) Technician courses taught in one or two of the four locations. Trainings shall include a combination of classroom/theoretical training and practical application of floodwater rescue skills. Trainings shall also include validation of skills proficiency through practical application. The trainings shall also include training manuals that detail each National Fire Protection Association (NFPA) skill with adequate detail to enable refresher trainings and skills review. For example, a novice should be able to read and understand the information, without supplementary information from an instructor or expert. Training is for an audience assumed to have no training and therefore should include all necessary prerequisites to effectively participate in the respective level of training (however, all participants in Technician and other optional trainings will have completed the Operations training). This includes low angle rope rescue fundamental techniques required to meet the respective training level. Technician trained personnel should also receive training related to watercraft rescue. Courses shall be taught during different visits to Mexico with at least three weeks between subsequent trainings to enable the Mexican partner organization to support logistics requirements and integrate AAR lessons learned as required.
6.1 The contract shall:
6.1.1 Provide four (4) Floodwater/Swiftwater Operations courses (with introduction to Technician skills), one course at each of four locations.
6.1.2 Options for this contract will include additional Operations courses (with introduction to Technician skills), Technician courses (with introduction to boat handling techniques), an advanced watercraft rescue course, planning course tailored to water rescue technicians with ICS and SOP development, Operations level rope rescue course tailored to water rescue operations, and Water Rescue Operations Train-the Trainer course for the responders who have taken both the Operations and Technician level trainings.
6.1.3 The contractor will develop periods of instruction (POI) and other required training materials for classroom training of Operations and Technician Level training for instructors that aligns with National Fire Protection Association (NFPA) standards in the areas of Swiftwater/Floodwater Rescue, and in the areas of Rope Rescue as applicable.
6.1.4 Certification will be the responsibility of the Mexican government - not the contractor’s. POI translation into Spanish is required if materials are created in or adapted from English. The contractor will also provide course manuals to participants. Training materials shall be tailored to the Mexican context by removing specific references to U.S. organizations, laws and regulations, and disasters (disaster references shall be tailored) and instead including only references relevant to the Mexican context.
6.1.5 The contractor shall provide an opportunity for USNORTHCOM review of POIs in advance of trainings. All instruction shall avoid politically sensitive topics including U.S. and Mexico bilateral policy, sensitive current events, and examples related to race, sex, creed, etc.
6.1.6 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a reference of how to execute all NFPA skills at the level being taught. The trainings shall also include training manuals that detail each NFPA
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
skill with adequate detail to enable refresher trainings and skills review. For example, a novice should be able to read and understand the information, without supplementary information from an instructor or expert.
6.1.7 The contractor shall purchase and deliver to each of the four Operations locations thirty-five sets of individual personal protective equipment (PPE) enabling individuals to conduct water rescue for a total of 140 sets. The contractor shall purchase and deliver to each of the four Operations locations at least five and no more than six inflatable boats without motors for a total of 22. The contractor shall purchase and deliver to each of the four Operations locations at least five and no more than six inflatable boats with motors for a total of 22. The contractor shall also purchase and deliver at least six and no more than seven sets of team personal protective equipment to each of the four Operations locations for a total of 25 sets. See Appendix E for specifics.
6.1.8 The project will provide a small amount of materials as training aids in addition to the equipment. Contractor shall supply a limited amount of materials (training aids and equipment) required to achieve hands-on training that are not included in the equipment purchase in Appendix E. This may include small tools, consumable items, and hardware items/materials used for obstacle and other training aid preparation.
6.1.9 Trainings shall include end-to-end teaching and practical application of all skills, with participants able to demonstrate their execution by the course’s end. Participants will be assumed to be starting with no prior training or experience, except the ability to swim (participants in Technician-level and other optional trainings will have participated in the Operations training provided under this contract).
7.0 CERTIFICATIONS:
7.1 All instructors shall be certified at the NFPA Technician level in Swiftwater or Floodwater rescue and have demonstrated evidence of training conducted at the Technician level in Floodwater or Swiftwater rescue.
7.2 Rope rescue instructors shall be certified at the NFPA Technician level in Rope Rescue and have demonstrated evidence of training conducted at the Technician level in Rope Rescue.
7.3 Planning course instructors shall have evidence of completion of at least Incident Command System level 100 and 200 training, and evidence of instruction in the Incident Command System and Water Rescue incident planning.
8.0 SPECIFIC REQUIREMENTS:
8.1 REQUIREMENT 1: PROVISION OF FLOODWATER/SWIFTWATER RESCUE
TRAINING
8.1.1 The contractor shall provide all labor, training materials, supplies, transportation, and all other items and/or non-personnel services necessary to complete eight Operations courses (two in each of four regions) and two Technician courses at one or two locations.
8.1.2 Prepare training materials in Spanish for each of the courses with specifications detailed below.
8.1.2.1 Tailor training materials to the Mexican context by removing specific references to U.S. organizations, laws and regulations, and tailoring disasters examples and instead include only references relevant to the Mexican context, while still meeting
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
training standards. Present and discuss the draft schedule and training materials during conference calls with Department of Defense (DOD) representatives.
8.1.3 Prepare training manuals in Spanish for the classes, 25 per Operations course, and twenty per Technician course (includes training materials for expected number of participants and additional 5 sets).
8.1.4 Ship or deliver the training manuals to each of the training sites in Mexico prior to the beginning of each class. Travel to and from the training sites (one day travel time each way for each class with additional day for setup if required).
8.1.5 Coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
8.1.6 Conduct the courses in Mexico.
8.1.7 Prepare and send reports to the COR, including monthly activity and financial reports, for each course a one-page post-class after action report, and final AAR after the completion of all courses (reports shall be submitted in English using Microsoft Office software within time frames stipulated in the contract schedule).
8.1.8 Provide a small amount of materials as training aids and some equipment. Contractor supplies a limited amount of materials (training aids and equipment) required to achieve hands-on training that are not included in the equipment delivered by the contractor. This may include small tools, consumable items, and hardware items/materials used for obstacle and other training aid construction. Deliver additional training materials and aids before the beginning of each course, as required.
9.0 COURSE SPECIFICATIONS
The contractor shall conduct the following trainings (two distinct courses) with the specifications detailed below.
9.1.1 Water Rescue Operations + Technician Fundamentals Training
9.1.1.1 Water rescue training shall include four trainings, each taking place over forty hours with twenty participants. The contract includes an option for an additional four trainings.
9.1.1.2 Training shall enable participants to acquire the knowledge and skills to support Technician level Floodwater/ Swiftwater operations to respond to floods and incidents and accidents in rivers, lakes, and dams, as well as techniques for non-entry rescue and fundamentals of entry rescue. Additionally, students receive the fundamentals of boat handling and rope rescue.
9.1.1.3 Content shall include all Floodwater/Swiftwater Rescue Operations Level NFPA 1006 standard training requirements and introduce Technician-level concepts.
9.1.1.4 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all NFPA skills at the level being taught.
9.1.1.5 The training audience will include flood response brigade members.
Candidates will have the ability to swim. Candidates may have some experience in water rescue but should be assumed to be starting from zero experience.
9.1.1.6 The equipment delivered by the contractor will be available for the training (Appendix E).
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
9.1.1.7 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river, and space for land drills. Contractor shall coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.1.8 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the equipment list (Appendix E).
9.1.2 Water Rescue Technician & Watercraft Training (Option)
9.1.2.1 Water rescue training shall include two trainings, each taking place over forty hours with fifteen participants. The contract includes an option that includes both of the two Technician trainings.
9.1.2.2 Training shall enable participants to acquire the knowledge and skills to develop action plans to respond to floods and incidents and accidents in rivers, lakes, and dams, as well as techniques for entry rescue including watercraft rescue and boat handling techniques.
9.1.2.3 Content shall include all Floodwater Rescue Technician Level NFPA 1006 standard training requirements.
9.1.2.4 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all NFPA skills at the level being taught.
9.1.2.5 The training audience will include flood response brigade members.
Candidates will complete the Operations/Technician Fundamentals course provided under this contract.
9.1.2.6 The equipment delivered by the contractor will be available for the training (Appendix E).
9.1.2.7 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river, and space for land drills. Contractor shall coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.2.8 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the equipment list in Appendix E.
9.1.3 Water Rescue Planner, Incident Command System (ICS) + SOP Development (2 Options)
9.1.3.1 Each water rescue planner training shall take place over forty hours with twenty participants. The contract includes an option for each of two trainings.
9.1.3.2 Training shall provide functional understanding of Incident Command System levels 100 and 200, their principles and application, application of ICS to a Swiftwater/Floodwater rescue incident, review of action plans development, and workshop on development of Standard Operating Procedures for water rescue based on ICS principles.
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
9.1.3.3 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all skills at the level being taught.
9.1.3.4 The training audience will include flood response brigade members. Candidates will complete the Operations/Technician Fundamentals course and Water Rescue Technician / Watercraft Training provided under this contract.
9.1.3.5 Equipment in the list included in APPENDIX E will be provided by the contractor and available for the course.
9.1.3.6 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river (if required), and space for land drills (if required). Contractor shall coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.3.7 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the Appendix E equipment
9.1.4 Swiftwater Watercraft Operations Course (2 Options)
9.1.4.1 Each Swiftwater watercraft operations course shall take place over forty hours and will include approximately fifteen participants. There is an option for each of two courses.
9.1.4.2 Instruction shall be given on Swiftwater/Floodwater watercraft operations including water dynamics and hazards recognition, identifying contamination and decontamination procedures, boat handling, boat inspections and maintenance, rope skills, self-rescue, rescue techniques and victim transport, and introduction to watercraft procedures development.
9.1.4.3 Instruction shall include instruction and practice of all Swiftwater/Floodwater Watercraft Operations knowledge and skills in NFPA 1670, Ch 21, from sec 21.3.1 through 21.3.5.
9.1.4.4 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all NFPA skills at the level being taught.
9.1.4.5 The training audience will include flood response brigade members. Candidates will complete the Operations/Technician Fundamentals course and Water Rescue Technician and Watercraft Training provided under this contract.
9.1.4.6 Equipment in the list included in APPENDIX E will be provided by the contractor and available for the course.
9.1.4.7 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river, and space for land drills. Contractor shall coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.4.8 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the Appendix E equipment.
9.1.5 Rope Rescue Operations (2 Options)
9.1.5.1 Rope rescue operations course shall take place over forty hours with fifteen participants. There is an option for each of two courses.
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
9.1.5.2 Participants shall be provided instruction on Rope Rescue Operations knowledge and skills including safety, PPE and equipment selection, knots, anchors, belay techniques, mechanical advantage, raising and lowering systems, ascending and rappelling, high-line systems set up, patient packaging, construction of single and multiple point anchor systems, fixed rope systems, litter tending, compound mechanical advantage systems, and problem solving, and selection and practice of common systems used in water rescue.
9.1.5.3 Course shall include theory and practice on all Rope Rescue Operations knowledge and skills in NFPA 1006, Ch 5, sec 5.2.1 through 5.2.24.
9.1.5.4 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all NFPA skills at the level being taught.
9.1.5.5 The training audience will include flood response brigade members.
Candidates will complete the Operations/Technician Fundamentals course and Water Rescue Technician and Watercraft Training provided under this contract.
9.1.5.6 PPE in the list included in APPENDIX E will be provided by the contractor and available for the course.
9.1.5.7 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river, and space for land drills. Contractor shall coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.5.8 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the Appendix E equipment.
9.1.6 Operations Train-the-Trainer (Option)
9.1.6.1 Course instruction provided to twenty personnel on providing an Operations-level Swiftwater/Floodwater course as instructors.
9.1.6.2 Participants shall be provided refresher instruction on all Operations knowledge and skills, theory on teaching adult learners, theory and practice of module development, and teachbacks. Operations review shall include knowledge and skills to provide support to Technicians in Floodwater/ Swiftwater Operations to respond to floods and incidents and accidents in rivers, lakes, and dams, as well as techniques for non-entry rescue and fundamentals of entry rescue, as well as fundamentals of boat handling and rope rescue.
9.1.6.3 Course manuals shall be created for participants that include detailed descriptions of all skills taught. Participants should be able to use it as a complete reference of how to execute all NFPA skills at the Operations level. This manual will provide a basis for the participants to be able to teach future courses.
9.1.6.4 The training audience will include flood response brigade members. Candidates will complete the Operations/Technician Fundamentals course and Water Rescue Technician and Watercraft Training provided under this contract.
9.1.6.5 Equipment in the list included in APPENDIX E will be provided by the contractor and available for the course.
9.1.6.6 Mexican partners will provide adequate facilities that include a classroom space, practical training range with a river, and space for land drills. Contractor shall
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
coordinate with CONAGUA, with USNORTHCOM as the intermediary, for course logistics of set up and execution.
9.1.6.7 Instructors shall provide training materials as required: Training aids, flipchart/dry erase board, markers, and other equipment and supplies necessary for instruction that is not included in the Appendix E equipment.
9.2 REQUIREMENT 2: EQUIPMENT PURCHASE AND DELIVERY
The contractor shall be responsible for the procurement, transportation, and delivery of new fully functioning equipment as requested in Appendix E. The contractor shall transport and deliver the equipment to each of the four training locations as detailed below, including meeting customs requirements for entry into Mexico if applicable. If substitutions are required, the contractor shall coordinate with the Contracting Officer Representative (COR) to determine suitability, ensure items meet local regulations, and adhere to Defense Security Cooperation Agency, Security Assistance Management Manual, Ch 12 (SAMM Ch 12). The contractor will be responsible for all equipment damaged during transport and installation and will ensure equipment functions at 100% following delivery. A list of equipment that will be provided is included in the solicitation (APPENDIX E).
9.3 The contractor shall provide materials on usage and sustainment for users including needed updates, warranty information, troubleshooting, information on contacting manufacturer, and translated manuals, in Spanish.
9.4 The contractor shall purchase and deliver to each of the four Operations locations thirty-five sets of individual personal protective equipment (PPE) enabling individuals to conduct water rescue for a total of 140 sets. The contractor shall purchase and deliver to each of the four Operations locations at least five and no more than six inflatable boats without motors for a total of 22. The contractor shall purchase and deliver to each of the four Operations locations at least five and no more than six inflatable boats with motors for a total of 22. The contractor shall also purchase and deliver at least six and no more than seven sets of team personal protective equipment to each of the four Operations locations for a total of 25 sets.
See Appendix E for specifics.
9.5 The contractor shall ensure placement of USNORTHCOM Humanitarian Assistance Program logo, through placement of stickers, paint or any permanent mean into each piece of equipment, item or supply. USNORTHCOM will provide stickers. This program branding doesn’t apply to delivered expendables items.
9.6 REQUIREMENT 3: REQUIRED PERIODIC REPORTS, BRIEFINGS,
AND MEETINGS
Post-Award Conference or Periodic Progress Meetings: The Contractor agrees to attend any post-award conference convened by the contracting activity in accordance with FAR Subpart 42.5. The CO, COR, and other government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the CO and/or COR will apprise the Contractor of how the government views the Contractor's performance, and the Contractor will apprise the government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government and
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
may be conducted by telephone or other electronic means at the Government’s discretion.
10.0 PERFORMANCE EVALUATION
Contractor performance is subject to Government surveillance to ensure PWS compliance. The Contractor shall comply with the following:
10.1 Access
The Contractor shall permit the CO, COR or authorized government representatives’ access to all work areas, records, and data used in the performance of the contracted services. The Contractor shall provide support, and not interfere with the CO, Contracting Officer’s Representatives (CORs), state, federal, and other designated personnel in the performance of their official duties. The Contractor shall provide access as soon as possible, but not to exceed one (1) workday after the request.
10.2 Non-conformance
The Contractor shall identify root causes of non-conformances and shall control them through analysis, corrective actions, and preventive actions. The Contractor shall focus on eliminating the cause to prevent reoccurrence. The Contractor shall maintain records of non-conformities and actions taken. The Contractor shall correct and provide responses to all Government-identified non-conformances in accordance with (IAW) time frames specified by the CO. There are two types of non-conformances: Minor and Major.
10.3 Minor Non-conformance.
A Minor Non-conformance is a non-conformance, which by itself does not adversely impact mission, safety of personnel and equipment, performance (quality), schedule (delivery), or cost. A Minor Non-conformance does not normally increase risk to the Government. Minor Non-conformances are typically low risk and are communicated through a Corrective Action Request (CAR) notice. First notices are issued for any identified non-conformance, second notices are issued for repeat non-conformances or failing to correct issues within a reasonable amount of time. Upon receipt of a non-conformance notification (first or second notice), the Contractor shall complete applicable sections and return it to the CO within time constraints directed by the CO in the notice. A formal corrective action plan may not be required for minor CAR notices.
10.4 Major Non-conformance.
A Major Non-conformance is a non-conformance that adversely impacts (or has the potential to impact) mission, safety of personnel and equipment, performance (quality), schedule (delivery), or cost. A Major Non-conformance may also be a significant number of recurring non-conformances, which is an indication of inadequate preventive measures or actions and lowers the Government’s confidence that the Contractor can provide quality services on time and within costs. The CO will communicate Major Non-conformances using the CAR notice and will include a suspense date for the Contractor’s Corrective Action Plan. As a minimum, the Contractor’s Corrective Action Plan shall address:
Actions taken to fix the immediate problem
Root cause analysis of the problem to determine cause
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
Corrective action on the cause of the problem
Actions taken to prevent recurrence
11.0 GENERAL INFORMATION
12.0 QUALITY CONTROL
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirements of the contract. An electronic copy of a comprehensive written Quality Control Plan (QCP) shall be delivered to the COR within 7 days after contract award, and within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
13.0 QUALITY ASSURANCE
The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
14.0 REGULATORY COMPLIANCE
The contractor is responsible for complying with all federal, business, state, and local laws applicable to their operations. Contractor bears the responsibility to validate other partners (including subcontractors, if applicable) also adhere to all applicable regulations.
15.0 LANGUAGE PROFICIENCY
All Courses shall be taught in Spanish. The contractor and/or subcontractor performing work under this contract shall understand, write, and speak in Spanish. The trainer(s) must have full professional or primary spoken fluency and full professional or primary written fluency in Spanish to execute the requirements of this PWS at no additional costs to the Government.
16.0 SECURITY REQUIREMENTS
Special consideration shall be given to security challenges in Mexico when sharing information on contract activities. The contractor is responsible for ensuring contractor and any subcontractors obtain appropriate clearances required for the work performed. The contractor shall comply with all travel requirements of the State Department, Department of Defense, and U.S. Embassy and relevant offices.
16.1 Operations Security (OPSEC)
The Contractor shall adhere to Operations Security (OPSEC) guidance: Be familiar with the organization’s Critical Information and Indicator List (CIIL) and OPSEC Plan (if applicable).
Protect critical and sensitive information from disclosure. The Government will provide the CIIL, OPSEC Plan, and AFI 10-701, OPSEC, to include conducting initial OPSEC training by
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
the OPSEC PM/Signature Manager within (per the AFI, this is not to exceed 90 days but may be sooner to fit your needs) of contract award.
16.2 Controlled Unclassified Information (CUI):
The Contractor shall safeguard all information provided and marked as CUI via this contract IAW DoD Instruction (DoDI) 5200.48, Controlled Unclassified Information (CUI). If the Contractor generates any CUI information, it shall protect and disseminate that information per the controls required by DoDI 5200.48. The Contractor shall monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. The Contractor shall immediately report the potential classification of aggregated or compiled CUI to the CO and the COR.
17.0 PHYSICAL SECURITY
The contractor is responsible for safeguarding and returning all assets at the completion of project should contractor need access to government sourced equipment, intellectual property, and/or materials. The contractor is responsible for ensuring the safety of instructors, participants, and personnel supporting the training and shall adhere to safety requirements and applicable standards for conducting all trainings and other activities of this PWS.
18.0 IDENTIFICATION OF CONTRACTOR EMPLOYEES/SUBCONTRACTORS
The contractor shall identify all contract personnel whose interactions may not immediately indicate their contractor status to avoid creating an impression to the public that they are Government Officials. The contractor shall ensure all documents and/or products are suitably marked as contractor products and contractor participation is appropriately disclosed.
19.0 DATA RIGHTS
The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the COR. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
20.0 ORGANIZATIONAL CONFLICT OF INTEREST
Contractor and subcontractor personnel performing work under this contract may be part of existing engagements, receive, have access to/or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the COR in writing whenever such access or participation may result in any actual or potential OCI and shall promptly submit a plan to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the COR. In the event the COR unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the COR may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
21.0 TRANSITION PHASE-IN
The Contractor shall apply industry standards and reasonable due diligence to ensure Contractor employees providing services on this contract do not pose a threat to the health, safety, security, general well-being or operational mission of the Government’s or training recipient’s facilities and their populations.
21.1 The Contractor shall cooperate with the Contracting Officer Representative (COR) to ensure a smooth and orderly transition. Identify any conflicts to the Contracting Officer
(CO).
21.2 GOVERNMENT FURNISHED PROPERTY (GFP)
21.2.1 HARDWARE
None.
21.2.2 SOFTWARE
None.
21.3 GOVERNMENT FURNISHED INFORMATION
Government personnel will provide technical input, answer questions, review/approve completed work, review/approve training schedule, training materials, and equipment lists, and provide feedback regarding the Contractor efforts. The Contracting Officer Representative (COR) will be the primary source of technical guidance for this contract. Copies of reference materials cited in the PWS paragraph, subparagraphs, and Appendix will be provided to the Contractor.
ATTACHMENTS:
1. Delivery Locations
UNCLASSIFIED
APPENDIX A: PUBLICATIONS
Publications, forms, memorandums, and policy letters that apply to the TO are listed below. The contractor can access unclassified forms and publications on the Internet at: https://www.e-publishing.af.mil/ the Joint Travel Regulation (JTR) website at https://www.defensetravel.dod.mil/site/travelreg.cfm and the Federal Acquisition Regulation website at https://www.acquisition.gov/browse/index/far
The publications listed in this section are generally referenced in the PWS. The Directive/Guidance (D/G) column indicates the extent of contractor compliance with the publication that is prescribed by the PWS. A “D” in the column means the publication is a “directive publication,” that requires mandatory compliance by the Contractor. A “G” in the column means the publication is a “guidance publication.” These publications provide guidance for the contractor to perform particular tasks or operations in a manner compatible with Air Force procedures. However, the contractor is required to comply with the intent of the publication.
Additionally any procedures developed by the contractor shall be compatible with the intent of the “G” publications. *D/G stands for Directive and/or Guidance
Regardless of the date listed for the publications below, the contractor is responsible for complying with or utilizing the latest versions of the publications listed, throughout the life of the TO.
*D/G Document
Number
Document
Title Date
D FAR 48 CFR 1 Federal Acquisition Regulation 16 Mar 2023
G DoDI 2000.16 DoD Antiterrorism (AT) Standards 22 Feb 2022
D JTR Joint Travel Regulation 01 Mar 2023
D DoDI 5132.14 Assessment, Monitoring, and Evaluation Policy for the Security Cooperation Enterprise
13 Jan 2017
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
*D/G Document
Number
Document
Title Date
G SAMM Ch 12 Defense Security Cooperation Agency, Security Assistance Management Manual, Ch 12
7 June 2019
APPENDIX B: ACRONYM LIST
Acronym Description
CFR Code of Federal Regulations
CO Contracting Officer
COR Contracting Officer Representative
CONAGUA National Water Commission (Comision Nacional de Agua)
DFARS Defense Federal Acquisition Regulation Supplement
D/G Directive/Guidance
DOD Department of Defense
DoDI Department of Defense Instruction
FAR Federal Acquisition Regulation
FHA Foreign Humanitarian Assistance
JTR Joint Travel Regulations
NFPA National Fire Protection Association
O&M Operations and Maintenance
OCI Organizational Conflict of Interest
ODC Office of Defense Coordination
PN Partner Nation
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
Acronym Description
POC Point of Contact
POI Period of Instruction
PPE Personal Protective Equipment
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QC Quality Control
QCP Quality Control Program
APPENDIX C: DELIVERABLES AND PERFORMANCE REQUIREMENTS
Deliverable Frequency Medium/Format Submit To
Prepare draft schedule Within 2 weeks of award
Electronic copy Christine.n.myers5.ci v@mail.mil
Prepare training materials, POIs & certificates of attendance
1 month prior to scheduled training
Electronic copy, editable
Christine.n.myers5.ci v@mail.mil
Prepare course manuals 1 month prior to scheduled training
Electronic copy, editable
Present & discuss the schedule, training materials, POIs, training manuals, and certificates of attendance
3 weeks prior to scheduled training
Electronic copy, editable
Christine.n.myers5.ci v@mail.mil
Revise schedule, training materials, training manuals, and certificates of attendance based on discussions
10 days prior to scheduled trainings
Electronic copy for customer and physical and electronic copies for training audience
Christine.n.myers5.ci v@mail.mil
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
Deliverable Frequency Medium/Format Submit To
Print & ship /carry training materials and manuals to training sites
Prior to scheduled training
Electronic copy for customer and physical and electronic copies for training audience
Travel to and from training sites Arrival on time for scheduled training;
departure after training completion
Conduct courses at four locations in Mexico
Conduct courses as scheduled
In-person instruction
Create planned equipment proposal
Prior to equipment purchase
Electronic copy
Present & discuss the equipment list
Within two months of contract award
Virtual meeting Christine.n.myers5.ci
Revise equipment list based on discussions
Within two months of contract award
Electronic copy Christine.n.myers5.ci
Purchase equipment Within two months of contract award
Equipment
Deliver equipment to four locations in Mexico
Within two months of equipment purchase and prior to scheduled courses
Equipment
Monthly activity, project status, and financial report
NLT 2359 MST
on the 1st of each month
Electronic copy Christine.n.myers5.ci v@mail.mil;
Post class AAR Within 10 days of completed course
Electronic copy
Christine.n.myers5.ci
Final AAR Within 30 days of completion of last course
Electronic copy Christine.n.myers5.ci
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
Deliverable Frequency Medium/Format Submit To
QCP Within 7 days of award
Electronic copy
APPENDIX D: PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items.
Performance Objective Standard Performance Threshold
Method of Surveillance
(SS-1) Prepare draft schedule Contractor provided draft schedule on time & updates as needed
Draft schedule presented within 2 weeks of contract award, and updates within one week of receiving feedback.
One week deviation allowed for draft schedule and updates.
100% Inspection
COR
verifies receipt
(SS-2) Prepare training materials & certificates
Contractor provided draft training materials in fluent Spanish, on time, with appropriate content
POIs and manuals presented one month before scheduled course.
Two-week deviation allowed.
100% Inspection
COR
verifies receipt
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
(SS-3) Present & discuss the schedule, training materials and certificates
Contractor sent materials, presented and discussed with NC & COR
Meet with government at least three weeks before scheduled course. 1 week deviation allowed.
100% Inspection
COR
confirms meeting held
(SS-4) Revise schedule, training materials and certificates based on discussions
Contractor revised materials and addressed all issues raised during discussions
Government feedback integrated into POIs and manuals within 2 weeks of receiving feedback.
Deviation allowed until 10 days prior to scheduled training start.
100% Inspection
COR
verifies feedback integrated
(SS-5) Print & ship training materials to training sites
Contractor shipped an adequate number of manuals and any required training aids to each site before each class started
This criteria is met if the required number of manuals and all training aids are on site at the scheduled course start.
No deviation allowed since course materials are mission essential.
100% Inspection
COR
verifies training begins on time with all requirements including materials
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
(SS-6) Travel to and from training sites
Contract instructors traveled to training sites, arrived on time before classes started, and departed promptly after classes ended
Instructors arrive before the class start, and with adequate time to prepare the course site and materials to begin the course on schedule. Two hours deviation is allowed (course can start two hours late) to account for unanticipated challenges.
100% Inspection
COR
verifies training begins on time with all requirements including materials
COR
approves travel plan before travel as part of travel coordination to meet
NNC travel requirements
(SS-7) Conduct classes at four locations in Mexico
Contractor conducted 4 classes at 4 sites with qualified bilingual instructors
Contractor must conduct all contracted courses.
100% Inspection
COR verifies execution through field reports &
AAR
(SS-8) Create planned equipment proposal
Contractor submitted equipment meeting specifications of the contract within two months of contract award
Contractor submits equipment meeting specifications of the contract within two months of contract award. An additional two weeks are allowed to account for unanticipated challenges.
100% Inspection
COR verifies receipt
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
(SS-9) Present & discuss the equipment list
Contractor presented equipment list within two months of contract award
Contractor meets with Government to discuss equipment proposal within two months of contract award. An additional two weeks are allowed to account for unanticipated challenges.
100% Inspection
COR
confirms meeting held
(SS-10) Revise equipment list based on discussions
Contractor made modifications based on government feedback within two weeks of government meeting
Contractor made modifications based on government feedback within two weeks of government meeting. An additional week is allowed to account for unanticipated challenges.
100% Inspection
COR
verifies feedback integrated
(SS-9) Purchase equipment Equipment purchased that is new and matches proposed equipment list with revisions within two months of contract award
Equipment purchased that is new and matches proposed equipment list with revisions within two months of contract award. An additional one month is allowed to account for unanticipated challenges.
100% Inspection
COR receives update on equipment purchase
(SS-10) Deliver equipment to four locations in Mexico
Equipment delivered to CONAGUA in four regions and arrival and functionality verified within two months of purchase
Equipment delivered to CONAGUA in four regions and arrival and functionality verified within two months of purchase. Contractor coordinates with Government to receive verification of functionality. An additional 2 months allowed for unforeseen customs delays only.
Equipment must arrive before the beginning of the course.
100% Inspection
COR receives update on equipment delivery and coordination with Contractor on verification
UNCLASSIFIED
PERFORMANCE WORK STATEMENT
(SS-11) Prepare reports (monthly activity and financial, post class AARs, final AAR )
Contractor provided accurate reports on time
Monthly reports delivered by NLT 2359 MST on the 1st of each month. One week deviation allowed. Post class AAR delivered within 10 days of course completion. Final AAR delivered within 30 days of completion of final course.
100% Inspection
COR
confirms
AAR report receipt through course CLIN invoice approval and receipt of other reports
(SS-12) Prepare QCP Contractor provides QCP within 7 days of award
Contractor provides QCP within 7 days of award.
Two working days deviation allowed.
100% Inspection
CO receives
QCP
APPENDIX E: EQUIPMENT LIST
21.4 Team PPE: 25 Sets shall be procured and delivered to four locations according to paragraph 9.2, Requirement 2 Equipment purchase and delivery. The quantity for each equipment item below is the quantity required PER SET of Team PPE. According to PWS 9.4 “The contractor shall … purchase and deliver at least six and no more than seven sets of team personal protective equipment to each of the four Operations locations for a total of 25 sets.”
Spine Board M
OBI 1A6A or equivalent
1 Spine board with safety belts, flotable and x-ray translucent. 72"X18"X2", 17lbs, load bearing 350lbs., FDA, CE, and ISO 9001 certified
Stokes basket - CMC traverse advantage plastic stretcher or equivalent
Weight: 29 lb (13.2 kg) Dimensions: 85 x 23.5 x 7.5 in (216 x 60 x 19 cm)
UNCLASSIFIED
Internal stainless steel frame, high density polyethylene shell, smooth bottom surface for sliding. Second rail for tying the patient and cutouts for litttery carrying. Strat load attachment points inside frame rails.
Load Rating: 11.1 kN (2,500 lbf). UL certified to the NFPA 2500(1983) standard
Full body rescue harness, NFPA Cl III, lg - Petzl AVAO® Bod Full Body Harness or equivalent https://shopmtn.com/products/petzl-harness-avao-bod?variant=29254304366670¤cy=USD&utm_medi um=product_sync&utm_source=google&utm_content=sag _organic&utm_campaign=sag_organic&gad_source=1&gcl id=Cj0KCQjwmt24BhDPARIsAJFYKk1BMj-2i3EXOg- AuSMz2I3blXhPWQVd-h5JIYUQiPQwBsq7pjrCDNMaAgmtEALw_wcB
1 NFPA Class III, ANSI Z359.11, CSA Z259.10 Ventral Attachment Point: Attachment for a descender or positioning lanyard for use in single mode Lateral Attachment Points: Attachment for a positioning lanyard for use in double mode Sternal Attachment Point: Fall arrest system attachment Dorsal Attachment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .